December 2004 Monthly Operating Report for Sequoyah Nuclear Plant
ML050120274
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/11/2005
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050120274 (4)


Text

January 11, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - DECEMBER MONTHLY OPERATING REPORT The enclosure provides the December Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT DECEMBER 2004 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

OPERATING DATA REPORT 50-327 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

Sequoyah 1 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)

1.
2.
3.
4.
5.
6. Net Electrical Energy Generated (MWHrs)

Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours January 06, 2005 December 2004 744.00 8,094.73 140,083.18 744.00 8,028.00 138,012.58 878,655.00 9,290,475.00 150,925,693.0 0.00 0.00 0.00 1,160.00 1,148.00 Renee McKaig (423)843-8963 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)

Type F: Forced S: Scheduled Date No.

SUMMARY

Unit 1 gross maximum dependable capacity factor was 102.6 percent for the month of December 2004.

1 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)

Page 1

OPERATING DATA REPORT 50-328 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

Sequoyah 2 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)

1.
2.
3.
4.
5.
6. Net Electrical Energy Generated (MWHrs)

Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours January 06, 2005 December 2004 744.00 8,395.95 145,120.18 744.00 8,353.38 142,853.34 857,177.00 9,464,893.00 153,447,264.0 0.00 0.00 0.00 1,160.00 1,124.00 Renee McKaig (423)843-8963 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)

Type F: Forced S: Scheduled Date No.

SUMMARY

Unit 2 gross maximum dependable capacity factor was 102.2 percent for the month of December 2004.

1 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)

Page 2