Minutes of Internal Meeting of the Davis-Besse Nuclear Power Station IMC 0350 Oversight Panel
ML022970121
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/18/2002
From: Grobe J
NRC/RGN-III
To:
References
FOIA/PA-2005-0261
Download: ML022970121 (16)


Text

October 18, 2002 MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE NUCLEAR POWER STATION IMC 0350 OVERSIGHT PANEL The implementation of the Manual Chapter 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held September 17, 2002. Attached for your information are the minutes from the internal meeting of the IMC 0350 Oversight Panel and the Action Items List.

Attachment:

As stated cc w/att: S. Rosenberg, OEDO W. Dean, NRR A. Mendiola, NRR D. Pickett, NRR S. Bloom, NRR J. Dyer, RIII J. Caldwell, RIII G. Grant, RIII S. Reynolds, RIII C. Lipa, RIII D. Hills, RIII L. Collins, RIII D. Passehl, RIII D. Simpkins, RIII J. Jacobson, RIII S. Burgess, RIII R. Lickus, RIII S. Thomas, RIII M. Holmberg, RIII J. Collins, RIII DB0350

MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE NUCLEAR POWER STATION IMC 0350 OVERSIGHT PANEL The implementation of the Manual Chapter 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held September 17, 2002. Attached for your information are the minutes from the internal meeting of the IMC 0350 Oversight Panel and the Action Items List.

Attachment:

As stated cc w/att: S. Rosenberg, OEDO W. Dean, NRR A. Mendiola, NRR D. Pickett, NRR S. Bloom, NRR J. Dyer, RIII J. Caldwell, RIII G. Grant, RIII S. Reynolds, RIII C. Lipa, RIII D. Hills, RIII L. Collins, RIII D. Simpkins, RIII J. Jacobson, RIII S. Burgess, RIII R. Lickus, RIII S. Thomas, RIII M. Holmberg, RIII J. Collins, RIII DB0350 DOCUMENT NAME: G:\Davis-Besse 0350\internalmtgminutes0917.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII NAME DPassehl /RA/ / by DP Acting for/CLipa JGrobe /RA/

DATE 10/16/02 10/16/02 10/16/02 OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Oversight Panel Meeting Davis-Besse Nuclear Power Station DATE: September 17, 2002 TIME: 10:00 a.m. Central ATTENDEES:

J. Grobe C. Lipa B. Dean D. Simpkins M. Holmberg S. Thomas J. Jacobson T. Mendiola B. Jorgensen M. Farber K. Gladden J. Hopkins L. Collins J. Collins Agenda Items:

1. Reports from Staff Status of TI 2515/145 and IP 7111.08 (M. Holmberg)

Portions of the ISI were still outstanding. Ken OBriens group was tasked to complete work. PIR part not complete. Suggestion was made to review the adequacy of pressure testing and VT-2 inspection requirements, unless this item was covered under the AIT follow-up report.

VT-2 inspections have seen Boric Acid below the insulation that would interfere with leakage detection.

NRR review of TSP allegation RAI and calculation concerns complete.

Site Activities (RIO)

The licensee will start welding the containment shield liner back into place as early as Tuesday evening through Wednesday. RT is expected to being next Monday.

Polar crane is still inoperable. During testing, travel limits were found not set. Licensee conducted an evaluation of repair work, finding the work poor and is reworking repair efforts. Question posed by panel, did they cut corners? Question to be raised at public meeting.

Licensee declared containment sump inoperable. The licensee identified four issues.

First, the sump screen was designed to not pass greater than 1/4 inch materials, but they sized square mesh with 1/4 inch sides so the diagonals on the screens are greater than 1/4 inch. Also, the licensee identified a gap in the screen that is approximately 3/4 by 6 inches. In addition, the licensee identified repairs made to the screens over the years where screen materials were attached with wire wraps around the structural elements of the sump. The licensee questions whether these wire wraps could

withstand DBA differential pressure loads resulting in further screen gaps/holes. Finally, they have identified unqualified coatings on the core flood tanks and pealing coatings on the reactor pressure vessel and containment dome.

During a design review of Service Water, the licensee identified that the service water piping connections to the containment air coolers (CACs) were not properly analyzed; they assumed that the connections from the service water to the heat exchangers were modeled as flexible when in fact they are very rigid. Current calculations by the licensee indicate that the nozzle connections would be over stressed by as much as a factor of two. This is due to the relative thermal expansion of the piping during accident conditions. Seismic loading has not been fully factored into the calculations as of now.

As a result, the licensee has generated a CR and eventually an LER that indicates that the CACs may not have been operable during past operation, and also may not have been functional.

Review of Action Items (panel)

The Action Items list was reviewed and updated. During the meeting, three new action items were generated.

Action Item 103: Memo to be drafted for communication of response plan to numerous emails from Blanch and Lochbaum. Effort to ensure clear, effective and standardized replies to questions. Tasked to Bill Dean.

Action Item 104: Meeting to be set up for a full briefing of the Communications Team.

Action Item 105: Call Lochbaum to determine who will be on distribution of public communications released by Communications Team.

Licensing Issues/ Actions (DLPM) - status sheet The status of the green and yellow ticket items was discussed. The panel agreed to go ahead with requests for extension of reply to hot particles ticket to October 31 and extension on follow up on USAR Lochbaum ticket. The reply to the letter from Skinner was with John Craig and was due on Wednesday. Gurdziels fifth letter to be answered with a general thank you for bringing issues to the NRCs attention.

Discussion was held on methods to effectively reply to the approximately 100 e-mails from Blanch and Lochbaum. Decision was presented as action item 103.

Communications Plan (panel)

Meeting to be established to discuss the function of the Communications Team. Of concern, control on how items are issued. This item now listed as action item 104.

2. IMC 0350 Panel Business Inspection Schedule

Licensee program compliance inspection plan discussed. Plan incorporates two phases, discovery (condition reports) and implementation (corrective action program).

Licensees status is near completion of discovery phase with a report in draft form being reviewed by licensee management. No plans yet have begun for commencement of the implementation phase, which places the licensee behind schedule in this area.

System Health Inspection to start week of September 23. Discussion was held on status of licensees inspection of the service water system not being complete and its effects on the System Health Inspection. Decision was reached to ensure that the licensee report on the service water system was in draft form and considered well done before commencing work in that area.

Process Plan Revision to the process plan was discussed with updates to use highlight and strikeout method for full review. Initial 0350 charter and process plan were attached to Jim Dyer in a memo. Revision would therefore require reissue.

Restart Checklist Items were discussed for actions to determine if they should be added to Restart Checklist. The containment sump issue of inoperabilitys potential for risk significance needs to be identified. Lead on this issue is Sonia Burgess. It is not clearly identified where the licensee discusses inaccurate records in either the Root Cause or Corrective Action Program. Specific corrective actions will not be identified until after the AIT Follow-up Report is issued.

The panel determined that a future restart item may be added, based on the final OI report.

Licensee Return to Service Plan Plan expected to be placed on the docket soon. Any future updates will then also be placed on the docket.

3. NRC/Licensee Weekly Calls No weekly call this week due to three public meetings with licensee.
4. Utilization of the Web Page No new items discussed.
5. Future Activities/Plans/Meetings Six-week look ahead schedule No new items were discussed.

Next Panel Meetings: Thursday, September 19

No new items were discussed.

6. Discuss how to handle public or staff comments, questions, allegations, and concerns received by phone, fax, letter, email, or at public meetings.

No new issues were discussed.

IMC 0350 Panel Action Items Item Action Item (Date Assigned to Comments Number generated) 1 Review the need for a full core S. Thomas Complete. Email to DB0350 5/23 offload (May 21) 2 Develop slides for 0350 portion C. Lipa Complete of ACRS meeting (May 21) 3 Invite Casto/Bateman to panel to B. Dean Complete 5/23 See internal meeting discuss review of root cause minutes (May 21) 4 Develop operational history C. Lipa Due 6/18. Additional action added 6/18 -

package for Davis-Besse (May T. Mendiola B. Dean to ask L. Portner for OCA

21) B. Dean correspondence with Kaptur. Complete with one exception - NRR to provide basic licensing information DONE 7/23. Need to capture PPR history from late 1990s.

Completed and sent out 7/30 5 Followup with State of Ohio after R. Lickus Complete 5/23 See internal meeting May 23 meeting w/licensee (May minutes 21) 6 Review AIT procedure to see if it C. Lipa Complete 5/23 should be used for AIT followup (May 21) 7 Communicate with the licensee M. Johnson, T. Complete 5/23 See internal meeting regarding the need for updated Mendiola, D. minutes risk assessment (May 21) Pickett 8 Setup location for June 12 0350 S. Thomas Complete 5/23 See internal meeting meeting (May 21) minutes 9 Provide draft restart checklist to C. Lipa Will bring back draft checklist for June 18 the panel (May 16) meeting. 6/18 - will bring back on 6/20.

6/25 - Christine is working on marked up version. 7/2 - Still working bring back 7/11.

7/16 Discussed - still finalizing. 7/18 Discussed - will email draft to Dyer for review. He has reviewed. Dean to share with NRR and DRP to prepare letter to licensee. Discuss draft on 7/30 - Grobe to discuss with licensee per 0350. 8/6 -

Discussed 8/13 S. Collins and J. Johnson have reviewed - ready for concurrence copy. 8/22 - Complete 10 Send second RAI to licensee T. Mendiola NRR to have call by 6/18. Draft responses (May 16) already received. 6/18 - call has not been held. 6/20 - hope to have call today. 6/25 -

Issued RAI, licensee will respond by 7/12, preliminary responses look to be adequate. 6/27 -Complete

Item Action Item (Date Assigned to Comments Number generated) 11 Decide if umbrella charter J. Grobe Complete 5/23 should go on the web page (May 16) 12 Prepare information request for T. Mendiola Complete LLTF (May 23) C. Lipa 13 Send licensee building block S. Thomas Complete plans (3) to Lipa, Pickett (May 23) 14 Issue Meeting Notice for 6/12 C. Lipa Complete - on website meeting (May 23) 15 Discuss expectations for 6/12 C. Lipa Complete. J. Grobe to discuss again meeting with licensee J. Jacobson w/licensee 6/11 (May 23) J. Grobe 16 Read licensee return to service Panel Complete plan in preparation for 6/12 meeting 17 Develop 6 week look ahead C. Lipa Complete.

schedule 18 Slide on Checklist to discuss J. Grobe Closed not completed.

with licensee 19 Send 3 plans to HQ C. Lipa Complete - all 6 plans sent to RIII and NRR 20 Obtain history of Byron, J. Jacobson Complete. All performed ILRT Braidwood, Palisades, and Pt.

Beach containment mods and leak test requirements 21 Set up next meeting/bridge line L. Collins Complete for 6/12 22 Confirm that transcriber will be C. Lipa Complete ready at 3:00 PM 23 Request licensee to provide S. Thomas Complete speaker phone for internal meeting 6/12

Item Action Item (Date Assigned to Comments Number generated) 24a Discuss making information Panel Discuss by June 30, after safety related to HQ/licensee calls significance assessment complete. 6/27 -

publicly available Invite Bateman to panel mtg. To discuss what else is needed to closeout the CAL (i.e. quarantine plan). 7/2 - NRR not yet ready to discuss. 7/16 - See if procedures have changed on CAL closeout - does JD need to send letter? 7/18 - Discussed - is there an applicable regional procedure?

8/6 - Discussed. Need to determine the final approach on the core removed from the head and the final approach on the head before the quarantine can be lifted.

8/22 - Revisit action item after letter sent to licensee confirming plans with old vessel head (head may be onsite longer than originally anticipated) 8/29 - Memo to be sent to Region, with a letter to go out next week.

24b Discuss making information Panel 6/27 - Complete. Publicly available info related to the Congressional contained in the request will remain request publicly available (6/27) publicly available. Non-public information will remain non-public.

25 Determine containment testing T. Mendiola 6/18 update - Provide licensees regulatory required (PSB) path to Tech staff. 6/25 - Tech staff determined ILRT required unless relief is requested. 6/27 - phone call scheduled with licensee today, letter from PM to follow. 7/9 - Need letter to file that is publicly available and letter from licensee.

7/16 -Expect letter by 8/2. 8/6 - Discussed

- Sands to determine if letter received.

8/13 - Letter from licensee received. Item closed.

26 Provide licensee with inspection Panel 7/16 - pending 7/18 - J. Jacobson working schedule - will follow issuance of restart checklist.

Est due date 8/2 to include scheduled and TBD inspections. 8/22 - System health dates now set - will likely send out schedule next week. 8/27 - Discussed -

on track to send out next week. 8/29 -

discussed, on track.

27 Brief J. Dyer on Kaptur visit, J. Grobe Briefing on Kaptur visit and June 12 June 12 meetings, risk analysis C. Lipa meetings held. Kaptur visit canceled.

S. Burgess Risk briefing planned for 6/20. Complete 28 Request S. Long to participate in Panel Complete 6/20 internal call.

29 Interface with K. Riemer J. Grobe 6/25 - Discussed with Ken. DRS will regarding perform a transportation BI approx. 3rd inspection/assessment of week in August. 6/27 - Complete licensees head disposal plan

Item Action Item (Date Assigned to Comments Number generated) 30 Request copy of current version T. Mendiola 6/20 - Chairmans office sent to J. Grobe of Kaptur/Markey letter from the to review changes.. 6/25 - Closed, letter Chairmans office yet to be issued.

31 Provide proper storage for C. Lipa 6/25 - Sensitive info may not be sent to Tauzin/Gillmor documents at RIO. 6/27 - Sensitive info will not be sent RIO to RIO. Complete 32 Determine with EDOs office if T. Mendiola 6/20 - no input yet from EDOs office.

6/12 UCS letter should be a 6/25 - Grobe spoke with Rosenberg, will green ticket (6/18) pursue green ticket with due date of 7/12.

Associated FSAR letter is due out 7/7.

6/27 - no date yet from EDOs office. 7/2 -

Green ticket due to EDOs office 7/24.

7/16 - Complete. Tracked on T. Mendiolas correspondence list.

33 Discuss with NRR staff who will B. Dean 6/20 - Update received from B. Bateman coordinate the review of on plan for NRR review. 6/25 - see panel documentation for the licensees meeting minutes for update. 6/27 -

head replacement plan (6/18) Complete 34 Discuss with licensee regulatory S. Thomas 6/20 - Issue discussed. Licensee can assurance manager about participate. Panel proposed Wednesdays having a weekly 0350 status call at noon (central). 6/25 - first call will be set (6/18) up for 7/3. 6/27 - first call will be set up for 7/10. 7/2 - Complete 35 Review Web page design for S. Bloom 6/25 - Bloom discussed with OCIO, no ease of use (6/20) changes recommended at this time.

Complete 36 Discuss proposed date of next S. Thomas 6/25 - 7/16 is good. S. Thomas left 0350 panel meeting with message with Stucker. B. Dean and J.

licensee (7/16). If acceptable, Grobe need to determine who will chair the contact Oak Harbor HS (6/20) evening meeting. 7/9 Complete.

37 Attend 7/8 meeting in Columbus, C. Lipa 7/9 - Complete.

OH (6/20) 38 Discuss making internal panel Panel 6/25 - will determine by 7/11. 7/16 - Close.

meeting minutes public (6/20) Panel decision to make minutes public after a restart decision is made.

39 Discuss strategy on risk T. Mendiola 6/25 - Complete assessment with HQ senior managers (6/20) 40 Present results of preliminary S. Long Planned for 7/2 panel meeting. 6/27 - will risk assessment to the panel delay to 7/11 mtg. 7/16 - discussed S.

(6/20) Long to return for 7/25 meeting with written materials. 7/18 - Discussed - need Steve, Sonia, Mike to attend 7/25 panel and discuss what is left to be done and the level of effort required. Grobe to attend meeting in NRR 8/14 to disc w/ LT. 8/6 -

Close to item 60.

Item Action Item (Date Assigned to Comments Number generated) 41 Discuss with M. Kotzalas and M. T. Mendiola 6.25 - Complete Landau the development of a communication plan (6/20) 42 Call the licensee to determine if D. Pickett 6/27 - Complete. Licensee is on schedule.

the letter on how the code will be applied to verify the N stamp is on schedule (6/25) 43 Add to the agenda for 7/2 - C. Lipa 6/27 - Add to agenda for 7/9 or 7/11. 7/9 revisit head replacement Discussed NRR proposal. 7/16 - Put on inspection plan (6/25) next Tuesdays agenda.

44 Update communications plan Panel Due 7/26. 6/27 - need to hold (6/25) brainstorming session. 7/16 - Add Laura Gerke and Mindy Landau for brainstorming this week. Comm plan draft update by end of next week. 7/18 - Brainstorming session held during panel meeting and assignments generated - drafts due 7/23.

Grobe will work on 8/5-6. 8/6 -Meeting held 8/6 and Jan Strasma is revising. Plan to be operational in 2 weeks. 8/13 - Plan updated and sent out for comment. 8/22 B. Jorgenson working on comm plan - will coordinate with Tony. 8/27 - Revision 0 issued for comment. 8/29 - Discussed, will get to J. Grobe next week. Issued 9/6 45 Send letter to licensee outlining D. Pickett 7/9 - Closed to item 25. Memo to file will the staffs position on be generated that is publicly available.

containment testing (6/25) 46 Revise Charter to reflect current C. Lipa 6/27 - Revised charter is in typing. 7/9-composition of the charter (6/25) Charter revised. Complete 47 Develop integrated list of D. Pickett 6/27 - Complete licensing actions associated with restart (6/25) 48 Request briefing for panel on C.Lipa 7/2 - Complete. Briefing scheduled for status of allegations in mid-July 7/11 panel meeting.

(6/25) 49 Update six-week look ahead and C. Lipa 7/9 - Complete. This is now a regular maintain weekly updates (6/25) agenda item.

50 Call L. Myers to discuss the J. Grobe 7/2 - Complete.

licensees plan for the C. Lipa Management and Human Performance Excellence Building Block (6/27) 51 Send email to M. Weston C. Lipa 7/9 - email sent and response received.

regarding agendas for future No dates or agenda set yet. Complete.

ACRS meetings (6/27)

Item Action Item (Date Assigned to Comments Number generated) 52 Discuss with B. Bateman the T. Mendiola 7/9 - Closed. Licensee to submit need for a relief request for the D. Pickett appropriate relief requests.

Midland head regarding no RT for lifting lug area (6/27) 53 Email information to B. Bateman J. Jacobson 7/9 - Closed. Licensee to submit about lifting lug area of the appropriate relief requests.

Midland head (6/27) 54a Review TSP amendment and D. Pickett 7/9 - Discussed. Will wait for response advise the panel on the need for from licensee. 7/16 - Discussed - added a TIA on Davis-Besse (7/2) action item 54b. 8/6 - Sent to the licensee on7/22 and a response is due by 8/22.

8/22 - Discussed - need to check if response has been received. 8/27 -

Received response - DRS is reviewing -

will fax to NRR for 54b. 8/29 - Discussed, DRS report of response to be issued to panel prior to item 54b.

54b Initiate correspondence w/NRR T. Mendiola 7/18 - Memo will be sent to Hannons to evaluate generic implications group. 8/6 - Discussed - not yet issued.

(7/16) 8/13 - Discussed - need info from 54a first.

55 RIII enter TSP issues recent EICS/DRS 7/9 - Complete.

letter into AMS (7/2) 56 Review 6/12 meeting transcript D. Pickett 7/9 - Complete.

(7/2) 57 Obtain documents to support D. Pickett 7/16 - Discussed. Need code vessel head replacement reconciliation package,Section III QA inspection. (7/9) index,Section XI QA index. Est completion 8/2. 8/6 - Discussed - Sands to check if documents have been received. 8/13 -

Information has been received. Item closed.

58 Discuss with J. Strasma C. Lipa 7/16 - Closed contacting interested Not Completed stakeholders about 7/16 meetings (7/9) 59 Respond to 7/3 UCS letter (7/9) Panel 7/18 - Closed. Will track on T. Mendiolas list.

60 Hold meeting to discuss effort Panel 7/18 - Discussed. Meeting will be held needed to assess risk (7/11) after 7/25 risk briefing. Sched for 8/14 w/IIPB/DIPM/DSSA and RIII 2EDT/1CDT.

Jack-Steve Long update dift cases. 8/22 -

Meeting held - item closed.

61 Invite Steve Long for meeting on Panel 7/16 - Closed to 40.

7/25 (7/11) 62 Brief new allegations or status of EICS/ DRP/ 7/16 - Put on Agenda one time per week.

significant allegations one time DRS Closed.

per week (7/11)

Item Action Item (Date Assigned to Comments Number generated) 63 Risk briefing notes for panel Steve Long 7/16 - Closed to 40.

(7/11) 64a Discuss with NRR/OGC to Mendiola 8/6 - Discussed. 8/22 - Discussed -

determine which process for normal process to be used. Item closed.

licensee request - 50.55a?.

(7/25) 64b. Discuss with licensee and NRR Mendiola 8/20 - Discussed NRR talking with the to ensure common licensee. 8/22 - Item closed. The six understanding of which relief licensing action that are required are all on requests/amendments are the restart checklist.

required for restart.(7/30) 65 Respond to questions on nozzle Jacobson due 8/16 - AITS. 8/22 - Discussed - need leaks (7/30) to check status of AITS. 8/27 - Complete -

sent info to OI on 8/22.

66 Followup w/ Ohio CAC on their Lipa/Lickus 8/6 - Discussed - will complete this week concerns (7/30) Roland called 8/8.

67 Determine risk approach and RIII 8/6 - Discussed. Mtg with Dyer on 8/7 whether revision is needed to Closed 8/8.

TIA (7/30) 68 Set up bridge/meeting room for Lipa Closed 8/8.

8/14 risk discussion(7/30) 69 Determine visual aids for 8/20 Vika/Margie 8/13 - Discussed. 8/22 - Discussed - any public meeting (7/30) feedback on visual aids? 8/27 - Discussed

- no feedback received yet. 8/29 - Closed 70 Discuss interface with LLTF Grobe 8/6 Complete. Grobe to bring back issues (7/30) to review and disposition under action item 72.

71 Discuss review and Sands 8/6 - Invite to 8/13 mtg. 8/13 - Discussed.

documentation of the Technical Dean S. Coffin to provide feeder to Lipa Root Cause and determine if the Panel regarding conclusions due 8/30 draft. 8/22 action is in NRRs work Lipa - Discussed - NRR will email draft for management system. (8/6) review/ need to determine how final input should be sent from NRR to RIII. 8/27 -

Discussed draft input and process for formal transmittal from NRR to RIII. 8/29 -

Deferred to 9/5 meeting.

72 Review LLTF observations and Lipa/Collins 8/13 - Discussed. Items reviewed for determine appropriate closeout. allegations. No new allegations identified.

(8/6) Review for safety issue/ Info related to ongoing investigations will AMS/OI/new items. be forwarded to OI. 8/22 - Discussed -

need to keep this item open as a reminder to consider outstanding LLTF items. 8/29 -

Discussed - leave open.

73 Send feedback form on IMC Lipa 8/6 - Generate feedback after panel 0350 procedure to IIPB (8/6) Mendiola meetings reduced to once per week. 8/29

- Discussed - no change.

Item Action Item (Date Assigned to Comments Number generated) 74 Matrix strategy for UCS and Lipa 8/13 - Discussed. 8/22 - Discussed -

other requests. (8/8) matrix is being developed will send out for review when ready. 8/29 - Discussed -

matrix has been started.

75 LLTF equipment issue do we Lipa 8/13 - Complete. CL discussed with Art have them all. (8/8) Howell.

76 Ctmt access - security Lipa/Belanger 8/13 - Discussed - writeup requested.

adequately reviewed. Request 8/22 - Input received from DRS on 8.19.

write up from Creed, etc. (8/8) Item closed 77 Determine attendance @ Grobe 8/13 - Discussed - will not attend panel licensees R.O.P. (8/8) meeting this time. 8/22 - Discussed - will attend future meetings. Item closed.

78 Weekly newsletters (8/8) Lipa 8/22 - Discussed - Bruce has the lead.

Daily updates will also continue. 8/27 -

First 0350 weekly newsletter is planned for distribution on Thurs. 8/29 - Discussed -

1st letter to be published today. First letter published 8/30 79 Monthly status Vika 8/13 - Discussed - working to have first Newsletters (8/8) Panel newsletter available at 8/20 meeting. 8/22

- Discussed - need to check with Vika.

8/27 - Draft of first Sept. newsletter will be available next week. First newsletter issued 9/16 and made available at public meetings 9/17 & 9/18 80 Start internal web page (8/8) Lipa - Margie 8/13 - To be discussed. 8/22 - Discussed.

Effort on hold - benefit vs. resource burden 9/3 - Closed 81 Check transcriber cost versus Wendoll - 8/13 - Complete. Checked other other suppliers (8/8) check transcription services - cost is reasonable.

82 Circle back with LLTF to put Grobe their observations into context (8/8) 83 Verify results of ongoing Panel research related to the technical Coffin root cause evaluation has not changed NRC/DE conclusions (8/13) 84 Update website with appropriate Hopkins 8/22 - complete meeting information for 8/15 meeting. John discuss with Sally (8/13) 85 Send letter/action plan to the Dean (DE) 8/22 - Discussed - NRR will send draft to licensee regarding actions Hopkins RIII by 8/30. 8/27 - Discussed - letter required to be completed to being drafted and should be ready next close CAL item related to week.

quarantine (8/20)

Item Action Item (Date Assigned to Comments Number generated) 86 Follow up with State of Ohio Lickus 8/22 - Discussed - need to check with Inspector (8/20) Roland. 8/29 - Discussed - Roland needs clarification. Item closed.

87 Determine if State of Ohio Lickus 8/22 - Discussed - No precedent for participation with 0350 panel has outside NRC to be on 0350 panel. Item been discussed (8/20) closed.

88 Develop draft proposal on how Burgess 8/27 - Working to a due date of 8/30 to to assess significance/respond present to the panel next week.

to TIA (8/20) 89 Provide report input on R. McIntyre Will be feeder to Mels need for 9/17 public Framatome inspection of M. Holmberg mtg. 9/17 - Plan to send this week to Mel.

records for the new vessel head (8/27) 90 Response to feedback form from J. Strasma 8/20 Public Meeting (8/29) 91 Call McClosky to discuss Lipa 9/17 - Called - need to check back.

docketing Return to Service Plans (9/3) 92 Call with Dean 9/17 complete Norkin/Dean/Wright/Cocoran (9/3) 93 Determine plans for docketing Lipa 9/17 complete inspection plans (9/3) 94 Get with Ramin on coordinating Jorgensen 9/12 - P. Norry concurrence not required.

issuance of Comm. Plan (9/3) Closed 95 Interpret CAL & TS and define Lipa which mode change needs Thomas approved (9/5) 96 Ongoing phase 3 observations Lipa of management and human performance following restart (9/5) 97 Bulletins 2002-01 and 2002-02 NRR response and acceptance (9/5) 98 Poll staff for differing opinions Panel (9/5) 99 Bring to panel all 95002/95003 Jacobson/Lipa attributes (9/5) 100 Attach approved plans to panel Jacobson/ 9/17 - Closed.

internal minutes (9/5) Gladden 101 Get 2 names for the SSDI (9/5) Lipa 9/17 Closed. Reese & Ellegood

Item Action Item (Date Assigned to Comments Number generated)

NRR Approval of Concern 3 for Licensee Investigation Report 102 Mendiola for Allegation No. RIII-02-A-0110 (9/12)

Issue 3 memos to staff - forward 103 emails to DB0350/RES/NRR/RIII Dean/Grobe (9/17)

Add UCS to service lists in RIII 104 Lipa/Mendiola and NRR (9/17)

Call Lochbaum and ask if adding 105 Macon him suffices (9/17)

Risk-significance on containment sump past 106 S. Burgess operability - consider for checklist (9/17)

When AIT F/U IR is issued, 107 consider item on records Panel accuracy (9/17)

Resolution of OI issues, 108 consider adding to restart Panel checklist (9/17)