MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19323F8262019-11-20020 November 2019 NEIMA Meeting Summary ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 2024-06-21
[Table view] |
Text
October 1, 2002 Progress Energy ATTN: Mr. C. S. Hinnant Senior Vice President Nuclear Generation/CNO P.O. Box 1551 Raleigh, NC 27602
SUBJECT:
CLOSED MEETING
SUMMARY
- SECURITY ISSUES BRUNSWICK - DOCKET NOS. 50-325, 50-324; CRYSTAL RIVER - DOCKET NO. 50-302; SHEARON HARRIS - DOCKET NO. 50-400; H. B. ROBINSON -
DOCKET NO. 50-261
Dear Mr. Hinnant:
This refers to the closed Security Technical/Management meeting that was conducted at the Region II Office of the Nuclear Regulatory Commission on August 26, 2002, at the request of Progress Energy, to discuss changes in security as a result of the NRC Orders issued on February 25, 2002. A list of meeting attendees is enclosed. The specifics of the site security information discussed at the meeting is considered sensitive and/or safeguards information, therefore, a copy of the presentation materials are not enclosed.
It is our opinion that this meeting was beneficial, in that members of the Region II security staff were informed of Progress Energys security organizational structure and recent security changes implemented at the Carolina Power and Light Company and Florida Power Corporation Nuclear Plants.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at 404-562-4653.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-325, 50-324, 50-302, 50-400, 50-261 License Nos. DPR-71, DPR-62, DPR-72 , NPF-63, DPR-23
Enclosure:
List of Attendees
Progress Energy 2 cc w/encl:
Mr. J. S. Keenan Beverly Hall, Acting Director Vice President Division of Radiation Protection Brunswick Steam Electric Plant N. C. Department of Environment P. O. Box 10429 and Natural Resources Southport, NC 28461 Electronic Mail Distribution C. J. Gannon, Director Peggy Force Site Operations Assistant Attorney General Brunswick Steam Electric Plant State of North Carolina Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Robert P. Gruber W. C. Noll Executive Director Plant Manager Public Staff NCUC Brunswick Steam Electric Plant 4326 Mail Service Center Carolina Power & Light Company Raleigh, NC 27699-4326 Electronic Mail Distribution Public Service Commission Terry C. Morton, Manager State of South Carolina Performance Evaluation and P. O. Box 11649 Regulatory Affairs CPB 7 Columbia, SC 29211 Carolina Power & Light Company Electronic Mail Distribution Donald E. Warren Brunswick County Board of Edward T. ONeil, Manager Commissioners Regulatory Affairs P. O. Box 249 Carolina Power & Light Company Bolivia, NC 28422 Brunswick Steam Electric Plant Electronic Mail Distribution Dan E. Summers Emergency Management Coordinator Licensing Supervisor New Hanover County Department of Carolina Power & Light Company Emergency Management Electronic Mail Distribution P. O. Box 1525 Wilmington, NC 28402 William D. Johnson Vice President & Corporate Secretary Dale E. Young, Vice President Carolina Power & Light Company Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution Supervisor, Licensing &
Regulatory Programs John H. ONeill, Jr. 15760 West Power Line Street Shaw, Pittman, Potts & Trowbridge Crystal River, FL 34428-6708 2300 N. Street, NW Washington, DC 20037-1128
Progress Energy 3 cc w/encl:
Daniel L. Roderick James Scarola Director Site Operations Carolina Power & Light Company Crystal River Nuclear Plant (NA2C) Vice President - Harris Plant Electronic Mail Distribution Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 Jon A. Franke New Hill, NC 27562-0165 Plant General Manager Crystal River Nuclear Plant (NA2C) Robert J. Duncan II Electronic Mail Distribution Director of Site Operations Carolina Power & Light Company Richard L. Warden Shearon Harris Nuclear Power Plant Manager Nuclear Assessment Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Benjamin C. Waldrep Plant General Manager--Harris Plant R. Alexander Glenn Carolina Power & Light Company Associate General Counsel (MAC - BT15A) Shearon Harris Nuclear Power Plant Florida Power Corporation Electronic Mail Distribution Electronic Mail Distribution James W. Holt, Manager Attorney General Support Services Department of Legal Affairs Carolina Power & Light Company The Capitol Shearon Harris Nuclear Power Plant Tallahassee, FL 32304 Electronic Mail Distribution William A. Passetti John R. Caves, Supervisor Bureau of Radiation Control Licensing/Regulatory Programs Department of Health Carolina Power & Light Company Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Chairman of the North Carolina Department of Community Affairs Utilities Commission Electronic Mail Distribution P. O. Box 29510 Raleigh, NC 27626-0510 Chairman Board of County Commissioners Linda Coleman, Chairman Citrus County Board of County Commissioners 110 N. Apopka Avenue of Wake County Inverness, FL 36250 P. O. Box 550 Raleigh, NC 27602 Michael A. Schoppman Framatome Technologies Electronic Mail Distribution Gary Phillips, Chairman
Progress Energy 4 cc w/encl:
Board of County Commissioners S. C. Department of Health and of Chatham County Environmental Control Electronic Mail Distribution Electronic Mail Distribution Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550 C. L. Burton Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution C. T. Burton, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution B. L. Fletcher III, Manager Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
Progress Energy 5 cc w/encl:
Distribution w/encl:
R. Subbaratnam, NRR J. Goshen, NRR A. Hansen, NRR RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII RII RII SIGNATURE NAME KDavis BBonser LWert ABoland DATE 10/01/02 10/01/02 10/01/02 10/01/02 10/ /2002 10/ /2002 10/ /2002 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML022800092.wpd
AUGUST 26, 2002, CLOSED MEETING PROGRESS ENERGY LIST OF ATTENDEES Nuclear Regulatory Commission H. Christensen, Deputy Division Director, Division of Reactor Safety (DRS)
A. Boland, Plant Support Branch Chief, DRS D. Forbes, Physical Security Inspector, DRS J. Ennis, Physical Security Inspector, DRS K. Davis, Physical Security Inspector, DRS Progress Energy E. Martin, Manager Nuclear Security L. Hayes, Senior Regulatory Affairs Enclosure