ML023520156

From kanterella
Revision as of 15:31, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station
ML023520156
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/06/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023520156 (5)


Text

Stephen A. Byrne Senior Vice President,Nuclear Operations 803 345.4622 A SCANA COMPANY December 6, 2002

/

Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c: G. H. Halnon Paulette Ledbetter T. G. Eppink (w/o Attachment) INPO Records Center R. J. White J&H Marsh & McLennan L. A. Reyes William G. Wendland (ANI)

K. R. Cotton Pat Haught (Westinghouse)

T. D. Gatlin RTS (0-L-99-0350-1)

NRC Resident Inspector File (818.03-1, RR 4100)

K. M. Sutton DMS (RC-02-0205)

SCE&G I Virgil C.Summer Nuclear Station

  • www scana (om

Director, Office of Resource Management November Monthly Operating Report RC-02-0205 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 3, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 November 2002 AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL DAY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 977 17 980 2 977 18 978 3 977 19 978 4 976 20 978 5 978 21 979 6 976 22 978 7 977 23 978 8 978 24 979 19 25 978 978 10 978 26 979 11 978 27 977 12 978 28 977 13 978 29 978 14 "978 30 979 15 980 16 979

Director, Office of Resource Management November Monthly Operating Report RC-02-0205 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 3, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1 Reporting Period: November 2002 Gross Hours in Reporting Period: 720 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 720.0 6956.0 138405.3 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 720.0 6902.0 136526.4 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2086002 19789555 368675963 10 Gross Electrical Energy (MWH) 732660 6917790 124466539 11 Net Electrical Energy Generated (MWH) 704181 6649869 118921050 12 Reactor Service Factor 100.0 86.8 83.5 13 Reactor Availability Factor 100.0 86.8 83.5 14 Unit Service Factor 100.0 86.1 82.3 15 Unit Availability Factor 100.0 86.1 82.3 16 Unit Capacity Factor (Using MDC) 101.2 85.9 79.0 17 Unit Capacity Factor (Using Design) 100.5 85.3 77.9 18 Unit Forced Outage Rate 0.0 0.6 3.2 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management November Monthly Operating Report RC-02-0205 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 3, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 November 2002 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management November Monthly Operating Report RC-02-0205 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE December 3, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 November 2002 V. C. Summer Station operated at 100% power for the entire month of November, 2002.