05000348/LER-1978-065, Forwards LER 78-065/03L-0

From kanterella
Revision as of 21:31, 22 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 78-065/03L-0
ML20064C328
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/11/1978
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064C331 List:
References
NUDOCS 7810180145
Download: ML20064C328 (1)


LER-2078-065, Forwards LER 78-065/03L-0
Event date:
Report date:
3482078065R00 - NRC Website

text

1 g ,

A:a:;a c.3 %e Cc ca7

-( e 6'C VP t t' 5~Ce*

'Js* 7te bca 254

  • b  ; a- a m a 35291 Tee; ore 2353;J.534' ,

[ .

F. L CLAYTON, JR.

S'"'*'""*" AlabamaPower the sotchem esectrc system October 11, 1978 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph !!. Farley Nuclear Plant, Unit 1, Licensee Report No. LER 78-065/03L-0 is forwarded herewith, with three (3) copies each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) day written notification of the occurrence, j If you have any question, please advise.

t Yours very truly, F. L. Clayton, Jr. F FLCJr/TNE:bhj Enclosures cc: Director, IE (30 copies) /

Director, MIPC (3 copies) g et o t& D l" ff 1 ,

i L