MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
_.
OPERATING DaIA PEPORT .
DUCUET NO. 50-266 DATE June 7, 1982 COMPLETED BY C. O. FAY TELEPHONE 414 277 2811 OPERATING STATU5
- 1. UNIT NAME: POINT BEACH NUCLEAR PLAN. UNIT 1 . NOTES .
- 2. REPORTING PERIOD: MAY 1982 .
- 3. LICENSED THERNAL POUER (duT): 1518. .
- 4. NAMEPLATE RATING (GROSS nUE): 523.8 .
- 5. DESIGN ELECTRICAL RATING INET MUE): 497. .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS hue): 519. .
- 7. NAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. . ..,.............. ......
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REFCRT, GIVE REASONS:
NOT APPLICABLE 9 POWER LEVEL TO UHICH RESTRICTED, IF ANY (NET MUE): 445.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY): Maximum dependable capacity reduced because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.
THIS MONTH YR TO DATE CUHULATIVE
- 11. HOURS IN REPURTING PERIOD 744 3.623 101,399
- 12. NunBER OF HOURS REACTOR WAS CRITICAL 744.0 3,199.1 83,552.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.4 618.7
- 14. HOURS GENERATOR ON LINE 744.0 3,168.5 81,140.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 27.4 7?1.7
- 16. GROSS THERNAL ENErsGY GENERATED (BWH) 867,029 3,970.279 111,323,119 17 GROSS ELECTRICAL ENERGY GENERATED (MuH) 290,370 1.329,550 37,350,830
- 18. NET ELECTRICAL ENERGY GENERATED (NUH) 274.695 1.242,526 35,543,737
- 19. UNIT SERVICE FACTOR 100.0 87.5 80.0
- 20. UNIT AVAILABILITf FACTOR 100.0 88.2 80.8
- 21. UNIT CAFACITY FACTOR (USING MDC NET) 74.6 70.4 71.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 74.3 70.1 70.5
- 23. UNIT FORCED OUTAGE RATE 0.0 0.4 3.0
- 24. SHUIDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND .)URATION OF EACH):
Five week refueling outage scheduled to begin November 5, 1982.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT-SHUTDOWN r, ara RFPORTFfi AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 8206160324 820610 PDR ADOCK 05000266 R ____ __
PDR
DOCKET NOo 50-266 UNIT NAME Point Beach Unit 1 DATE June 7, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811
, AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 371 11 372 21 371 2 370 12 373 22 369 3 371 13 372 23 370 4 370 14 371 24 370 i
5 371 15 371 25 370
, 6 374 16 369 26 369 i
7 370 17 369 27 370 1
4 8 374 18 369 28 368 9 362 19 370 29 _
370 10 372 2d 370 30 347 31 361 AD-28A (1-77)
, ! . li1i I ! ; ' ! ;
( A 0D 1-
- 2 N 78 o
)
8B D
SF a
t e
SF co hr ec de ud ego ~
l e
d ccga3a
=gu2 _
HGFEDCBAR
- e mogoa" a _
OOAORRMEs ~
tp dp e e a q o gujo c W U _
h m eg fiu n R N .
e r ir u u n i: majnBt E I ranaletp .
8g goRou nm P T -
titalem t O -
( isotine R S eotronan T H _
xnr rgnt L U _
paaTy c i M T .
lltr eF c O D a iaR a Re N O iEvie oi en T W -
nrans rl ps H N .
) r it u oe S o nr Tr ee re _
r gi t A c s E N
( &t t( Nv M D e i e
.o ne a -
p x Lo x p y P in t O -
l c l W
a e a 1 E i n i 9 R n s n mgvV 8
) e )
go'o 2 R .
E -
E D x U a C m gEgaia T I
o g'o n O 3 N -
S 4321M e .
t C OAMMh a tuaao Tu htnnd os -
eouu: e rmaa P all ra C
( t en TO eiS vd EM D p
xcc e LP UO -
r nC EL NC lSa to PE IK -
acm ir Rr r HT OE TE T
na ee ND N
) m cc E AN ut MO 5 ri Y E.
SE ( Sate rv ee 4 P 5 ox Nhtix n 1 o 0 uh U e io h cA 4 i -
ri Reoni ec / 4 n 2 cb Etnsb t 2 t 6 ai Gs i i, 7 6 t - oft o 7 F B 0ffo n - a e I 1o rG 2 a
_ - 6rD - 8 c 1 API 1 h S ) Ltrn 1 a Eaes U .
m R pt n e Ear i Fnru t it c lr - 1 ey
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date June 7, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at an average of 370 MWe from May 1 to the end of the reporting period with no load reductions.
No safety-related maintenance was completed in conjunction with the operation of Unit 1.
f 1
I i
i I
w
I OFERATING DAiA F2FORf DOCVET NO. 50-301 DATE June 7, 1982 COMPLETED BY C. U. FAY TELEPHONE 414 277 2811 CFERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
- 2. REPORTING PERIOD: MAY 1982 .
- 3. LICENSED THERMAL POWER (nUI): 1518. .
- 4. NAMEPLA1E NATING (GROSS MUE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 6. MAXIMUM LEPENDABLE CAPACITY (GROS 5 nWE): 519.
- 7. MAXIhuM DEPENDABLE CAPACITY (NET MUE): 495. .. . . . . . . . . ..............
- 8. IF CHANGES OCCUR IN CAPACITY RATINb5 (ITEnS WUMBER 3 IHROUGH 7) SINCE LAST REFORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO UHICH RESTRICTED, IF AHi (NET MUE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANf): NOT APPLICABLE THIS n0 NTH YR TO DATE CUMULATIVE 744 3.623 86,184
- 11. HOURS IN REPORTING PERIOD 163.2 2,688.9 77,079.3
- 12. NUnBER OF HOURS REACTOR UAS CRITICAL 0.0 0.0 193.0
- 13. REACTOR RESERVE SHUIDDLN HOURS 121.0 2.643.6 75,702.2
- 14. HOURS GENERATOR ON LINE 0.0 0.0 178.0
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENEPGY GENERATED (MWH) 124,874 3,856,642 104,113,486 42,070 1,295,610 35,318,620
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (huh) 37,094 1,235,414 33,618,880 16.3 73.0 87.8
- 19. UNIT SERVICE FACTOR 16.3 73.0 88.0
- 20. UNIT AVAILABILITY FACTOR 10.1 62.9 79.4
- 21. UNIT CAPACITY FACTOR (USING MUC NET) 10.0 68.6 78.5
- 22. UNIT CAPsCITY FACTOR (USING DER NET) 2.8 0.1 1.6
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUIDOUNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOUN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTOPS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 ygg.
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2
- DATE June 7, 1982 COMPLETED BY C. W. Fay
) TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 -7 2 -2 12 -2 22 -9 3 -2 13 -2 23 -7 4 -2 14 -2 24 -9 5 -2 15 -2 25 -11 6 -2 16 -2 26 2 7 -2 17 -2 27 191 8 -2 18 -2 28 203 9 -2 19 -6 29 353 10 -2 20 -8 30 443~ ;
31 443 AD-28A (1-77)
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 -
UNIT NAME Point Beach Unit 2 REPORT MONTH May, 1982 COMPLETED C 1. Fa TELEPHONE 414/277-2811 u
c W tD o 4 o
32 au "co St co n m
!!"o v 'o En ao No. Date g gg g jjg Licensee Event y g'g Cause and Corrective Action e am o ve Report No. m EU To Prevent Recurrence c- m gmg g 8
4 e
1 820416 S 618.9 C 1 N/A ZZ ZZZZZ Returned to power following com-
- letion of refueling outage.
2 820527 S 0.6 B 4 N/A ZZ ZZZZZ Unit removed from service for off-line turbine testing.
3 820528 F 3.5 B 3 N/A ZZ ZZZZZ Spurious safety injection signal caused by loose terminal connection discovered while isolating 125 V DC bus ground fault.
F: Forced Reason: 3 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File j D- Regulatory Restriction 4- Other (explain) (NUREG-0161)
E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain)
D' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date June 7, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 continued in its refueling outage and maintenance work from the beginning of the month until 1857 hours0.0215 days <br />0.516 hours <br />0.00307 weeks <br />7.065885e-4 months <br /> on May 26 when the unit was returned to service.
During fuel movement on May 4, a grid strap on fuel assembly J-67 was torn and that fuel assembly was replaced with another assembly from the spent fuel pool. One~of the two pieces of the fuel assembly grid strap was found in the refueling cavity near the upender and was moved to the spent fuel pit. The other piece was located in the spent fuel pit canal and remains there.
Sludge lancing was completed on May 4 and water balances showed that 37.2 of the 41.3 and 47.8 of the 53.8 gallons of sludge were removed from "A" and "B" steam generators, respectively.
As a precautionary measure following the discovery of-foreign objects in the Ginna Plant steam generators, an annular search of the secondary side of the Point Beach Unit 2 steam generators was completed on May 10. A 14-inch piece of welding rod was detected in "A" steam generator and removed. There was no visual indication of tube distress in the vicinity of the weld rod nor was there any eddy current indication of wall thinning.
The Unit 2 "A" reactor coolant pump motor was replaced and filling and venting of the reactor coolant system was completed at 0327 hours0.00378 days <br />0.0908 hours <br />5.406746e-4 weeks <br />1.244235e-4 months <br /> on May 19.
Since returning to service on May 26, it was noted that gross generator output for Unit 2 has dropped from 518 MWe to 511 MWo. This loss in unit output is attributed to a feedwater temperature reduction caused by operating with the bypass of the No. 4 feedwater heaters in the full open position. The No. 4 feedwater heaters have approximately 26% of their tubes plugged and the heaters will be replaced during the next Unit 2 refueling outage.
Primary-to-secondary leakage for Unit 2 remained less than ten gallons per day subsequent to Unit 2's return to service.