MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
-
Wisconsin
'Electnc )
POWER COMPANY Point Beoch Nuclear Plant (920) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 99-0273 May 6,1999 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 ;
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the {
calendar month of April,1999.
Sincerely,
. [@2" b Vito A. Kaminskas Manager, )
Regulatory Services & Licensing MBK/tja Attachments //
/
cc: J. D. Loock, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 9905170197 990430 . . ,
DR ADOCK O .y 4 Asubsdrn ofKhamskExmaxpcntim
E V 0 2706207 I
1 2 3 7.9 0030 30.9 8 96 %9%
T77 A 936,0,6 624 7 7,864 0,4,7,800534 9 8 59 877 a L 40 9 4 8 8 k
l U22 1 8, 0, 5, e M 3 61 d
u 0 U 8 99 2
o 8 C
K M B 5 5
6 7 6
2-M :
)
0 0 Y 2 9
5 9 B E
. 9 D
(
- T0 95037.0 0902 3 0 099850 5.%0 % % % 9 O /
E E A7 2 0 662 N N
/ i N D 8, 7, 7, 7,3,0,39999 3 53 2 T 5 t O S O 22 2 8 8 8 7 0 l 093 E : L i P N T 0, 3, 3, 7
9 K E P E O R 41 1 1 C T M L S A ,
O A O E A E 2
2 D D C T E Y R R E E B V
I )
M G l l E T
T, 1 C P 1 08 070005 9%9%9 A R T 9208090933 E E O N1 S P O76 1
9 5
3 24 3, 1, 7 7 0.F 4, 83 83 8 28 00 D _
E M 73 8 O E R 708 N T S 832 A
T l O S i l
I T D A T A P R
L U t -
E R U T 1 C
D R 1 N A e I
S D T L S ) N S C E 7 A F R T i .
O N O l a E N G /
n T E N U : A T I O )
E D A D 0 R , D E 9
l i W E P D T S
T M E I
T 003 5
- 85 S T Y
T T A
E U
I
) E (
Q N E 4 M N S M E
):
( l U 0. W E E I
) i T R T Y )
T T
7M 9 WI ( N L A
l i
l i
W N S E
S A _
N 53 8.:4 SSMS A C W
MDM
)
TT )
O D
D A 8 2) OT G F I M E T (
E( E 'L O 5, 5EWGNI RLN 1 I L ,:
S DTD 6 T P :
T D)Y I
RR NN T I
R A EAE 1 )
R : EM( (
A L N CU RT CR X E L DE P TW T YY TT RY U
)
A I SO NEA E E CA S R RNR MD N T C -
L WMEI NCCT I
RI F I Al WN l
U EEE GG R R L C 9MS( AAI T (, O A U9(
N19 R OGPPC S
S S DRW O ENGN E NN RISSE V E P C OOOEI G Y I I AAA E E T R N G G S
R l - E RN CCP I A O R TDNN YRY I
OUUTOsR ADaFy R
O CiWG TA EE i l r (
LL C iI C T l
E CTILW P AU GEG CRRREdO T( (
O T
P A pO G R C El NORNRR AOOE L3U4D C E EAP N BBN B : LI LAAI l
l I iR GR SiODEEE O F TT G ,N A R S WT N SE R TN L N TYCC A D F A
U T DATADDR N O M AC NN U S TR V OlUE A E CTAA TE9 I 9 E D
T A RR RI R PPC I
EE C OE RU RA TiLCLAI FFL Ui6/T l N
T I TR OOE S AI AFI YYO C1 A A S REMR TI BTT D SS1 0N CE A T OPiNC EEGT EEO L
/
E R S P Pl E F EEV D l
D G EG TIT ELMM
- i DD S V O F R RNR RCRIC AI I
LCCE N g. W E E N R R EElEETVI AAC nO O T G
N N
I T
MNDA AIT EL E UU G N E
L N S I E
SiLC R APPRWiD O G ETEE E VAAOOeT l R O
I T A R
NR NEGI SPN MMA I i R Oa E / R BTSRSS S
C R T SS E L SACCFDf uUa / P TO TTTTT Tel ri n NEICEMS XXl S n E A
R E
P I P I
AE AA C WA UM AUI OOTI OUEONRRENNNNNI I I I I U S R OE A E O URLNDMMI F PR I I NRI UGGNUUUUUS l I F
I T
P . . . . . . . . . . . .
A 1 2345678. 901 2 3 4.
.0 5
O . . . . . . . _
1 . 2345678 91 I 1 1 1 1 1 1 1 1 22222 2 D _
L E
E ka 08 le 4 GYEF ALLN VT
' d 6 u RI 3 6 2 7 8 8 0 2 _
E A Re 0 4 8 9 6 2 9 o 5 5 4 1
- 1 1 1 VD EW
- - - 1 4 5 9 K .57 6
6 2
/
4
" 0/ B 0
)
A WM -_
0
. 2 O 5
5 0 M 9 (
P Y
B -
D E O
N T
E N T
E O Y
- L E P P H A D
1 2
2 2
3 2
4 2
5 2
6 2
7 2
8 2
9 2
0 3 -
l C E O
T M L A O E D D C T L
E E VT L G YEE E ALLN V RI Re 2
0 4
0 3
0 3
0 2
0 8
9 2
0 2
0 4
0 3
0 E EA VD EW 5 5 5 5 5 4 5 5 5 5 T L A WM N R O P
A E L
P W R O 9 A P 9 E 9 L T 1 C I -
Y U N L A 1 2 3 4 5 6 7 8 9 0 N U I R D 1 1 1 1 1 1 1 1 1 2 H Y P C L A A I E A H B T T D N N
I E O _
O G M A
P .
R E L E
V E VT A
G YEE ALLN 8 6 2 6 4 5 4 6 RI % %
E A Re 0 0 0 9 0 0 0 9 5 5 5 5 5 4 5 5 4 V D EW 5 .
A WM _
O -
P -
Y A I 2 3 4 5 6 7 8 9 0 1
D
1' l l! l ){!(l lIIIll l' s
.am l
v de p s te y
du ms l
c d un 1
t in d ad mow i
n e e wo a mts r l k o mb U. e 0 l
f r ad p ;mn h 8 e a
c d 4 u 5 a; e 9 o - kr h c ce t
6 B 9 K 5 o wh t
a r - nn 9 5 6 t 7 2
- i n 1
/ B. f 0 p u
t o
c 0 o 4 .
2 e i s
5 P
/
5 M 9 e
R d
r o
- e. 9 ; i.
u 9 n n
. 9 oc m I
)
y o - 1 m
- l. *6 i 6 Bo. i t w ir 6 1 AcRa n
de Ne oe p 0 Nma e ABi a G t
le n i v m ind; m ;
f osE de le wf na ph o t
keN i
s citempt w'. me g s neR t e
c onaole n
oo r n noeU oih r CT ok in ia t sN u DUDCe T d n
f re n lo t
c r y(
S o
pio oc a t r ar le upt e
e s swua m al t s re ef ni m
u a ri sn I npaR a C e g ch u a r aE o
t S
a e ce tu r G fdL 1 o p m
+. m ue it b b it p v i n
- i S r d h h N -
e x x r a do t E E O
I mwr a d me l
T e rt o
C yf a y on T U d r a c N D 9 r ui h A s A E 9
9 f o x 3 v e u
L P R 1
AAWl a v
R R L A E I n
E W R a a P e mf w )
L C O A %, 'd A m tioo1 nt d n
ou= lpa
/
P o N aS i
U H o C r D T u ccihI N N N C SiauaS t t
d ex n s e l
H unaot m ou i u c (r C A O lau A S N M m e A natuov et nid eh E T te 'd MaM ACeRO
/
r B W R s o yC N - - P - -
T O O S -
234 56 N D P : 1 I
T E d O R o P U t n ht H e v .o e S EN A '
M T
I ~ nu N
/
p N e U hR t
t f u toh x Sr )
w ft o 'n t
e ca w I
ina
)
in Me o lpg l a
RD x n n p ei o x e
( st i&
t 2 ee c ig
(
r n
o l rT u r r t n o r
s si B
R a
e io Fe a enmeEir Ra i av )na c y r xi t n agrTEa lalp t
n r n x e or gt o e
)
nnt oni s meliat pt el asi n a (r i
t n sr 3 :in uiu geur emeh n i r e io u 0 n oqafeepcd pt o
tal r f u (
D 2
1 sEMRROiAOO a - - - - - L e - - -
'RABCDE FG1 1
'ep y S T
3 te 2 a 4 0 d D 9 9
le d u ed ce b 8
rh o
FS oc 2 0 )
2 00 9 N : :
'FS F3 B 0-P(
7- . )
DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE 05/05/99 COMPLETED BY M. B. Koudelka TELEPHONE 920/755-6480 The daily power average for Unit I during April,1999, was 401.3 MWe.
The following Licensee Event Report (LER) was submitted to the NRC during April,1999:
' LER 266/1999-001-01, Safety Injection Recirculation Line to Refueling Water Storage Tank Frozen.
Safety-related maintenance included:
i l
- 1. '
l A52-86 alternate power to I A-06 from G-04 emergency diesel generator reduced voltage test performed.
- 2. IC-1 equipment access air lock O-ring lubricated.
- 3. IC-2 personnel access air lock 0-ring lubricated and linkage repaired.
- 4. RO-04008 P-38A auxiliary feedwater pump mini-recirculation orifice elbow, pipe, flow tap tube and valve replaced.
l I
l
E 01 902000.%%%%%
V T 5033 20481 I 64 828 07 4572 4 _
A 4,0,2 2,3 9,3,8,2 2 8 7 2 8 877 a L 39 4 6 3 708 k 9 82 6 le U21 1 6, 4, 9, d M 749 u
o 0
8 U 798 2
K 4 C 6-B 5 1
. 5 7 _
0 3
M .
)
0 0
Y 2 9
5 O
9 9
/
B D
(
E
- E00050005.%%%%%
T 93 01 0208 9 9.9 8 0 4
E A7 6 2 94 9 N
T 0
/
5 T E
N O S D 8,4, O 21 3,
1 8,0,3,4 52 6 55 443 40 4 7
E 0 i 962
- L l P N T 8,6 6 7 9
K E P E O R 1 1 C T M L S A ,
O A O E A E 2
2 D D C T E Y -
R R E
E B V
I )
M G l i E T
T, l C P R i00.000005.%%%%%A T E O N1990907060093 1 3 4 0 0. E S P
E O771 7 0053 0F 9,4,3,0 0 0 0 O D M 0591 1 1 1 E R 98 6 N T T S l
0,3 3 O A S l 1 I
T D _
A U P: R A
L E
C R
U D
U T
R.
t i
I N A E D T L I
S S E ) N S C T
7 A F R O
l ,
O N _
N i
G
/
a E E N U n I T
'A I O )
E D A D 0 R D E i
W E, T 9 l T P D S 2 003 M Y E E 5
- 85 S T T T U T
I
) E ( A Q N E 4 M N S M E U W E): E (
Y ) )
l i
T I
T R
- 0. M T WI I
- 7 l S S T 9 ( N L i I N E A N 8 4S SMS A A W W ) O A 53 8 2):OT G F C MDM T)T M D D
E I
E E O 5, 5 E RENT (
L 1 I T E( 6 T P :
WGN I D)Y I
RR S DTD NN T I
R A R
1 )
(
A E EAE CR E
): EM( CU X TRT L A YY R TN SO AEA DE E P U E TW WMEI T TT I Y CAF I Al l S RRNR MD N T C -
L RI U EEE GG R L C9MS(NCC S AAI T T (,
DRW WN O ENGN NN R
E O A C
T U9(
N19 R OGPPC E RN CC AAA S S E
R N OOOEI G I
Y G G E
RISSE V I P E S R l - I PA O I
TDNN YRY OUUT O AD R R O CliWGT i
r (
A EELL C I I I T R E
P EI C TILW AU NORNRR AOOE L GEG T( (
CRRRE F O
O T
P E
R S A pO G R EAP B :LINLAAI BBN CC l
l I iR GR S ODEEE O FTTG U I
N SE R TN L NTYCC A D D
N C
A -
T DATADD R WT E F U
TR V TiLCLAI OlUE A ECTAATE -
I A T N OM RI ACNN U OES T D T A I
R EEC TR RU RA FF L UI I
A N ORR OOE I
A T EEGT PPC RE1 S AI R AFI CE BTT YYO C S A S P
- EGTI PliNC EEO L E R PI E F EEVOTI I S C AI D S N D D TELMM DD S O CR LCCE I
AAC N G V F R O RNRIEET VI I W E G N MNDA E UU EG E N R R EEI SI LC R APPRW O T L N S G ETEE E VAAOOeTD R I
N T AI EL T N S E O I
I T
A A
R E
NR TOP EMIS XXI I
SPN MMAa NEGI I I / ER Oa S n/ R BCTSRSS UM R T SS E LTTTTTTnl A UI OOTI SACCFDnUa I I TTU o{
n /
O P
E R
R P O
NEICAE URLNDMMI AA C F nWA OE PR OUEONRRENNNNNI l
NRI UGGNUUUUUS I
I S
F A E I I T
P . . . . . . . . .
). 01 234.
A
.0 2345678 5 O . . . . . . . 1 1 . 2345 678 91 1 1 1 1 1 1 1 1 l' 22222 2 D
~
2 L i
t n E ka 08 E VT U l G YEE
, e 4 h
c d 6 ALLN 3 3 2 1 4 3 2 4 6 8 u -
RI a
E A Re 0 1 1 1 1 1 1 1 1 1 o 5 5 5 5 1
e 9 B 9 / K 5 7 EW VD WM 5 5 5 5 5 5 5 0 t 4 )
A 3 n 0 B. 0
- i /
0 o 5 . 2 O 5 P 0 M9 (
P Y
B O E D E NM E N 1
T A f i
O Y E N : L H A 1 2
2 2
3 2
4 2
5 2
6 2
7 2
8 2
9 2
0 3
K D C
O N A O E TE I
T PMP LE D U D C T L -
E E VT L G YEE E ALLN 0 V RI Re 4
1 4
1 1 5
1 7
1 2
1 6
1 3
1 4
1 3
1 E EA V D EW 5 5 5 5 5 5 5 5 5 5 T L WM N R A
O -
A P _
L E P W R O 9 A P 9 E 9 L T 1 C I -
Y U N L A 1 2 3 4 5 6 7 8 9 0 N U I R D 1 1 1 1 1 1 1 1 1 2 H Y P C L A A I E A H B
T D T N
N I
E O O G M P A R
E L E
V E VT A GYEF ALLN 5 4 7 6 4 5 5 3 4 3 RI Re 1 1 1 1 1 1 1 1 1 1 EA VD EW 5 5 5 5 5 5 5 5 5 5 A WM O
P Y
A 1 2 3 4 5 6 7 8 9 0 D
1
m 2
t i
n a k
U.
h le 08 d 4 c
a 9 u 6 e o -
1 B 99 K 55 0 t .
7 3 - i n / B /0 1
0 o 4 .
2 5 P 5
/
M 9 zn e )
y n o n u 1
6 c
Bo itc e 1 oe de Ne A R. 0-Nma t e n G w
m f
osE G
t o
keN .A l t ph w s neR e citemp noeU c onaol t
e CT wo oih t a sN r
u DUDCe T i
t r y( o d
n a
cupta r lr e S e
e s
t s re enf i
m u
a I npaR a r aE t S
C - o G fdL 1
t t i i b
i b
i S h h x x N E E O
I T
C T U N D 9 9
A E 9 A L
P R 1 N
R R L A E I n W R -
m af w N P
'e )
I O A d
o A mr a c ooid m i n
(
U P
H 4 iC N rSnt ccihI p ou n .l a
N D T C w Si aut t
aS d x N N n s e (e H
C A O l
au lami uc r un ot nidh ou e A S N
M m *e natuov et MaM ACeRO E T e A r B W R ts do N - - P - -
O O SyC T P : 1 234 56 N D E d I
1 R o O U t n
ht P e H w o.
S EN A '
M T
I -
t r
o N p
N e U 1 R 1
t f u oh d S )
o r A n )
ht o s, N n a
i t
e c , ia Me ag l pg lp Rp xn n ei o x e
( st i&
t (
ee c ig r 2
n rT u r t r n o e
o s
a A
N l
i ao Fe c enme si RiavEi a xi r )n r
R a y r l
t t
n agrTEa n r n alp e nnt or gt os e x
)
meiatoni pt el asi nit l
a (r n sr :inuiu ur n ir e geemeh io u A n oq af eepcd pt ta o r f u (
l N sEMRROiA OO a
e - - - - -
L D
2 RABCDE FGH
'ep A T
y N
e t
a A d D N le d u ed b c e 8 rh 2 FS oc 0 1
)
0 o
N - 4 -9 F
B 3
'F: S P( 0
m DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE 05/05/99 COMPLETED BY M. B. Koudelka TELEPliONE 920/755-6480 The daily power average for Unit 2 during April,1999, was 513.6 MWe.
The following Licensee Event Report (LER) was submitted to the NRC during April,1999:
LER 301/99-002-00, Red Channel of Steam Generator Pressure Indication Passes Through Fire 7ene.
Safety-related maintenance included:
- 1. 2CV-00204A IIX-3A&B non-regen heat exchanger inlet valve stem replaced.
- 2. 2DY-03 white 125 VDC/120 VAC inverter capacitors replaced and voltage adjusted.
- 3. 2MS-00268 liX-1B steam generator blowdown line drain valve replaced.
- 4. 2MS-02015 tiX-1B steam generator header atmospheric steam dump control valve trim assembly replaced.
- 5. 2RC-00523A R-1 reactor vessel level indicator overpressure protection relief valve installed.
- 6. 2RC-00529 T-2 pressure relief tank reactor makeup water inlet check valve canopy seal ring installed.
- 7. 2RC-00537 RC-5003&K reactor vessel LT-447/447A thermal relief valve installed.
- 8. 2RC-00545D IIX-1 A steam generator cold leg channelhead vent overpressure protection relief valve installed.
- 9. 2RC-00546D llX-1B steam generator hot leg channelhead vent overpressure protection relief valve installed.
- 10. 2RC-00547D liX-I A steam generator hot leg channelhead vent overpressure protection relief valve installed.
I1. 2RC-00548D liX-1B steam generator cold leg channelhead vent overpressure protection relief valve installed.
- 12. 2Ril-00720 residual heat removal return to reactor coolant system valve seal weld perfoimed.
-]