ML20151W426

From kanterella
Jump to navigation Jump to search
Corrected Page to MOR for June 1998 for Pbnp Unit 2
ML20151W426
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/30/1998
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20151W381 List:
References
NUDOCS 9809150313
Download: ML20151W426 (1)


Text

l:

OPERATING DATA REPORT.

. DOCKET NO. 50-301

[

4 DATE- 08/18/98 COMPLETED BY: M. B. Koudelka TELEPHONE:(920) 7554180 OPERATING STATUS

,E, 1.

UNIT NAME: POINT BEACil NUCLEAR PLANT - UNIT 2 NOTES 2.

REPORTING PERIOD: June - 1998 r- ' S. LICENSED THERM AL POWER (M%T): 1,518.5 3

" " ' ' ' 4.

NAMEPLATING RATING (GROSS MWE): 523.8 5.

DESIGN ELECTRICAL RATING (NET MWE): 497.0 6.

MAXIMUM DEPENDABE CAPACITY (GROSS MWE): 509.0 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 1

8.

IF CHANGES 4CCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA

10. REASONS FOR RESTRICTIONS,(IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE I1. HOURS IN REPORTING PERIOD 720.0 4,343.0 227,160.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2,886.9 190,771.9
13. REACTOR RESERVE SHUTDOWN llOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 720.0 2,841.0 188,137,8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS TilERMAL ENERGY GENERATED (MW11) 1,090,759.0 4,261,626.0 270,437,574.0
17. GROSS ELECTRICAL ENERGY GENERATED 374,570.0 1,463,800.0 91,943,350.0 18 NET ELECTRICAL ENERGY GENERATED (MWH) 358,136.0 1,391,264.5 87,612,025.5
19. UNIT SERVICE FACTOR 100.0 %

65.4 %

82.8 %

20 UNIT AVAILABILITY FACIOR 100.0 %

65.4 %

83.0 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.6 %

66.1 %

79.0 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 %

64.5 %

77.6 %

23. UNIT FORCED OUTAGE RATE 0.0 %

34.6 %

2.4 %

24. SHlTTDOWNS SCHEDULED OVER NEXT 6 N WTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IFSHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22.1977