OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 04/01/97 COMPLETED 8Y: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: March - 1997
3. LICENSED THERMAL POWER (MWTI: 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANYl:

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORT'.NG PERIOD 744.0 2.160.0 231.432.0
12. NUMBER OF MOORS REACTOR WAS CRITICAL O.0 1.416.0 194.289.9
13. RC.K OH RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 i4. HOURS GENERATOR ON LINE O.0 1.151.0 190,806.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1,558,331.0 271.052,716.0
17. GROSS ELECTRICAL ENERGY GENERATED O.0 534,720.0 91.625.810.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 497,884.0 87.354,303.5
19. UNIT SERVICE FACTOR O.0%

53.3 %

82.4 %

20. UNIT AVAILABILITY FACTOR O.0%

53.3%

82.8 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%

47.5 %

77.5 %

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

46.4%

75.9 %

23. UNIT FORCED OUTAGE RATE O.0%

18.7 %

1.6 %

24. SHUTDOWNS SCHEDULED OVFR NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

Refueling. 09/06/97. 49 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

07/01/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DAlED SEPTEMBER 22,1977 9704090274 970403 PDR ADOCK 05000266 R

PDR

m e

1 POINT SEACH NUCLEAR FLANT DOCKET NO.

' 50-266 -

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach Unit 1 MONTH MARCH-1997

.DATE 4/3/97 COMPLETED BY M. B. Koudelka TELEPHONE -

414 755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY -

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

-14 11

-12 21

-14 2

-10 12

-13 22

-14 3..

-18 13

-15 23

-14

- 4

-14 14

-15 24

-11 i

5

-13 15

-17 25'

-8 6

-13 16

-12 26

-8 7

-12 17

-14 27 8

-13 18

-14 28 8

9-

-13 19

-13 29

-8 10

-12 20

-14 30 8

31-

-8 i

t 6

I I

m--

..-.. -....m.

-. 2 --.

mu

-.n<

w-s

.e.

>mer-

.rw y.-

,--.c s.

--,,~w w.

. r-r em

POINT BEACll NUCLEAR PLANT "

Docket No;--50-266 -

Unit Name Ibin Ileach. Unit i IINIT SRKTH) OWNS ANI) POWFJR REDUC'HONS

~ Date X Jnril 1 1997 '

Completed By ~ Mt. B. Kou&lta --

~ {

REPORT MONTil M ARCII - 1997 '

Telephone No.. q Al4/755-643).

- Mcttsal 4 C""**

  • ~

.Shunmg 1.kenice Event Syssem Cisle' To Present Recumnce

""I a

- No..

" Duee

' Type'.

y-Down Reput No.

Cimic o.

^2 9A1218 F:

744

.H i

NA tina renuined in hot shunkswa met taen so caAt dunamn on March 1S,1997.

=

i 4.

+i I

t i

l

'F: Forced

' ' Reason:

' Method:

" Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of G 4 saintenance or Testing 2 - Manual Scram data entry sheets

'I C - Re. fueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of '

E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F-Administrative 6 - Other (explain)

' Exhibit I - Same Source

[

G - Operational Error (explain)

II - Other (explain) r f

?

t

-?

?

i t

I-l t

I i

t i

P t

I~

PitF4U28b I

t03 G) -

l L

l

.- -. - - -. =. - -..

. -....... -..... -. = -.

~

DOCKET NO.

50-266

.. UNIT NAME-Point Beach Unit 1 i

DdTE 04/03/97 COMPLETED BY M. B. Koudelka.

TELEPHONE 414/755-6480

'. Unit I was in hot shutdown and taken to cold shutdown during the March.1997 report period.

The following Licensee Event Reports were submitted to the NRC in March,1997:

Licensee Event Report 50-266/97-008-00, Non Seismic Ductwork Located Above Safety-Related-Equipment in Containment.

4 -

~ Licensee Event Report 50-266/97-009-00, Potential Safety injection Failure During Filling of Safety injection Accumulator.

Licensee Event Report 50-266/97-010-00. Service Water and Component Cooling Water Technical Specifications Action Requirements Not Met.

Safety-related maintenance included:

1.

G-03 emergency diesel generator outer bearing replaced.

i 2,

1P-2B charging pump seals replaced.

3 P-32F service water pump balanced.

4.

P-38A-M motor-driven auxiliary feedwater pump motor vibration and motor current tests.

r t

4 w

a

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 04/01/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: March - 1997
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9 F0WER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA

10. REASONS FOR RESTRICTIONS. (IF ANYl:

NA THIS MONTH YEAR TO DATE CUMULATLVE

11. HOURS IN REPORTING PERIOD 744.0 2.160.0 216.217.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL O.O O.0 185,987.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE O.0 0.0 183.508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605.007.0
17. GROSS ELECTRICAL ENERGY GENERATED O.0 0.0 89,603,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (4,669.0) 85,406,914.5
19. UNIT SERVICE FACTOR O.0%

0.0%

84.9 %

20. UNIT AVAILABILITY FACTOR O.0%

0.0%

85.0 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%

-0.4 %

80.9 %

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 %

-0.4 %

79.5 %

23. UNIT FORCED OUTAGE RATE O.0%

0.0 %

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHl; None
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

05/17/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

~

- POINT BEACH NUCLEAR PLANT DOCKET NO.

'50-301

?

I AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, dnit 2 MONTH MARCH - 1997 DATE 4/3/97 COMPLETED BY M. B. Koudeika

~ TELEPHONE 414-755-6480 AVERAGE AVERAGE.

AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET -

t 1

-2 11

-2 21 --

2 i

i 2

-2 12

-2 22

-2 3

-2 13

-2 23

-2 l

r 4

-2 14

-2 24

-2 5

-3 15. 25. -

-2

-2

. 26

-2 6

-2 16 7

-2 17

-2 27

-2

{

8

-2 18

-2 28

-2 9

-2 19

-2 29

-2 10-

-2 20

-1 30

-2 i

31

-2 i

t I

s...

~,...

~,,

^

' POINT BEACil NUCLEAR PLANT -

' Dociet No.

' 50-301 5.1

. Unit Name '.

Point bd Unit 3 11 NIT SHtTTDOWNS AND POWER REDUCTIONS Date

  1. 1 1 1997 Completed By i MJ B. Komiella ~

REPORT MONTH MARCil-1997.

? Telephone No.L 414/755 4480;

~

Medmat of

- Causs an! Correaive Acam Namm =

Shurung licmce Event.

System Campmern

~

. No. '

' Dese Type' illours)'

Reaum

h Retmut No-Cdde* ~

cause$

._To Prevers Recurrerm;e s

w...)

-O

' %t005

.S 744 C-1-

NA NA' NA Sheduled refuelu1g anl nummerunce outage t02R22). Mayw work mens ashale.. Replacmg hda :

Iteus 2 sacant generators; mam corart4 tuard wwe separatum remlutaut; regiace 8 mato sacam -

cammlemer *alves; ilP autana crtasunkt pering; repan service mater mest heakt; regdace tssw acal amt rescaw niakeup water amahrers; replace safety upm aAumulakw level transnuners; nu.nlify -.

X412. X 03 armi Xo4 tramformer menenng armi relay cin;uas; ant due encaer nadfica:mmi,.-

F: ' Forced

' ' Reason:

'Metinl:

' ' Exhibit (;. Instructions S: Scheduled

' A - Equipment Failure (explain) 1 - Manual '

for preparation of B - Maintenance or Testing 2 - Manual Scram dat.. en.ry sheets.

C - Refueling 3 - Automatic Scram LFR Tale (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of.

E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain)

? Exhibit 1 - Same Source G - Operational Error (explain) 11 - Other (explain)

PBF4128b 103-90)

i

. DOCKET NO.

50 301

' UN'If NAME Point Beach Unit 2 DATE 04/03/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 2 was in a refueling outage during the entire March.1997 report period.

Safety-related maintenance included:

1.

2P-15 A-M safety injection pump motor alignment tab weld repaired.

L2.L 2P-15BB safety injection pump control switch replaced.

3.

2VNPSE-3213 W-6A&B U2C purge exhaust fan suction valve replaced and T-litting repaired.

a r

-