ML20151W422
| ML20151W422 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/31/1998 |
| From: | Koudelka M WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20151W381 | List: |
| References | |
| NUDOCS 9809150312 | |
| Download: ML20151W422 (1) | |
Text
_.
i 6
% 3PERATING DATA REPORT -
DOCKET NO. 50-301 Eg RW lRiu Og
}
O OPERATING STATUS 1
E I.
UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES i
2.
REPORTING PERIOD: May - 1998 p q 3.
LICENSED THERMAL POWER (MWT): 1,518.5
' 4.
NAMEPLATING RATING (GROSS MWE): 523.8 5.
DESIGN ELECTRICAL RATING (NET MWE): 497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):485.0 s
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
[
NA
[
9.
POWER LEVEL TO % HICH RESTRICTED, IF ANY f A'ET MWE): NA
- 10. REASONS FOR RESTRICTIONS,(IF ANY):
[
NA
{
THIS MONTH YEAR TO DATE CUMULATIVE I1. IlOURS IN REPORTING PERIOD 744.0 3,623.0 226,440.0
'(
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 0 2,166.9 190,051.9 l
- 13. REACTOR RESERVE SHIJTDCWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ONLINE 744.0 2,121.0 187,417.8 l
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,609.0 3,170,867.0 269,346,815.0 l
- 17. GROSS ELECTRICAL ENERGY GENERATED 388,470.0 1,089,230.0 91,568,780.0
(
- 13. NET ELECTRICAL ENERGY GENERATED (MWH) 371,583.0 1,033,128.5 87,253,889.5
- 19. UNIT SERVICE FACTOR 100.0 %
58.5 %
82.8 %
l
- 20. UNIT AVAILABILITY FACTOR 100.0 %
58.5 %
82.9%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.0 %
58.8 %
79.0 %
- 22. UNII' CAPACITY FACTOR (USING DER NET) 100.5 %
57.4 %
77.5 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
41.5 %
2.4%
- 24. SHIJTDOWNS SCliEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA t
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LE7TER DATED SEPTEMBER 22,1977
...t
-. ~, -
.