Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2
ML20141C238
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/30/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20141B933 List:
References
NUDOCS 9705160210
Download: ML20141C238 (8)


Text

{{#Wiki_filter:_ _ _ _ - _ - - - OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 05/02/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES

2. REPORTING PERIOD: April - 1997
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE 1' GURS IN REPORTING PERIOD 719.0 2.879.0 232,151.0

12. NUM8ER OF HOURS REACTOR WAS CRITICAL 0.0 1,173.6 194,047.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE O.0 1,151.0 190.806.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1,558,331.0 271,052,716.0
17. GROSS ELECTRICAL ENERGY GENERATED G.O 534,720.0 91,625,810.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 495,378.0 87,351,797.5
19. UNIT SERVICE FACTOR O.0 %

40.0% 82.2 %

20. UNIT AVAILABILITY FACTOR 0.0 %

40.0% 82.6 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 %

35.5 % 77.3 %

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

34.6 % 75.7 %

23. UNIT FORCED OUTAGE RATE 100.0 %

60.09'. 2.3%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 09/06/97,49 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

07/01/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9705160210 970506 PDR ADOCK 05000266 R PDR

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 -{ MONTH APRIL - 1997 DATE 4/1/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 i AVERAGE AVERAGE AVERAGE i DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL t DAY MWe NET DAY MWe NET DAY MWe NET 1 -8 11 -2 21 -2 l 2 -8 12 -2 22 -2 l 3 -8 13 -2 23 -2 4 -8 14 -2 24 -2 5 -8 15 -2 25 -2 6 -8 16 -2 26 -2 7 -8 17 -2 27 -2 8 -4 18 -2 28 2 9 -4 19 -2 29 -2 i 10 -3 20 -2 30 -2 ? f l l

POINT BEACil NUCLEAR PLANT Docket iMo. 50-266 Unit Name Point Beach _ Unit 1 UNIT SilUTDOWNS ANI11%)_WER REDUCTIONS Date 5/5/97 Completed By M. B. KoudelkiL REPORT MONTil APRIL - 1997 Telephone No. 414n55-M80 Medal of Liemee Event Duratior. Reactor Shur Repon No. System Conyment Cause and Correcove Acnon No. Date Type' tilours) Reason Down' Cude' Cale' To Prevent Recurrere 3 2 970213 F 719 11 1 NA The unit was in hot shut &mn amt talen to coki shutamn on March 15,199L 'F: Forced Reason: ' Method: ' Exhibit G - Instructions 2 S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG 0161) D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Sheldown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) PilF4W128h (03 AA))

~. DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE 05/05/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit I was in cold shutdown during the April.1997 report period. The following L.icensee Event Reports were submitted to the NRC in April,1997: l Licensee Event Report 50-266/97-010-01, Service Water and Component Cooling Water Technical Specifications Action Requirements not Met. Licensee Event Report 50-266/97-011-00, Containment Fan Cooler Accident Fans not Tested in Accordance with Technical Specifications. Licensee Event Report 50-266/97-012-00, Diesel-Driven Fire Pump Day Tank not Sampled in Accordance with Technical Specifications. Licensee Event Report 50-266/97-013-00, Component Cooling Water System not in Accordance with Plant Design Basis. l Licensee Event Report 50-266/97-014-00, Auxiliary Feedwater System Inoperability Due to Loss of Instrument Air. Licensee Event Report 50-266/97-015-00, Control Room Ventilation System Inoperability. Licensee Event Report 50-266/97-016-00, Steam Generator Level Logie not Tested in Accordance with Technical Specifications. Safety-related maintenance included: l 1. D-106125 Vdc station battery individual cell charged. 2. G-04 emergency diesel generator oil separator gasket and crankcase cover gaskets replaced, ball valve replaced, and main bearings inspected. 3. FO-3922-S T-35A&B boiler day tank inlet control solenoid valve replaced. 4. P-32B service water pump repacked. 5. P-32D senice water pump packing gland nuts, studs and washers replaced. f 6. SW-LW-61 1&2HX-150, HX-142/143 inlet temperature control valve adjusted. l 7. XJ-2974B P-32B service water pump discharge expansion joint replaced.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/02/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 i OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES ?

2. REPORTING PERIOD: April - 1997
3. LICENSED THERMAL POWER (MWT): 1518.5 l
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719.0 2,879.0 216,936.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 0.0 185,987.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE O.0 0.0 183,508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605.007.0
17. GROSS ELECTRICAL ENERGY GENERATED O.0 0.0 89,603,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (6,427.0) 85,405,156.5
19. UNIT SERVICE FACTOR O.0%

0.0% 84.6 %

20. UNIT AVAILABILITY FACTOR 0.0 %

0.0% 84.7 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 %

-0.5 % 80.7 %

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

-0.4 % 79.2 %

23. UNIT FORCED OUTAGE RATE 0.0 %

0.0 % 0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

06/16/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22.1977

~ i POINT BEACH NUCLEAR PLANT. DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 t i MONTH APRIL - 1997 DATE 4/1/97 ~ COMPLETED BY M. B. Koudelka f TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE l DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -3 21 -3 2 -2 12 -2 22 -3 3 -1 13 -3 23 -3 4 -1 14 -3 24 -3 5 -1 15 -3 25 -3 6 -2 16 -3 26 -3 s 7 -2 17 -3 27 -3 8 -2 18 -3 28 -3 9 -2 19 -3 29 -3 10 -3 20 --3 30 -3 1 1 . m _________________._____________________4, -4 w

POINT BEACll NUCLEAR PLANT Docket No. 50-301 Unit Name Point Beach. Unit 2 - UNIT SIIUTDOWNS ANI)f0WER REDUCTIONS Date 5/5/97 Completed By M. B. Koudelta REPORT MONTil APRIL - 1997 Telephone No. 414n55-M80 Metiud of Licensee Event Ibratum Reactor Shut Report No. System Compment Cause a!d Correenve Actum No. Date Ty pc' Olaurs) Reason

  • IMwn' Ctde' Code' To Prevent Recurrence 4

961005 S 719 C 1 NA NA NA Scheduled refuchng and maintenance outage (U2R22). Major work uerns melude: Replacmg isxh Urut 2 steam generators; nuin control tuard wire separarum resolution; replace 8 main steam condenser salves; IIP turtune crossurder piping; repair service water west header; replace tunc acal ard reactor makeup water totalizers; replace safety injectam accumulator level transnutters; nhdify XQ2, XO3, armi XM transformer netermg and relay circuits; arsi exciter nxxiificanon. 'F: Forced Reason: 'hiethal: ' Exhibit G - Instructions 2 S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4)l61) D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain) II - Other (explain) PDF 0028b (03MJ)

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE 05/05/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 2 was in a refueling outage during the entire April,1997 report period. Safety-related maintenance included: i 1. 2CPP-52 heating steam to containment pipe penetration connector fitting replaced. i 2. 2P-10A residual heat removal pump drain plug 0-ring replaced. 3. 2RH-709A P-10A residual heat removal pump discharge valve cleaned, inspected and torque checked. 4. 2RH-7138 P-10A&B residual heat removal pump discharge cross-connect valve cleaned, inspected and torque checked. 1 >}}