{{#Wiki_filter:_ _ _ _ - _ - - - OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 05/02/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES
- 2. REPORTING PERIOD: April - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE 1' GURS IN REPORTING PERIOD 719.0 2.879.0 232,151.0
- 12. NUM8ER OF HOURS REACTOR WAS CRITICAL 0.0 1,173.6 194,047.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE O.0 1,151.0 190.806.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1,558,331.0 271,052,716.0
- 17. GROSS ELECTRICAL ENERGY GENERATED G.O 534,720.0 91,625,810.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 495,378.0 87,351,797.5
- 19. UNIT SERVICE FACTOR O.0 %
40.0% 82.2 %
- 20. UNIT AVAILABILITY FACTOR 0.0 %
40.0% 82.6 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 %
35.5 % 77.3 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%
34.6 % 75.7 %
- 23. UNIT FORCED OUTAGE RATE 100.0 %
60.09'. 2.3%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 09/06/97,49 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
07/01/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9705160210 970506 PDR ADOCK 05000266 R PDR
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 -{ MONTH APRIL - 1997 DATE 4/1/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 i AVERAGE AVERAGE AVERAGE i DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL t DAY MWe NET DAY MWe NET DAY MWe NET 1 -8 11 -2 21 -2 l 2 -8 12 -2 22 -2 l 3 -8 13 -2 23 -2 4 -8 14 -2 24 -2 5 -8 15 -2 25 -2 6 -8 16 -2 26 -2 7 -8 17 -2 27 -2 8 -4 18 -2 28 2 9 -4 19 -2 29 -2 i 10 -3 20 -2 30 -2 ? f l l
POINT BEACil NUCLEAR PLANT Docket iMo. 50-266 Unit Name Point Beach _ Unit 1 UNIT SilUTDOWNS ANI11%)_WER REDUCTIONS Date 5/5/97 Completed By M. B. KoudelkiL REPORT MONTil APRIL - 1997 Telephone No. 414n55-M80 Medal of Liemee Event Duratior. Reactor Shur Repon No. System Conyment Cause and Correcove Acnon No. Date Type' tilours) Reason Down' Cude' Cale' To Prevent Recurrere 3 2 970213 F 719 11 1 NA The unit was in hot shut &mn amt talen to coki shutamn on March 15,199L 'F: Forced Reason: ' Method: ' Exhibit G - Instructions 2 S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG 0161) D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Sheldown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) PilF4W128h (03 AA))
~. DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE 05/05/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit I was in cold shutdown during the April.1997 report period. The following L.icensee Event Reports were submitted to the NRC in April,1997: l Licensee Event Report 50-266/97-010-01, Service Water and Component Cooling Water Technical Specifications Action Requirements not Met. Licensee Event Report 50-266/97-011-00, Containment Fan Cooler Accident Fans not Tested in Accordance with Technical Specifications. Licensee Event Report 50-266/97-012-00, Diesel-Driven Fire Pump Day Tank not Sampled in Accordance with Technical Specifications. Licensee Event Report 50-266/97-013-00, Component Cooling Water System not in Accordance with Plant Design Basis. l Licensee Event Report 50-266/97-014-00, Auxiliary Feedwater System Inoperability Due to Loss of Instrument Air. Licensee Event Report 50-266/97-015-00, Control Room Ventilation System Inoperability. Licensee Event Report 50-266/97-016-00, Steam Generator Level Logie not Tested in Accordance with Technical Specifications. Safety-related maintenance included: l 1. D-106125 Vdc station battery individual cell charged. 2. G-04 emergency diesel generator oil separator gasket and crankcase cover gaskets replaced, ball valve replaced, and main bearings inspected. 3. FO-3922-S T-35A&B boiler day tank inlet control solenoid valve replaced. 4. P-32B service water pump repacked. 5. P-32D senice water pump packing gland nuts, studs and washers replaced. f 6. SW-LW-61 1&2HX-150, HX-142/143 inlet temperature control valve adjusted. l 7. XJ-2974B P-32B service water pump discharge expansion joint replaced.
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/02/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 i OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES ?
- 2. REPORTING PERIOD: April - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5 l
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,879.0 216,936.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 0.0 185,987.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE O.0 0.0 183,508.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605.007.0
- 17. GROSS ELECTRICAL ENERGY GENERATED O.0 0.0 89,603,310.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (6,427.0) 85,405,156.5
- 19. UNIT SERVICE FACTOR O.0%
0.0% 84.6 %
- 20. UNIT AVAILABILITY FACTOR 0.0 %
0.0% 84.7 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 %
-0.5 % 80.7 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%
-0.4 % 79.2 %
- 23. UNIT FORCED OUTAGE RATE 0.0 %
0.0 % 0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
06/16/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22.1977
~ i POINT BEACH NUCLEAR PLANT. DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 t i MONTH APRIL - 1997 DATE 4/1/97 ~ COMPLETED BY M. B. Koudelka f TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE l DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -3 21 -3 2 -2 12 -2 22 -3 3 -1 13 -3 23 -3 4 -1 14 -3 24 -3 5 -1 15 -3 25 -3 6 -2 16 -3 26 -3 s 7 -2 17 -3 27 -3 8 -2 18 -3 28 -3 9 -2 19 -3 29 -3 10 -3 20 --3 30 -3 1 1 . m _________________._____________________4, -4 w
POINT BEACll NUCLEAR PLANT Docket No. 50-301 Unit Name Point Beach. Unit 2 - UNIT SIIUTDOWNS ANI)f0WER REDUCTIONS Date 5/5/97 Completed By M. B. Koudelta REPORT MONTil APRIL - 1997 Telephone No. 414n55-M80 Metiud of Licensee Event Ibratum Reactor Shut Report No. System Compment Cause a!d Correenve Actum No. Date Ty pc' Olaurs) Reason
- IMwn' Ctde' Code' To Prevent Recurrence 4
961005 S 719 C 1 NA NA NA Scheduled refuchng and maintenance outage (U2R22). Major work uerns melude: Replacmg isxh Urut 2 steam generators; nuin control tuard wire separarum resolution; replace 8 main steam condenser salves; IIP turtune crossurder piping; repair service water west header; replace tunc acal ard reactor makeup water totalizers; replace safety injectam accumulator level transnutters; nhdify XQ2, XO3, armi XM transformer netermg and relay circuits; arsi exciter nxxiificanon. 'F: Forced Reason: 'hiethal: ' Exhibit G - Instructions 2 S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4)l61) D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain) II - Other (explain) PDF 0028b (03MJ)
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE 05/05/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 2 was in a refueling outage during the entire April,1997 report period. Safety-related maintenance included: i 1. 2CPP-52 heating steam to containment pipe penetration connector fitting replaced. i 2. 2P-10A residual heat removal pump drain plug 0-ring replaced. 3. 2RH-709A P-10A residual heat removal pump discharge valve cleaned, inspected and torque checked. 4. 2RH-7138 P-10A&B residual heat removal pump discharge cross-connect valve cleaned, inspected and torque checked. 1 >}}