ML20141C246

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1
ML20141C246
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 03/31/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20141B933 List:
References
NUDOCS 9705160212
Download: ML20141C246 (1)


Text

_ - _ _ _ _ _ - _ - _ - _ -_. _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ -

OPERATING DATA REPORT -

DOCKET NO. 50-266 ,

DATE: 04/29/97 -

-.  ?

COMPLETED BY: M. B. Koudelka l TELEPHONE: 414 755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .  !
2. REPORTING PERIOD: March - 1997 . .
3. LICENSED THERMAL POWER (MWT): 1513.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .  !
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .  ;
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .  !
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 .. ... .... ........... ........... i
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA l
10. REASONS FOR RESTRICTIONS, (IF ANY)-

NA THIS MONTH YEAR TO DATE CUMULATIVE 5

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 231,432.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,173.6 194,047.5  ;
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 ,

t

14. HOURS GENERATOR ON LINE 0.0 1,151.0 190,806.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1,558,331.0 271.052,716.0 r
17. GROSS ELECTRICAL ENERGY GENERATED 0.0 534,720.0 91,625.810.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 497,884.0 87,354.303.5
19. UNIT SERVICE FACTOR 0.0 % 53.3 % 82.4 %  !
20. UNIT AVAILABILITY FACTOR 0.0 % 53.3 % . 82.8% -[

j 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 % 47.5 % 77.5 % l

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 % 46.4 % 75.9 %
23. UNIT FORCED OUTAGE RATE - 100.0 % 46.7% 1.9 %
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl:

Refuehng. 09/06/97,49 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: i 07/01/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9705160212 970506  ;

PDR ADOCK 05000266-R PDR ,

- -