Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2
ML20203F917
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/30/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20203F913 List:
References
NUDOCS 9712170484
Download: ML20203F917 (9)


Text

__

.-?

OPERATING DATA REPORT' DOCKET NO. 50 266 - .

i DATE: 12/02/97 '

COMPLETED BY: M B. Koudetka a

TELEPHONE: 920-755-6480 -

OPERATING STATUS

, 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .

2. REPORTING PERIOD: November - 1997 3 LICENSED THERMAL POWER (MWTI: '1518.5 . . ,

'4. NAMEPLATE RATING (GROSS MWEl: 523.8 . .

5. DESIGN ELECTRICAL RATING INET MWE): 497.0 . ~.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.O . . i
7. MArtMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . ......... ........... ..... .....

8.. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGF Il SINCE LAST REPORT, GIVE REASONS:

NA- ,

9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (NET MWEh NA
10. REASONS FOR RESTRICTIOFS, llF ANY)

4 NA' j TH:S MONTH YEAR TO DATE CUMULATIVE ,

t  :

3

11. HOURS IN REPORTING PERIOD 720.0 8,016.0 237,288.0 f ;12. NUMBEet OF HOURS REACTOR WAS CRITICAL O.0 1,173.6 194,047.5...
. 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3 i
14. HOURS GENERATOR ON LINE O.0 1.151.0 190.806.0 t
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 84G.9

?

16. GROSS THERMAL ENERGY GENERATED (MWH) 10,597,026.0 12,155,357.0 281,649,742.0
'17. GOOSS ELECTRICAL ENERGY GENERATED O.0 534.720.0 91.625.810.0 t i
18. NG ELECTRICAL ENERGY GENERATED (MWH) 0.0 478,899.0 87,335,318.5 i
19. UNIT SERVICE FACTOR
  • O.0% _14.4% 80.4 %
20. UNIT AVAILABILITY FACTOR. O0% 14.4 % 80.8 % . j
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 12.3 % 75.6 %  !
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 12.0 % 74.1 % i 1- 23. UNIT FORCED OUTAGE RATE 100.0 % 85.6 % 4.8%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH)

Refueling,'02/14/98,75 days '!

2*i. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: I l' December 2,1997, DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEM8ER 22.1977 i

9712170484 971204 i PDR ADOCK 05000266 i R PDR s 1..

s t .W. [f ,#3s W "' 4 .

D% '2T N o . 50-266 POINT BEACH NUCLEAR PLANT AVERACE DAILY UNIT POWER LEVEL UNIT Nt.ME Point, Beach. UW _

MONTH NOVEMBER - 1997 Pa 'E 12/1!97 Ci>MPLETED t1Y M. B. Koudelka _

TELEPHONE 920-75E 8i480 AVERAGE AVERAGE-AVERAGE DAILY 'JAILY DAftY 1

POWER LEVEL POWER LEVEL l POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET

-2 21 -11 1 -7 11

-7

  • 12 2 22 -14 2 ,

13 -2 23 -13 3 -7 i 14 -2 24 -13 l

4 -7 _

l

-7 15 -2 25 -14 l 5 i

16 -4 2C 13 6 -7 l 17 -7 27 14 7 -7 18 -7 28 -14 I 8 -7 19 -7 29 -13 9 -7 20 -7 30 -15 10 -6

-- J

_ s , o

f I

P91NT BEACil NUCLEr Dociet No. 50-266 Unit Name _Ecini.lknch Unit 1 UNIT Sillm) OWNS AND POWEIGk ;:.JC[lOliS Date _12/5/97 ,

Comp!cted By M.B.Koudefia -

REPORT MONT11 NOVEMHEP.- 1992 Telephon- No. 'R0/7554130 l -

I Method of Laensee Evem Report No. System Componca Cause and Correctne Actum Duratasi Reactor Shur Code' Code' To Prevem Recur.eme

. No. Date Type' Olours) Reason

  • Down' NA Na NA The una was in fut shunke and taken k> coh! Jaewn im Mmh 15, IW7.

2 970218 F 7720 il I j

l I

2 Reason: ' Method: ' Exhibit G - Instructions

'F: Forced for preparation of S: Scheduled A - Equipreznt Failure (explain) 1 - Manual

.11 - Maintenance oi Testing 2 - Manual Scram data entry sheets 3 - Automatic Scram LER Die (NUREG4;161)

C - Refueling D - Regulatory Restriction 4 - Co.itinuation of E - O,erator Training & Pievious Shutdown Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain) ' Exhibit 1 - Same Source G - Operational Errar (explain)

II - Other (explain)

Paronsb (0341) t _ . _ _ _ _ ,

DOCKET NO. 50-266 UNIT NAME Point Beach Unit .'

DATE 12/05/97 .

COM,PLETED BY M. B. Koudelka TELEPHONE 920/755-6480 Unit I was in cold shutdown during the November,1997 report period.

The following Licensee Event Reports (LERs) were submitted to the NRC during Novem ,1997:

LER 266/97 039-00, RHR Loop inoperable Due to an Inoperable CCW Pump.

LER 266/97-040-00, Reactor Caolant Pump Seal Water Return Overstress During Some Loss of Seal Coolant Scenarios.

LER 266/97-04100, Potential Common Mode Failure in Auxiliary Feedwater System Control Circuits.

Safety-related maintenance included:

1. IC-2 personnel access air lock cleaned,0-rings replaced, ball valves rebuilt, and outer door drive shaft collars adjusted.
2. ICS-481 HX-1B steam generator CS-476 feedwater regulator bypass control switch replaced.
3. IA-1281 1VNPSE-3213 purge exhaust isolation operator air inlet accumulator check vn ,e replaced.
4. IMS 2018A&C-S main steam stop solenoid valve inspected.
5. 1MS 2019 HX-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.
6. 1MS-2019-0 H.X-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve operator rewired.
7. IMS-2020 HX-1 A steam generatcr header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.

S. 1P-25A&B-M condensate pump motors beanngs lubricated.

9. 1P-29 T P-29 auxiliary feedwater turbine-driven pump turbine ball and socket assembly replaced.
10. ISI-847A&B eductors A and B sodium hydroxide supply check valve refurbished.

r

O

^

, . I 1. 1S1-850B P-10B residual heat removal pump sump B suction valve cylinder rebuilt and valve ' ,

repacked.

12. IVNPSE-3212 W-6A&B U1C purge exhaust fan suction valve replaced.

t .

e o

(

e a

OPERATING DATA REPORT .'

DOCKET NO. 50-301 DATE: 12/03/97 COMPLETED BY: M. B. Koudelka

'. ELEPHONE: 920-755-6480 OPERATING STATUS ... .

NOTES .

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 .
2. REPORTING PERIOD: November - 1997 .
3. LICENSED THEllMAL POWER (MWT): 1518.5 ,
4. NAMEPLATE R ATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . .... . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICilONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE 720.0 8,016.0 222.073.0

11. HOURS IN REPORTING PERIOD 187,885.0
12. NUMBER OF HvURS REACTOR WAS CRITICAL 355.0 1.897.4 0.0 0.0 233.9
13. REACTOR RESERVE SHUTDOWN HOURS 35's.9 1,788.5 185,296.8
14. HOURS GENERATOR ON LINE 0.0 0.0 302.2
15. UNIT RESERVE SHUTDCWN HOURS 523,920.0 2,570.941.0 26G,17E,948.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 181.560.0 877,230.0 90,480,540.0
17. GROSS ELECTRICAL ENERGY GENERATED 170,279.5 811.842.0 86,223,425.5 18 NET ELECTRICAL ENERGY GENERATED (MWH1 49.0 % 22.3 % 83.4 %

19.. UNIT SERVICE FACTOR 49.0 % 22.3 % 83.6 %

20. UNIT AVAILABILITY FACTOR 48.8% 20.9 % 79.6 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 47.6 % 20.4 % 78.1 %
22. UNIT CAPACITY FACTOR (USING DER NET) 51.0 % 29.5 % 1.3 ?'
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON 1.s (TYPE, DATE. AND DURATION OF EACH):

None f

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

01/23/98 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NHC LETTER DATED SEPTEMBER 22,1977 r -

l j

DOCKET NO - 50-301 POINT BEACH NUCLEAR PLANT UNIT NAME Point, Beach. Urut 2 AVERAGE DAILY UNIT POWER LEVEL NOVEMBER - 1997 DATE 12/1/97 MONTH COMPLETED 3Y M. B Koudelka TELEPHONE .

920-755-6480 AVERAGE AVERAGE AVERAGE dally DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET DAY - MWe AET DAY MWe NET DAY 501 21 -11 1 502 11 501 22 -8 2 SOO 12 501 23 -8 3 500 13 14 502 24 -8 4 500 15 217 25 -7

! 5 501 l 16 -15 26 -3 6 501 17 -15 27 -3 7 501 l 28 -3 l 8 501 18 -16 19 -16 29 -3 9 501 1

20 -15 30 -3 10 500 l

l l

4 POINT DEACil NUCLEAR PLANT DxLet No. 50-V)I Unit Name . Point Ikvh Unit 2 Date _12/SN7 UNIT 3111IJ110WNS AND 14)WER HI: DUCTIONS h1. n Korntelka Completed By REPORT MONTil NOVEMBER - 1997 Telephone No. 920n554*80 Metthd of' Ikemee Evers Repwt No. Sysaem Compeers Cause ars! Corrective Acike Duranon Reactor 9sur Cale* Cale' To P!cve:s Recurre x No ' Date Type' (Ilours) Reawn' ikmn' l

IA INSTRUX Usur 2 was talen k) coki stunamn mi acccardane testang of the reacsx prontam sysnern togst I

6 ~ 971115 F 3o? B 1 2t&d764340 perrmssives.

l l

'Metixxt: ' Exhibit G - Instructions

'F: Forced ' Reason:

for preparation of S: Scheduled a - Equipment Failure (explain) 1 - Manual B - Maintenance or Testing 2 - Manual Scram data en'ry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Ref,alatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown 1 Wnsing Exam 5 - Reduced laud F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

II - Other (explain)

PHF4028b (03-93)

~ , ,

DOCKET NO. 301-UNIT NAME Point Beach Unit 2

-DATE 12/05/97 COMPLETED BY. M. B. Koudelka TELEPHONE 920/755-6480-Unit 2 opetated at a daily average of 236 Mwe net during the November,1997 report period.

Safety related maintenance included:

Nuclear instrumentation system logic contacts tested (see LER 266/97-043-00).

t

_______ _._ _ _-- _ - - _ -.- . . _