MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
__
.-?
OPERATING DATA REPORT' DOCKET NO. 50 266 - .
i DATE: 12/02/97 '
COMPLETED BY: M B. Koudetka a
TELEPHONE: 920-755-6480 -
OPERATING STATUS
, 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
- 2. REPORTING PERIOD: November - 1997 3 LICENSED THERMAL POWER (MWTI: '1518.5 . . ,
'4. NAMEPLATE RATING (GROSS MWEl: 523.8 . .
- 5. DESIGN ELECTRICAL RATING INET MWE): 497.0 . ~.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.O . . i
- 7. MArtMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . ......... ........... ..... .....
8.. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGF Il SINCE LAST REPORT, GIVE REASONS:
NA- ,
- 9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (NET MWEh NA
- 10. REASONS FOR RESTRICTIOFS, llF ANY)
4 NA' j TH:S MONTH YEAR TO DATE CUMULATIVE ,
t :
3
- 11. HOURS IN REPORTING PERIOD 720.0 8,016.0 237,288.0 f ;12. NUMBEet OF HOURS REACTOR WAS CRITICAL O.0 1,173.6 194,047.5...
- . 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3 i
- 14. HOURS GENERATOR ON LINE O.0 1.151.0 190.806.0 t
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 84G.9
?
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 10,597,026.0 12,155,357.0 281,649,742.0
- '17. GOOSS ELECTRICAL ENERGY GENERATED O.0 534.720.0 91.625.810.0 t i
- 18. NG ELECTRICAL ENERGY GENERATED (MWH) 0.0 478,899.0 87,335,318.5 i
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR. O0% 14.4 % 80.8 % . j
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 12.3 % 75.6 % !
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 12.0 % 74.1 % i 1- 23. UNIT FORCED OUTAGE RATE 100.0 % 85.6 % 4.8%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH)
Refueling,'02/14/98,75 days '!
2*i. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: I l' December 2,1997, DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEM8ER 22.1977 i
9712170484 971204 i PDR ADOCK 05000266 i R PDR s 1..
s t .W. [f ,#3s W "' 4 .
D% '2T N o . 50-266 POINT BEACH NUCLEAR PLANT AVERACE DAILY UNIT POWER LEVEL UNIT Nt.ME Point, Beach. UW _
MONTH NOVEMBER - 1997 Pa 'E 12/1!97 Ci>MPLETED t1Y M. B. Koudelka _
TELEPHONE 920-75E 8i480 AVERAGE AVERAGE-AVERAGE DAILY 'JAILY DAftY 1
POWER LEVEL POWER LEVEL l POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET
-2 21 -11 1 -7 11
-7
13 -2 23 -13 3 -7 i 14 -2 24 -13 l
4 -7 _
l
-7 15 -2 25 -14 l 5 i
16 -4 2C 13 6 -7 l 17 -7 27 14 7 -7 18 -7 28 -14 I 8 -7 19 -7 29 -13 9 -7 20 -7 30 -15 10 -6
-- J
_ s , o
f I
P91NT BEACil NUCLEr Dociet No. 50-266 Unit Name _Ecini.lknch Unit 1 UNIT Sillm) OWNS AND POWEIGk ;:.JC[lOliS Date _12/5/97 ,
Comp!cted By M.B.Koudefia -
REPORT MONT11 NOVEMHEP.- 1992 Telephon- No. 'R0/7554130 l -
I Method of Laensee Evem Report No. System Componca Cause and Correctne Actum Duratasi Reactor Shur Code' Code' To Prevem Recur.eme
. No. Date Type' Olours) Reason
- Down' NA Na NA The una was in fut shunke and taken k> coh! Jaewn im Mmh 15, IW7.
2 970218 F 7720 il I j
l I
2 Reason: ' Method: ' Exhibit G - Instructions
'F: Forced for preparation of S: Scheduled A - Equipreznt Failure (explain) 1 - Manual
.11 - Maintenance oi Testing 2 - Manual Scram data entry sheets 3 - Automatic Scram LER Die (NUREG4;161)
C - Refueling D - Regulatory Restriction 4 - Co.itinuation of E - O,erator Training & Pievious Shutdown Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain) ' Exhibit 1 - Same Source G - Operational Errar (explain)
II - Other (explain)
Paronsb (0341) t _ . _ _ _ _ ,
DOCKET NO. 50-266 UNIT NAME Point Beach Unit .'
DATE 12/05/97 .
COM,PLETED BY M. B. Koudelka TELEPHONE 920/755-6480 Unit I was in cold shutdown during the November,1997 report period.
The following Licensee Event Reports (LERs) were submitted to the NRC during Novem ,1997:
LER 266/97 039-00, RHR Loop inoperable Due to an Inoperable CCW Pump.
LER 266/97-040-00, Reactor Caolant Pump Seal Water Return Overstress During Some Loss of Seal Coolant Scenarios.
LER 266/97-04100, Potential Common Mode Failure in Auxiliary Feedwater System Control Circuits.
Safety-related maintenance included:
- 1. IC-2 personnel access air lock cleaned,0-rings replaced, ball valves rebuilt, and outer door drive shaft collars adjusted.
- 2. ICS-481 HX-1B steam generator CS-476 feedwater regulator bypass control switch replaced.
- 3. IA-1281 1VNPSE-3213 purge exhaust isolation operator air inlet accumulator check vn ,e replaced.
- 4. IMS 2018A&C-S main steam stop solenoid valve inspected.
- 5. 1MS 2019 HX-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.
- 6. 1MS-2019-0 H.X-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve operator rewired.
- 7. IMS-2020 HX-1 A steam generatcr header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.
S. 1P-25A&B-M condensate pump motors beanngs lubricated.
- 9. 1P-29 T P-29 auxiliary feedwater turbine-driven pump turbine ball and socket assembly replaced.
- 10. ISI-847A&B eductors A and B sodium hydroxide supply check valve refurbished.
r
O
^
, . I 1. 1S1-850B P-10B residual heat removal pump sump B suction valve cylinder rebuilt and valve ' ,
repacked.
- 12. IVNPSE-3212 W-6A&B U1C purge exhaust fan suction valve replaced.
t .
e o
(
e a
OPERATING DATA REPORT .'
DOCKET NO. 50-301 DATE: 12/03/97 COMPLETED BY: M. B. Koudelka
'. ELEPHONE: 920-755-6480 OPERATING STATUS ... .
NOTES .
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 .
- 2. REPORTING PERIOD: November - 1997 .
- 3. LICENSED THEllMAL POWER (MWT): 1518.5 ,
- 4. NAMEPLATE R ATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . .... . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICilONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE 720.0 8,016.0 222.073.0
- 11. HOURS IN REPORTING PERIOD 187,885.0
- 12. NUMBER OF HvURS REACTOR WAS CRITICAL 355.0 1.897.4 0.0 0.0 233.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 35's.9 1,788.5 185,296.8
- 14. HOURS GENERATOR ON LINE 0.0 0.0 302.2
- 15. UNIT RESERVE SHUTDCWN HOURS 523,920.0 2,570.941.0 26G,17E,948.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 181.560.0 877,230.0 90,480,540.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 170,279.5 811.842.0 86,223,425.5 18 NET ELECTRICAL ENERGY GENERATED (MWH1 49.0 % 22.3 % 83.4 %
19.. UNIT SERVICE FACTOR 49.0 % 22.3 % 83.6 %
- 20. UNIT AVAILABILITY FACTOR 48.8% 20.9 % 79.6 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 47.6 % 20.4 % 78.1 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 51.0 % 29.5 % 1.3 ?'
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON 1.s (TYPE, DATE. AND DURATION OF EACH):
None f
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
01/23/98 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NHC LETTER DATED SEPTEMBER 22,1977 r -
l j
DOCKET NO - 50-301 POINT BEACH NUCLEAR PLANT UNIT NAME Point, Beach. Urut 2 AVERAGE DAILY UNIT POWER LEVEL NOVEMBER - 1997 DATE 12/1/97 MONTH COMPLETED 3Y M. B Koudelka TELEPHONE .
920-755-6480 AVERAGE AVERAGE AVERAGE dally DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET DAY - MWe AET DAY MWe NET DAY 501 21 -11 1 502 11 501 22 -8 2 SOO 12 501 23 -8 3 500 13 14 502 24 -8 4 500 15 217 25 -7
! 5 501 l 16 -15 26 -3 6 501 17 -15 27 -3 7 501 l 28 -3 l 8 501 18 -16 19 -16 29 -3 9 501 1
20 -15 30 -3 10 500 l
l l
4 POINT DEACil NUCLEAR PLANT DxLet No. 50-V)I Unit Name . Point Ikvh Unit 2 Date _12/SN7 UNIT 3111IJ110WNS AND 14)WER HI: DUCTIONS h1. n Korntelka Completed By REPORT MONTil NOVEMBER - 1997 Telephone No. 920n554*80 Metthd of' Ikemee Evers Repwt No. Sysaem Compeers Cause ars! Corrective Acike Duranon Reactor 9sur Cale* Cale' To P!cve:s Recurre x No ' Date Type' (Ilours) Reawn' ikmn' l
IA INSTRUX Usur 2 was talen k) coki stunamn mi acccardane testang of the reacsx prontam sysnern togst I
6 ~ 971115 F 3o? B 1 2t&d764340 perrmssives.
l l
'Metixxt: ' Exhibit G - Instructions
'F: Forced ' Reason:
for preparation of S: Scheduled a - Equipment Failure (explain) 1 - Manual B - Maintenance or Testing 2 - Manual Scram data en'ry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Ref,alatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown 1 Wnsing Exam 5 - Reduced laud F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)
II - Other (explain)
PHF4028b (03-93)
~ , ,
DOCKET NO. 301-UNIT NAME Point Beach Unit 2
-DATE 12/05/97 COMPLETED BY. M. B. Koudelka TELEPHONE 920/755-6480-Unit 2 opetated at a daily average of 236 Mwe net during the November,1997 report period.
Safety related maintenance included:
Nuclear instrumentation system logic contacts tested (see LER 266/97-043-00).
t