Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2
ML20203F917
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/30/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20203F913 List:
References
NUDOCS 9712170484
Download: ML20203F917 (9)


Text

__

.-?

OPERATING DATA REPORT' DOCKET NO. 50 266 -

i DATE: 12/02/97 COMPLETED BY: M B. Koudetka f

a TELEPHONE: 920-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES

2. REPORTING PERIOD: November - 1997 3 LICENSED THERMAL POWER (MWTI: '1518.5

'4. NAMEPLATE RATING (GROSS MWEl: 523.8

5. DESIGN ELECTRICAL RATING INET MWE): 497.0

~.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.O i
7. MArtMUM DEPENDABLE CAPACITY (NET MWE): 485.0 8.. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGF Il SINCE LAST REPORT, GIVE REASONS:

NA-

9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (NET MWEh NA
10. REASONS FOR RESTRICTIOFS, llF ANY):

4 NA' j

TH:S MONTH YEAR TO DATE CUMULATIVE t

11. HOURS IN REPORTING PERIOD 720.0 8,016.0 237,288.0 3

'f

12. NUMBEet OF HOURS REACTOR WAS CRITICAL O.0 1,173.6 194,047.5...

f

13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3 i
14. HOURS GENERATOR ON LINE O.0 1.151.0 190.806.0 t
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 84G.9

?

16. GROSS THERMAL ENERGY GENERATED (MWH) 10,597,026.0 12,155,357.0 281,649,742.0

}

'17. GOOSS ELECTRICAL ENERGY GENERATED O.0 534.720.0 91.625.810.0 t

i

18. NG ELECTRICAL ENERGY GENERATED (MWH) 0.0 478,899.0 87,335,318.5 i

O.0%

_14.4%

80.4 %

[

19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR.

O0%

14.4 %

80.8 %.

j

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%

12.3 %

75.6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

12.0 %

74.1 %

i 1-

23. UNIT FORCED OUTAGE RATE 100.0 %

85.6 %

4.8%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

Refueling,'02/14/98,75 days 2*i. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

I l'

December 2,1997, DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEM8ER 22.1977 9712170484 971204 i

i PDR ADOCK 05000266 i

1..

R PDR s

s t

.W.

[f,#3s W "' 4.

POINT BEACH NUCLEAR PLANT D% '2T N o.

50-266 AVERACE DAILY UNIT POWER LEVEL UNIT Nt.ME Point, Beach. UW _

MONTH NOVEMBER -

1997 Pa 'E 12/1!97 Ci>MPLETED t1Y M. B. Koudelka TELEPHONE 920-75E 8i480 AVERAGE AVERAGE-AVERAGE DAILY

'JAILY DAftY 1

POWER LEVEL POWER LEVEL l

POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

-7 11

-2 21

-11 22

-14 12 2

2

-7 3

-7 13

-2 23

-13

-2 24

-13 i

l 4

-7 14 l

l 5

-7 15

-2 25

-14 i

6

-7 16

-4 2C 13 l

7

-7 17

-7 27 14 I

8

-7 18

-7 28

-14 9

-7 19

-7 29

-13 10

-6 20

-7 30

-15

-- J o

s

f I

P91NT BEACil NUCLEr Dociet No.

50-266 Unit Name

_Ecini.lknch Unit 1 UNIT Sillm) OWNS AND POWEIGk ;:.JC[lOliS Date

_12/5/97 Comp!cted By M.B.Koudefia REPORT MONT11 NOVEMHEP.- 1992 Telephon-No.

'R0/7554130 l

I Method of Laensee Evem Duratasi Reactor Shur Report No.

System Componca Cause and Correctne Actum

. No.

Date Type' Olours)

Reason

  • Down' Code' Code' To Prevem Recur.eme 2

970218 F

7720 il I

NA Na NA The una was in fut shunke and taken k> coh! Jaewn im Mmh 15, IW7.

j l

I 2

' Method:

' Exhibit G - Instructions

'F: Forced Reason:

S: Scheduled A - Equipreznt Failure (explain) 1 - Manual for preparation of

.11 - Maintenance oi Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER Die (NUREG4;161)

D - Regulatory Restriction 4 - Co.itinuation of E - O,erator Training &

Pievious Shutdown Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)

' Exhibit 1 - Same Source G - Operational Errar (explain)

II - Other (explain)

Paronsb (0341) t

DOCKET NO.

50-266 UNIT NAME Point Beach Unit.'

DATE 12/05/97 COM,PLETED BY M. B. Koudelka TELEPHONE 920/755-6480 Unit I was in cold shutdown during the November,1997 report period.

The following Licensee Event Reports (LERs) were submitted to the NRC during Novem

,1997:

LER 266/97 039-00, RHR Loop inoperable Due to an Inoperable CCW Pump.

LER 266/97-040-00, Reactor Caolant Pump Seal Water Return Overstress During Some Loss of Seal Coolant Scenarios.

LER 266/97-04100, Potential Common Mode Failure in Auxiliary Feedwater System Control Circuits.

Safety-related maintenance included:

1.

IC-2 personnel access air lock cleaned,0-rings replaced, ball valves rebuilt, and outer door drive shaft collars adjusted.

2.

ICS-481 HX-1B steam generator CS-476 feedwater regulator bypass control switch replaced.

3.

IA-1281 1VNPSE-3213 purge exhaust isolation operator air inlet accumulator check vn,e replaced.

4.

IMS 2018A&C-S main steam stop solenoid valve inspected.

5.

1MS 2019 HX-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.

6.

1MS-2019-0 H.X-1B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valve operator rewired.

7.

IMS-2020 HX-1 A steam generatcr header P-29 auxiliary feedwater pump steam supply motor-operated valve rewired.

S.

1P-25A&B-M condensate pump motors beanngs lubricated.

9.

1P-29 T P-29 auxiliary feedwater turbine-driven pump turbine ball and socket assembly replaced.

10.

ISI-847A&B eductors A and B sodium hydroxide supply check valve refurbished.

r

O

^

I 1.

1S1-850B P-10B residual heat removal pump sump B suction valve cylinder rebuilt and valve '

repacked.

12.

IVNPSE-3212 W-6A&B U1C purge exhaust fan suction valve replaced.

t e

o

(

e a

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 12/03/97 COMPLETED BY: M. B. Koudelka

'. ELEPHONE: 920-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: November - 1997
3. LICENSED THEllMAL POWER (MWT): 1518.5
4. NAMEPLATE R ATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICilONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE 720.0 8,016.0 222.073.0

11. HOURS IN REPORTING PERIOD
12. NUMBER OF HvURS REACTOR WAS CRITICAL 355.0 1.897.4 187,885.0 0.0 0.0 233.9
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON LINE 35's.9 1,788.5 185,296.8
15. UNIT RESERVE SHUTDCWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 523,920.0 2,570.941.0 26G,17E,948.0
17. GROSS ELECTRICAL ENERGY GENERATED 181.560.0 877,230.0 90,480,540.0 18 NET ELECTRICAL ENERGY GENERATED (MWH1 170,279.5 811.842.0 86,223,425.5 19.. UNIT SERVICE FACTOR 49.0 %

22.3 %

83.4 %

20. UNIT AVAILABILITY FACTOR 49.0 %

22.3 %

83.6 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 48.8%

20.9 %

79.6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 47.6 %

20.4 %

78.1 %

23. UNIT FORCED OUTAGE RATE 51.0 %

29.5 %

1.3 ?'

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON 1.s (TYPE, DATE. AND DURATION OF EACH):

f None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

01/23/98 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NHC LETTER DATED SEPTEMBER 22,1977 r

l j

POINT BEACH NUCLEAR PLANT DOCKET NO -

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point, Beach. Urut 2 MONTH NOVEMBER -

1997 DATE 12/1/97 COMPLETED 3Y M. B Koudelka 920-755-6480 TELEPHONE AVERAGE AVERAGE AVERAGE dally DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY

- MWe AET 1

502 11 501 21

-11 2

SOO 12 501 22

-8 3

500 13 501 23

-8 4

500 14 502 24

-8 5

501 15 217 25

-7 l

6 501 16

-15 26

-3 7

501 17

-15 27

-3 l

501 18

-16 28

-3 l

8 9

501 19

-16 29

-3 1

10 500 20

-15 30

-3 l

l l

4 POINT DEACil NUCLEAR PLANT DxLet No.

50-V)I Unit Name

. Point Ikvh Unit 2 UNIT 3111IJ110WNS AND 14)WER HI: DUCTIONS Date

_12/SN7 Completed By h1. n Korntelka REPORT MONTil NOVEMBER - 1997 Telephone No.

920n554*80 Metthd of' Ikemee Evers Duranon Reactor 9sur Repwt No.

Sysaem Compeers Cause ars! Corrective Acike No

' Date Type' (Ilours)

Reawn' ikmn' Cale*

Cale' To P!cve:s Recurre x l

Usur 2 was talen k) coki stunamn mi acccardane testang of the reacsx prontam sysnern togst I

6

~ 971115 F

3o?

B 1

2t&d764340 IA INSTRUX perrmssives.

l l

'F: Forced

' Reason:

'Metixxt:

' Exhibit G - Instructions S: Scheduled a - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data en'ry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Ref,alatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown 1 Wnsing Exam 5 - Reduced laud F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

II - Other (explain)

PHF4028b (03-93)

~

DOCKET NO. 301-UNIT NAME Point Beach Unit 2

-DATE 12/05/97 COMPLETED BY.

M. B. Koudelka TELEPHONE 920/755-6480-Unit 2 opetated at a daily average of 236 Mwe net during the November,1997 report period.

Safety related maintenance included:

Nuclear instrumentation system logic contacts tested (see LER 266/97-043-00).