l Wisconsin Electnc
\\
POWER COMPANY i
i Point Beoch Nuclear Plant (414) 755-2321 6610 Nuclear Rd.. Two Rivers. WI 54241 j
l l
PBL 97-0010 January 7,1997 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 i
Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNJTS 1 AND 2 l
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of December 1996.
Sincerely, i
l l
l
. A. Patulski General Manager Nuclear Operations smb i
\\l l
Attachments
\\
14011 l
^
cc:
L. L. Smith, PSCW
,]/[
NRC Regional Administrator, Region III NRC Resident inspector 9701140308 961231 PDR ADOCK 05000266 R
PDR A sukskn ornomin Dryrmxath>n
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 01/06/97 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 i
OPERATING STATUS i
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES
- 2. REPORTING PERIOD: December - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
Self-imposed restriction.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 744.0 229,272.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 192,873.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 744.0 744.0 189,655.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,075,254.0 1.075,254.0 269,494,385.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 368,290.0 368,290.0 91,091,090.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 352,505.5 352,505.5 86.856,419.5
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
82.7 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
100.0 %
83.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.7 %
97.7 %
77.8 %
- 22. UNIT CAPACITY FACTOR.'USING DER NET) 95.3 %
95.3 %
76.2 %
6
- 23. UNIT FORCED OUTAGE RATE O.0%
0.0%
1.4%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 05/10/97, 50 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 i
.______m POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach Unit 1 MONTH DECEMBER -
1996 DATE 1/6/97 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
476 11 499 21 449 2
497 12 498 22 449 3
498 13 497 23 448 4
498 14 498 24 448 5
498 15 498 25 449 6
498 16 497 26 450 7
498 17 472 27 446 8
499 16 449 28 449 9
495 19 446 29 450 10 496 20 447 30 447 31 448
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Nane Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 1/9/97 Completed By B. J. Vander Velde i
REPORT MONTII DECEMBER - 1996 Telephone No.
414/755-6681 l
Method of Licensee Event Duration Reactor Report No.
System Component Cause and Corrective Action j
No.
Date Type' (Hours)
Reason' Shut Down' Code
- Code' To Prevent Recurrence 3
%I201 S
0 B
5 NA HB VALVEX The unit was reduced to 69% power for turbine stop valve tests, atmosphenc steam dump tears, crossover steam dump tests, and condenser steam dump tests.
4
% I217 5
0 F
5 NA ZZ ZZ7777
'Ihe unit entered a self-inrosed power reduction to 90% power.
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &-
Previous Shutdown Licensing Exam 5 - Reduced Imad F-Administrative 6 - Other (explain)
' Exhibit 1 - Same Source G - Operational Error (explain)
H - Other (explain)
PBF-0028b (03-90),
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE 1/7/97 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 1 operated at an average of 474 MWe net for the December,1996 report period.
The following Licensee Event Reports were submitted to the NRC in December 1996:
Licensee Event Report 50-266/96-010, Emergency Diesel Generator (G-01) Governor Failure.
' Licensee Event Report 50-266/96-011, Delta T Trip Setpoints Not Reduced in Accordance with Technical Specifications.
Safety-related maintenance included:
- 1. C-02 main control board annunciator buzzer replaced.
- 2. P-012A spent fuel pool cooling pump flow tested.
- 3. PI-03368A emergency diesel generator turbo-charger oil pressure indicator calibrated.
- 4. D-06124 volt DC station battery flash arrestor replaced.
5.
120 volt system multi and/or non-numbered equipment receptacle replaced.
- 6. G-01 emergency diesel generator air start circuit repaired and tested, relay replaced.
- 7. G-02 emergency diesel genciator air start system headers cleaned and frequency meter replaced.
- 8. F-137A emergency diesel generator fuel oil pump discharge filters replaced.
- 9. C-2 personnel access air lock gear replaced.
- 10. Piping HB-19 rarvice water to engineered safeguards piping replaced.
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 01/08/97 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
$ NOTES
- 2. REPORTING PERIOD: December - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8,784.0 214,057.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 6,660.5 185,987.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0
. 0.0 233.9
- 14. HOURS GENERATOR ON LINE O.0 6,653.9 183,508.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 9,072,854.0 263,605,007.0
- 17. GROSS ELECTRICAL ENERGY GENERATED O.0 3,100,050.0 89,603,310.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2,946,934.0 85,411,583.5
- 19. UNIT SERVICE FACTOR O.0%
75.8 %
85.7 %
- 20. UNIT AVAILABILITY FACTOR O.0%
75.8 %
85.9 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%
69.2 %
81.7 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%
67.5 %
80.3 %
- 23. UNIT FORCED OUTAGE RATE O.0%
0.3%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
02/15/U DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
.-- ------------r
,.____a a
,s
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH DECEMBER -
1996 DATE 1/6/97 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 4
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-2 11
-2 21
-3 2
-2 12
-2 22
-3 3
-2 13
-2 23
-3 4
-2 14
-2 24
-3 5
-2 15
-2 25
-4 6
-2 16
-2 26
-4 7
-2 17
-2 27
-3 8
-2 18
-3 28
-3 9
0 19
-2 29
-3 10
-1 20
-2 30
-3 31
-2 t
... m i
POINT BEACH NUCLEAR PLANT Docket No.
50-301 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date 1/6/97
+
Completed By B. J. Vander Velde REPORT MONTH DECEMBER - 1996 Telephone No.
414r755-6681 Method of Licensee Event Duration Reactor Report No.
System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason' Shut Down' Code' Code' To Prevent Recurtence 4
961005 S
744.0 C
1 NA NA NA Scheduled refueling and maintenance (U2R22). Major work items include: Replacire boeh Unit 2 steem generators; main control board wire separation resolution; repiece 8 main aseem condenser valves; HP turbine crosaunder piping; repair service water west header, replace boric acid and reactor makeup water totalizers; replace oefety irsection accunmistor levei trememitters; modify X02, XO3, and XO4 treneformer metering and relay circuite; and exciter modification.
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Imd F - Administrative 6 - Other (explain)
Mahibit I - Same Source G - Operational Error (explain)
H - Other (explain) 4 PBF-0028b (0340).
4 4
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE 1/7/97 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 i
)
Unit 2 was in a refueling outage during the entire December,1996 report period.
Safety-related maintenance included:
)
- 1. LT-00461 steam generator level transmitter shielded extension cable installed.
- 2. LT-00462 steam generator level transmitter shielded extension cable installed.
l
- 3. LT-00463 steam generator level transmitter shielded extension cable installed.
l
- 4. LT-00471 steam generator level transmitter shielded extension cab!e installed.
- 5. LT-00472 steam generator level transmitter shielded extension cable installed.
- 6. LT-00473 steam generator level transmitter shielded extension cable installed.
- 7. SC-00955 reactor coolant hot leg sample isolation valve stroke tested.
- 8. C-1 equipment access air lock (lower) gasket repaired.
i
- 9. C-2 personnel air lock o-rings replaced.
- 10. P-011 A component cooling water pump probe mounting blocks installed.
I1. P-01IB component cooling water pump probe mounting blocks installed.
- 12. HS-32 steam generator main steam line east snubber tested.
- 13. HS-33 steam generator main steam line west snubber tested.
~
\\
- 14. HS-36 steam generator north side snubber tested.
- 15. HS-37 steam generator middle side snubber tested.
- 16. HS-38 steam generator south side snubber tested.
- 17. HS-39 steam generator north side snubber tested.
- 18. B52-328F control power transformer replaced.
- 19. B52-3210C control power transformer replaced.
- 20. B52-425C control power transformer replaced.
- 21. B52-4275 control power transformer replaced.
- 22. CPP-39 containment cooler supply pipe penetration adapter neplaced.
- 23. SI-00825A reactor water storage tank outlet cleaned.
e
'