Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20132C0351996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20132C0491996-10-31031 October 1996 Revised Monthly Operating Rept for Oct 1996 for Point Beach Plant,Unit 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with 05000266/LER-1999-007, :on 990831,cable Tray Fire Stops Do Not Meet App R Exemption Requirements Occurred.Caused by Improper Installation of Approved Plant Mod.New Mod Has Been Initiated to Provide Three H Rated Fire Barrier1999-09-30030 September 1999
- on 990831,cable Tray Fire Stops Do Not Meet App R Exemption Requirements Occurred.Caused by Improper Installation of Approved Plant Mod.New Mod Has Been Initiated to Provide Three H Rated Fire Barrier
ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 05000266/LER-1999-004, :on 990420,fuel Oil Transfer Pump Cable in AFW Pump Room Was Noted Outside App R Design Basis.Caused by Error in Design of New Fuel Oil Transfer Sys.Condition Rept CR 99-1140 Was Initiated1999-09-0202 September 1999
- on 990420,fuel Oil Transfer Pump Cable in AFW Pump Room Was Noted Outside App R Design Basis.Caused by Error in Design of New Fuel Oil Transfer Sys.Condition Rept CR 99-1140 Was Initiated
NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with ML20211A7641999-08-11011 August 1999 Safety Evaluation Supporting Amends 190 & 195 to Licenses DPR-24 & DPR-27,respectively NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with 05000301/LER-1999-003-01, :on 990505,licensee Personnel Discovered That Refueling Interval Surveillance of Emergency Lighting Required by TS 15.4.6.A.3 Was Not Conducted.Cause Unknown. Task Sheet call-ups for Both Procedures Have Been Created1999-05-28028 May 1999
- on 990505,licensee Personnel Discovered That Refueling Interval Surveillance of Emergency Lighting Required by TS 15.4.6.A.3 Was Not Conducted.Cause Unknown. Task Sheet call-ups for Both Procedures Have Been Created
05000266/LER-1999-004, :on 990420,discovered That Fuel Oil Transfer Pump Cable in AFW Pump Room Outside App R Design Basis. Caused by Cable Routing Discrepancy.Fire Rounds Increased & Procedures Being Developed to Facilitate Using G-05 EDG1999-05-20020 May 1999
- on 990420,discovered That Fuel Oil Transfer Pump Cable in AFW Pump Room Outside App R Design Basis. Caused by Cable Routing Discrepancy.Fire Rounds Increased & Procedures Being Developed to Facilitate Using G-05 EDG
05000266/LER-1999-003, :on 990406,TS SR for ECCS & Containment Spray Was Not Fully Implemented.Caused by Conservative Interpretation of Valve Impact.Revised Procedures.With1999-05-0606 May 1999
- on 990406,TS SR for ECCS & Containment Spray Was Not Fully Implemented.Caused by Conservative Interpretation of Valve Impact.Revised Procedures.With
ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20206A5031999-04-23023 April 1999 Safety Evaluation Supporting Amends 189 & 194 to Licenses DPR-24 & DPR-27,respectively 05000301/LER-1999-002-01, :on 990323,discovered That Red Channel of SG Pressure Indication Passes Through Fire Zone.Caused by 1983 Modification Oversight.Twice Per Shift Fire Round Has Been Established for Fire Zone Pending Cable Routing Correction1999-04-16016 April 1999
- on 990323,discovered That Red Channel of SG Pressure Indication Passes Through Fire Zone.Caused by 1983 Modification Oversight.Twice Per Shift Fire Round Has Been Established for Fire Zone Pending Cable Routing Correction
NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with 05000301/LER-1999-001-01, :on 990211,EDG Output Breaker Failed to Remain Closed During Surveillance Testing.Caused by Breaker Control Switch Failing to React Quickly.Modified Closing Circuit for EDG Output1999-03-10010 March 1999
- on 990211,EDG Output Breaker Failed to Remain Closed During Surveillance Testing.Caused by Breaker Control Switch Failing to React Quickly.Modified Closing Circuit for EDG Output
ML20207K2751999-03-0202 March 1999 Safety Evaluation Supporting Amends 188 & 193 to Licenses DPR-24 & DPR-27,respectively ML20207L3471999-03-0202 March 1999 Safety Evaluation Supporting Amends 187 & 192 to Licenses DPR-24 & DPR-27,respectively ML20207D5691999-03-0101 March 1999 Safety Evaluation Supporting Amends 186 & 191 to Licenses DPR-24 & DPR-27,respectively NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20236U7201998-07-21021 July 1998 Safety Evaluation Supporting Amend 190 to License DPR-27 ML20236T1761998-07-17017 July 1998 Safety Evaluation Supporting Amends 185 & 189 to Licenses DPR-24 & DPR-27,respectively 05000266/LER-1998-015, :on 980420,containment Fan Cooler Test Results Were Noted Outside Acceptance Criteria.Cause Is Under Evaluation.Pressure Washing of Air Side of Cooling Coils for All Four Unit 1 CFCs Has Been Completed1998-07-17017 July 1998
- on 980420,containment Fan Cooler Test Results Were Noted Outside Acceptance Criteria.Cause Is Under Evaluation.Pressure Washing of Air Side of Cooling Coils for All Four Unit 1 CFCs Has Been Completed
05000266/LER-1998-019, :on 980615,discovered That Containment Hydrogen Monitors Lacked Environmentally Qualified Coating on Terminal Strips.Caused by Terminal Strips Being Disturbed W/O Subsequent Reapplication of Coating.Replaced Coating1998-07-14014 July 1998
- on 980615,discovered That Containment Hydrogen Monitors Lacked Environmentally Qualified Coating on Terminal Strips.Caused by Terminal Strips Being Disturbed W/O Subsequent Reapplication of Coating.Replaced Coating
ML20236S0161998-07-13013 July 1998 Safety Evaluation Supporting Amends 184 & 188 to Licenses DPR-24 & DPR-27,respectively ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6061998-07-0808 July 1998 Safety Evaluation Granting Request for Relief RR-2-23,from Performing ASME Code,Section XI Volumetric Coverage Requirements for SG nozzle-to-safe End Welds & Associated Safe end-to-pipe Welds During Third 10-yr ISI Interval ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 1999-09-30
[Table view] |
Text
o O'g 4 OPERATING DATA REPORT DOCKET NO. 50-266 E
DATE: 09/04/98 COMPLETED BY: M. B. Koudelka TELEPHONE:(920) 755-6480 1b 4
OPERA 1ING STATUS 1
t D 1.
UNIT NAME: POINT BEACll NUCLEAR PLANT - UNIT I NOTES I N E
REPORTING PERIOD: August - 1998 3.
LICENSED THERMAL POWER (MWT): 1,518.5
- 4. ' NAMEPLATING RATING (GROSS MWE): 523.8 5.
DESIGN ELECTRICAL RATING (NET MWE): 497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGli 7) SINCE LAST REIORT, GIVE REASONS:
9.
POWER EVEL TO WHICH RESTRICTED, IF ANY (NET MWE): N/A
- 10. REASONS FOR RESTRICTIONS,(IF ANY):
Tills lWONTH YEAR TO DATE CUMULATIVE
- 11. IlOURS IN REPORTING PERIOD 744.0 5,831.0 243,863.0
- 12. NUMBER OFllOURS REACTOR WAS CRITICAL 744.0 2,626.0 197,417.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ONLINE 744.0 2,561.2 194,088.4
- 15. UNIT RESERVE SIIUTDOWN IIOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWil) 1,129,476.0 3,650,820.0 275,742,873.0
- 17. GROSS ELECTRICAL ENERGY GENERASD 389,190.0 1,271,330.0 93,259,090.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 372,533.5 1,204,677.0 88,886.518.0
- 19. UNIT SERVICE FACTOR 100.0 %
43.9 %
79.6 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
43.9 %
79.9 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.2 %
42.6%
74.9 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 %
41.6 %
73.3 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
4.7%
- 24. SHUTDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SilUTDOWN AT END 0" REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 UNIT NAME:
Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE:
09/02/98 MONTH AUGUST - 1998 COMPLETED BY:
M. B. Koudelka TELEPHONE:
(920) 755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NFT DAY MWe NET DAY MWe NET I
506 l!
497 21 498 2
505 12 496 22 497 3
507 13 496 23 505 4
503 14 498 24 509 502 15 498 25 502 6
501 16 496 26 501 7
500 17 499 27 500 8
500 18 498 28 504 9
500 19 498 29 506 10 500 20 500 30 503 31 501
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Name Point Bexh_ Unit 1 UNIT SHtTfDOWNS AND POWER REDUCTIONS Date 9/2/98 Completed By M. B. Koudelka REPORT MONTil AUGUST-1998 Telephone No.
920n55-6480 Method of 1xensee Event Duration Reactor Shut Report No.
System Conymera Cause armi Corrective Action No.
Date Type' Olours)
Reason' Down' Code' Cale'
. To Prevers Recurrence f
i NA NA NA NA N?
NA NA NA NA y
'F: Forced Reason:
' Method:
Exhibit G -Instructions 2
S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation ~of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced load l
5 F - Administrative 6 - Other (explain)
Exhibit 1 - Same Scurce G - Operational Error (explain) 11 - Other (explain) t i
i r
I
,t I
i t
I l
PBF4uDb I
(o3M)
[
t
.m...
. m..-
m m
m m
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE 09/02/98 COMPLETED BY M. B. Koudelka l
TELEPHONE 920/755-6480 The daily power average for Unit I during August,1998, was 500 MWe, The following Licensee Event Reports (LERs) were submitted to the NRC during August,1998:
LER 266/98-010-01, Inadverte it Technical Specification Surveillance of Containment Spray Logic.
LER 266/98-022-00, Technical Specification LCOs for Safety Injection and Residual Heat Removal i
Operation.
LER 266/98-023-00, Circulating Water Pumphouse Roof not in Accordance with Plant Design Basis.
LER 266/98-024-00, Inadvertent Emergency Diesel Start.
LER 266/98-025-00, Control Room Ventilation System Outside Design Basis.
Safety-related maintenance included:
1.
1CC-738A&B HX-11 A&B residual heat removal heat exchanger shell side inlet valve l
handwheel housing fasteners replaced.
l 2.
FO-58 T-31 A diesel generator day tank drain valve repacked.
3.
IFT-412/1FT-415 reactor coolant Loops A and B flow transmitter snubber internals inspected.
4.
IP-29 turbine-driven auxiliary feedwater pump inboard and outboard bearing housings lube oil sampled and changed.
l 5.
ISC-955 reactor coolant hot leg sample isolation valve repaired.
- 6..
SW-28"t28-S K-3B service air compressor inlet solenoid valve replaced.
7.
W-183C G-03 emergency diesel generator room large capacity exhaust fan motor bearings lubricated.
i e
,. +..
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 09/04/98 COMPLETED BY: M. B. Koudelka TELEPilONE- (920', 755-6180 OPERATING STATUS 1.
UNIT NAME: POINT BEACII NUCLEAR PLANT - UNii 2 NOTFS 2.
REPORTING PERIOD: August - 1998 3.
LICENSED TIIERMAL POWER (MWT): 1,518.5 4 NAMEPLATING RATING (GROSS MWE): 523.8 5.
DESIGN ELECTRICAL RATING (NET MWE): 497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TIIROUGil 7) SINCE LAST REPORT, GIVE REASONS:
i 1
9.
POWER LEVEL TO WillCll RESTRICTED, IF ANY (NET MWE): N/A
- 10. REASONS FOR RESTRICTIONS,(IF ANY):
TIIIS MONTli YEAR TO DATE CUMULATIVE I1. IiOURS IN REPORTING PERIOD 744.0 5,831.0 228,648.0 1
- 12. NUMBER OFIIOURS REACTOR WAS CRITICAL 744.0 4,374.9 192,259.9
- 13. REACIVR RESERVE SHUTDOWN IIOURS 0.0 0.0 233.9
- 14. HOURS GENERATOP ONLINE 744.0 4,329.0 189,625.8 t
- 15. UNIT RESERVE SilUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,302.0 6,517,076.0 272,693,024.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 377,710.0 2,223,980.0 92.703,530.0 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWil) 360,845.5 2,117,614.0 88,338,375.0
- 19. UNIT SERVICE FACTOR 100.0 %
74.2 %
82.9 %
l
- 20. UNIT AVAILABILITY FACTOR 100.0 %
74.2 %
83.1 %
- 21. UNTT CAPACITY FACTOR (USING MDC NET) 100.0 %
74.9 %
79.2 %
{
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.6 %
73.1 %
77.7 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
25.8 %
2.4%
j
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACil):
l Rekueling, 12/04/98,65 days
- 25. IF 5HUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A I
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 f
4 um
.. m..
s-v-
m
-i-.
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL DATE:
09/02/98 MONTH AUGUST - 1998 COMPLETED BY:
M. B. Koudelka TELEPHONE-(920) 755-6480 f
AVERAGE AVERAGE AVERAGE DAILY DALLY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NFF DAY MWe NFF DAY MWe NET I
491 11 481 21 482 t
2 490 12 479 22 481 3
491 13 478 23 491 4
487 14 480 24 496 5
485 15 481 25 490 6
484 16 479 26 484 7
483 17 482 27 488 8
482 18 482 28 491 9
483 19 482 29 492 10 482 20 4 84 30 489 31 485 L
i t
l POINT BEACil N~UCLEAR PLANT Docket No.
50-301 Unit Name Point Beacit Unit 2 UNIT SHUFDOWNS AND POWER REDUCTIONS Date 9/2/98 Completed By M. B. Koudelka REPORT MONTil AUGUST - 1998 Telephone No.
920/755-648Q Mettud of Licensee Event Duratum Reactor Shut Repnt No.
System Compmern Cause ard Correcove Acuan No.
Date Type' Olours)
Reason' Down' Code' Code' To Prevers Recumnce NA NA NA NA NA NA NA NA NA
'F: Forced Reason:
' Method:
" Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdowit Licensing Exam 5 - Reduced Load 5
F - Administrative 6 - Other (explain)
Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain)
I PBF402Xb (034))
i
~
1 DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE 09/02/98 COMPLETED BY M. B. Koudelka TELEPIIONE 920/755-6480 The daily power average for Unit 2 during August,1998, was 485 MWe, t
1 Safety-related maintenance included:
1.
D-12-20 power to 2DY-01 red inverter breaker replaced.
2.
2N-41 nuclear instrumentation system power range channel isolation amp adjusted.
3.
2P-2C charging pump speed control adjusted.
l l
l l
4 J
f t