ML20054F422

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for May 1982
ML20054F422
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/10/1982
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
NRC
Shared Package
ML20054F423 List:
References
NUDOCS 8206160319
Download: ML20054F422 (1)


Text

_ _____

^

o Wisconsin Electnc mcoww 231 W. MICHIGAN, P.O. BOX 2046, MitWAUKEE, WI 53201 June 10, 1982 Director of Regulatory Operations U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACli NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Flant, for the calendar month of May 1982.

Very truly yours, M

Executive Vice President Sol Bt rstein Attachments Copies to J.

G. Keppler - NRC, Region III NRC Resident Inspector C.

F.

Riederer - PSCW 8206160319 820610 PDR ADOCK 05000266 R

PDR

/