Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2
ML20135F272
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/28/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20135F271 List:
References
NUDOCS 9703110304
Download: ML20135F272 (6)


Text

_ . .. _ _ .

OPERATING DATA REPORT DOCKET NO. 50-266 ~

DATE: 03/05/97 .

COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES .
2. REPORTING PERIOD: February - 1997
3. LICENSED THERMAL POWER (MWT): 1518.5 .
4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 .. ... ..
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
10. REASONS FOR RESTRICTIONS, (IF ANY):

Self-imposed restriction THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672.0 1,416.0 230,688.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 194,289.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 407.0 1,151.0 190,806.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY 3ENERATED (MWH) 543,673.0 1,558,331.0 271,052,716.0
17. GROSS ELECTRICAL ENERGY GENERATED 186,160.0 534,720.0 91,625,810.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 173,940.5 506,983.5 87,363,403.0
19. UNIT SERVICE FACTOR 60.6 % 81.3 % 82.7 %
20. UNIT AVAILABILITY FACTOR 60.6 % 81.3 % 83.1 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 53.4 % 73.8 % 77.8 %
22. UNIT CAPACITY FACTOR (USING DER NET) 52.1 % 72.0 % 76.2 %
23. UNIT FORCED OUTAGE RATE 39.4 % 18.7% 1.6 %
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 05/10/97, 50 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

03/09/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9703110304 970306 '

PDR ADOCK 05000266 R PDR

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach,' Unit 1 MONTH FEBRUARY - 1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480  ;

i AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY ,

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET

  • 1 -8 11 448 21 -15  ;

2 380 12 449 22 -15 r

3 450 13 448 23 -15  ;

4 451 14 448 24 -13 5 451 15 449 25 -14 6 450 16 418 26 -15 7 450 17 447 27 -14 l 8 533 18 316 28 -14 9 405 19 -10 29 10 406 20 -18 l

i i

- - . --. _ . -._ ~. . .- ~

POINT BEACH NUCLEAR PLANT Derket No. 50-266 Unit Nome Point Beach, Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 3/6/97 .

  • ~

Completed By M. B. Koudelka REPORT MONTH FEBRUARY - 1997 Telephone No. 414/755-6480 Metimd of Licensee Event Duration Reactor Report No. System Component Cause and Corrective Action I

b. Date Type' (Hours) Reason' Shut Down' Code' Code' To Prevent Recurrence >

l 970701 F 21 H I NA HI SUPOPTB The unit was taken offline to allow plant conditions to support steam generatcr loop entry for steam generator channelhead ductwork support work.

I 2 970218 F 244 H I NA WA PUMPB The unit is in het shutdown for time to repair the P-32A service water pump and IP-II A component cooling water pump. I

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) ' Exhibit I - Same Source -

G - Operational Error (explain)

H - Other (explain)

PBFa n8b ,

(03-90)

DOCKET NO. 50-266

. UNIT NAME Point Beach Unit 1

, DATE 03/06/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 259 MWe net during the February,1997 report period.

The following Licensee Event Reports were submitted to the NRC in February,1997:

Licensee Event Report 50-266/97-001-00, Safety Injection Delay Times Exceed Design Basis Values Licensee Event Report 50-266/97-002-00, Potential to Overpressurize Piping Between Containment Isolation Valves During a Design Basis Accident Licensee Event Report 50-266/97-003-00, Spare Containment Penetrations not Leak Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-004-00, Potential Common Mode Failure in Vital DC Electrical System l Licensee Event Report 50-266/97-005-00, ISI-852A Not Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-006-00, Potential Refueling Cavity Drain Failure Could Affect Accident Mitigation  :

Licensee Event Report 50-266/97-007-00, Potential Emergency Diesel Generator Overload Condition l

Safety-related maintenance included:  ;

1, IC-2 personnel access air lock inspection.

2. CC-722A IP-11 A&B component cooling water pump suction cross-connect valve studs replaced.

. 3. D-12-03 power to BS-1256A-S/1256B-S reactor makeup water tank fill solenoid breaker replaced.

4. 1P-29 turbine-driven auxiliary feedwater pump packing adjusted.
5. P-32A service water pump stufling box replaced and pump balanced.
6. P-32A-M service water pump motor rotor balanced and upper bearings replaced.

._.._m __ - <. .._..._.__ _ _ _..__...m_- .~ ..-__._._ -. ._._-- _ . . . _ _ _ _ _ _ - - . . _ . . . . _ _ __. .

OPERATING DATA REPORT ..

, l DOCKET NO. 50-301 DATE: 03/05/97 .

COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS i 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES ,

2. REPORTING PERIOD: February - 1997 . .
3. LICENSED THERMAL POWER (MWT): 1518.5  :
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. M AXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
7. M AXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . .... . . . .....
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: t i

NA >

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA .

THIS MONTH YEAR TO DATE CUMULATIVE ,

11. HOURS IN REPORTING PERIOD 672.0 1,416.0 215,473.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 185,987.6 13.- REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 0.0 0.0 183,508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605,007.0 0.0 0.0 89,603,310.0 i
17. GROSS ELECTRICAL ENERGY GENERATED
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (3,288.5) 85,408.295.0 ,
19. UNIT SERVICE FACTOR 0.0% 0.0% 85.2 %
20. UNIT AVAILABILITY FACTOR 0.0% 0.0% - 85.3 %  :'
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% -0.5 % 81.2 %
22. UNIT CAPACITY F!tCTOR (USING DER NET) 0.0% -0.5 % - 79.8%
23. UNIT FORCED OUTAGE RATE .

0.0% 0.0% 0.9 % i

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

04/12/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

_ _ _ - _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ m -

_ . _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ - - - - - - +w- e -e-, _ - r-- , . , & - - -_ _ ._ _ --_m.___

~

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 l

MONTH FEBRUARY - 1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755 6480 l

AVERAGE AVERAGE AVERAGE  !

DAILY DAILY DAILY -

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET .

1 -2 11 -3 21 -2 2 -2 12 -3 22 -2 3 -2 13 -3 23 -2 4 '

-2 14 -3 24 -2 5 -2 15 -3 25 -2 6 -2 16 -4 26 -2 7 -2 17 -3 27 -2 i

8 -2 18 -3 28 -2 9 -2 19 -2 29 10 -3 20 -2 ,