OPERATING DATA REPORT DOCKET NO. 50-266
~
DATE: 03/05/97 COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
- 2. REPORTING PERIOD: February - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
Self-imposed restriction THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 230,688.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 194,289.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 407.0 1,151.0 190,806.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY 3ENERATED (MWH) 543,673.0 1,558,331.0 271,052,716.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 186,160.0 534,720.0 91,625,810.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 173,940.5 506,983.5 87,363,403.0
- 19. UNIT SERVICE FACTOR 60.6 %
81.3 %
82.7 %
- 20. UNIT AVAILABILITY FACTOR 60.6 %
81.3 %
83.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 53.4 %
73.8 %
77.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 52.1 %
72.0 %
76.2 %
- 23. UNIT FORCED OUTAGE RATE 39.4 %
18.7%
1.6 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 05/10/97, 50 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
03/09/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9703110304 970306 PDR ADOCK 05000266 R
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach,' Unit 1 MONTH FEBRUARY -
1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 i
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-8 11 448 21
-15 2
380 12 449 22
-15 r
3 450 13 448 23
-15 4
451 14 448 24
-13 5
451 15 449 25
-14 6
450 16 418 26
-15 7
450 17 447 27
-14 l
8 533 18 316 28
-14 9
405 19
-10 29 10 406 20
-18 l
i i
~...-
~
POINT BEACH NUCLEAR PLANT Derket No.
50-266 Unit Nome Point Beach, Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 3/6/97
- ~
Completed By M. B. Koudelka REPORT MONTH FEBRUARY - 1997 Telephone No.
414/755-6480 Metimd of Licensee Event Duration Reactor Report No.
System Component Cause and Corrective Action I
b.
Date Type' (Hours)
Reason' Shut Down' Code' Code' To Prevent Recurrence l
970701 F
21 H
I NA HI SUPOPTB The unit was taken offline to allow plant conditions to support steam generatcr loop entry for steam generator channelhead ductwork support work.
I 2
970218 F
244 H
I NA WA PUMPB The unit is in het shutdown for time to repair the P-32A service water pump and IP-II A component cooling water pump.
I
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
' Exhibit I - Same Source -
G - Operational Error (explain)
H - Other (explain)
PBFa n8b (03-90)
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE 03/06/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 259 MWe net during the February,1997 report period.
The following Licensee Event Reports were submitted to the NRC in February,1997:
Licensee Event Report 50-266/97-001-00, Safety Injection Delay Times Exceed Design Basis Values Licensee Event Report 50-266/97-002-00, Potential to Overpressurize Piping Between Containment Isolation Valves During a Design Basis Accident Licensee Event Report 50-266/97-003-00, Spare Containment Penetrations not Leak Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-004-00, Potential Common Mode Failure in Vital DC Electrical System l
Licensee Event Report 50-266/97-005-00, ISI-852A Not Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-006-00, Potential Refueling Cavity Drain Failure Could Affect Accident Mitigation Licensee Event Report 50-266/97-007-00, Potential Emergency Diesel Generator Overload Condition Safety-related maintenance included:
1, IC-2 personnel access air lock inspection.
2.
CC-722A IP-11 A&B component cooling water pump suction cross-connect valve studs replaced.
3.
D-12-03 power to BS-1256A-S/1256B-S reactor makeup water tank fill solenoid breaker replaced.
4.
1P-29 turbine-driven auxiliary feedwater pump packing adjusted.
5.
P-32A service water pump stufling box replaced and pump balanced.
6.
P-32A-M service water pump motor rotor balanced and upper bearings replaced.
._.._m
_..__...m_-
.~..-__._._ -.._._-- _.
OPERATING DATA REPORT l
DOCKET NO. 50-301 i
DATE: 03/05/97
}
COMPLETED BY: M. B. Koudelka l'
TELEPHONE: 414-755-6480 OPERATING STATUS i
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES I
- 2. REPORTING PERIOD: February - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 l
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 i
- 6. M AXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. M AXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
t i
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA l
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 215,473.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 185,987.6 13.- REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 0.0 0.0 183,508.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605,007.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 0.0 0.0 89,603,310.0 i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (3,288.5) 85,408.295.0
- 19. UNIT SERVICE FACTOR 0.0%
0.0%
85.2 %
- 20. UNIT AVAILABILITY FACTOR 0.0%
0.0%
- 85.3 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%
-0.5 %
81.2 %
- 22. UNIT CAPACITY F!tCTOR (USING DER NET) 0.0%
-0.5 %
- 79.8%
0.0%
0.0%
0.9 %
i
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
}
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
04/12/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 f
m
+w-e
-e-,
r--,.
-- m.
~
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 l
MONTH FEBRUARY -
1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755 6480 l
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY -
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-2 11
-3 21
-2 2
-2 12
-3 22
-2 3
-2 13
-3 23
-2 4
-2 14
-3 24
-2 5
-2 15
-3 25
-2 6
-2 16
-4 26
-2 7
-2 17
-3 27
-2 i
8
-2 18
-3 28
-2 9
-2 19
-2 29 10
-3 20
-2