ML20135F272
ML20135F272 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 02/28/1997 |
From: | Koudelka M WISCONSIN ELECTRIC POWER CO. |
To: | |
Shared Package | |
ML20135F271 | List: |
References | |
NUDOCS 9703110304 | |
Download: ML20135F272 (6) | |
Text
_ . .. _ _ .
OPERATING DATA REPORT DOCKET NO. 50-266 ~
DATE: 03/05/97 .
COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES .
- 2. REPORTING PERIOD: February - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 .. ... ..
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
Self-imposed restriction THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 230,688.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 194,289.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 407.0 1,151.0 190,806.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY 3ENERATED (MWH) 543,673.0 1,558,331.0 271,052,716.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 186,160.0 534,720.0 91,625,810.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 173,940.5 506,983.5 87,363,403.0
- 19. UNIT SERVICE FACTOR 60.6 % 81.3 % 82.7 %
- 20. UNIT AVAILABILITY FACTOR 60.6 % 81.3 % 83.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 53.4 % 73.8 % 77.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 52.1 % 72.0 % 76.2 %
- 23. UNIT FORCED OUTAGE RATE 39.4 % 18.7% 1.6 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 05/10/97, 50 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
03/09/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 9703110304 970306 '
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach,' Unit 1 MONTH FEBRUARY - 1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 ;
i AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY ,
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET
- 1 -8 11 448 21 -15 ;
2 380 12 449 22 -15 r
3 450 13 448 23 -15 ;
4 451 14 448 24 -13 5 451 15 449 25 -14 6 450 16 418 26 -15 7 450 17 447 27 -14 l 8 533 18 316 28 -14 9 405 19 -10 29 10 406 20 -18 l
i i
- - . --. _ . -._ ~. . .- ~
POINT BEACH NUCLEAR PLANT Derket No. 50-266 Unit Nome Point Beach, Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 3/6/97 .
- ~
Completed By M. B. Koudelka REPORT MONTH FEBRUARY - 1997 Telephone No. 414/755-6480 Metimd of Licensee Event Duration Reactor Report No. System Component Cause and Corrective Action I
- b. Date Type' (Hours) Reason' Shut Down' Code' Code' To Prevent Recurrence >
l 970701 F 21 H I NA HI SUPOPTB The unit was taken offline to allow plant conditions to support steam generatcr loop entry for steam generator channelhead ductwork support work.
I 2 970218 F 244 H I NA WA PUMPB The unit is in het shutdown for time to repair the P-32A service water pump and IP-II A component cooling water pump. I
'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) ' Exhibit I - Same Source -
G - Operational Error (explain)
H - Other (explain)
PBFa n8b ,
(03-90)
DOCKET NO. 50-266
. UNIT NAME Point Beach Unit 1
, DATE 03/06/97 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 259 MWe net during the February,1997 report period.
The following Licensee Event Reports were submitted to the NRC in February,1997:
Licensee Event Report 50-266/97-001-00, Safety Injection Delay Times Exceed Design Basis Values Licensee Event Report 50-266/97-002-00, Potential to Overpressurize Piping Between Containment Isolation Valves During a Design Basis Accident Licensee Event Report 50-266/97-003-00, Spare Containment Penetrations not Leak Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-004-00, Potential Common Mode Failure in Vital DC Electrical System l Licensee Event Report 50-266/97-005-00, ISI-852A Not Tested in Accordance with Technical Specifications Licensee Event Report 50-266/97-006-00, Potential Refueling Cavity Drain Failure Could Affect Accident Mitigation :
Licensee Event Report 50-266/97-007-00, Potential Emergency Diesel Generator Overload Condition l
Safety-related maintenance included: ;
1, IC-2 personnel access air lock inspection.
- 2. CC-722A IP-11 A&B component cooling water pump suction cross-connect valve studs replaced.
. 3. D-12-03 power to BS-1256A-S/1256B-S reactor makeup water tank fill solenoid breaker replaced.
- 4. 1P-29 turbine-driven auxiliary feedwater pump packing adjusted.
- 5. P-32A service water pump stufling box replaced and pump balanced.
- 6. P-32A-M service water pump motor rotor balanced and upper bearings replaced.
._.._m __ - <. .._..._.__ _ _ _..__...m_- .~ ..-__._._ -. ._._-- _ . . . _ _ _ _ _ _ - - . . _ . . . . _ _ __. .
OPERATING DATA REPORT ..
, l DOCKET NO. 50-301 DATE: 03/05/97 .
COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS i 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES ,
- 2. REPORTING PERIOD: February - 1997 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 :
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
- 6. M AXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
- 7. M AXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . .... . . . .....
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: t i
NA >
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA .
THIS MONTH YEAR TO DATE CUMULATIVE ,
- 11. HOURS IN REPORTING PERIOD 672.0 1,416.0 215,473.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 185,987.6 13.- REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 0.0 0.0 183,508.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 0.0 263,605,007.0 0.0 0.0 89,603,310.0 i
- 17. GROSS ELECTRICAL ENERGY GENERATED
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (3,288.5) 85,408.295.0 ,
- 19. UNIT SERVICE FACTOR 0.0% 0.0% 85.2 %
- 20. UNIT AVAILABILITY FACTOR 0.0% 0.0% - 85.3 % :'
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% -0.5 % 81.2 %
- 22. UNIT CAPACITY F!tCTOR (USING DER NET) 0.0% -0.5 % - 79.8%
- 23. UNIT FORCED OUTAGE RATE .
0.0% 0.0% 0.9 % i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
04/12/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
_ _ _ - _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ m -
_ . _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ - - - - - - +w- e -e-, _ - r-- , . , & - - -_ _ ._ _ --_m.___
~
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 l
MONTH FEBRUARY - 1997 DATE 3/6/97 COMPLETED BY M. B. Koudelka TELEPHONE 414-755 6480 l
AVERAGE AVERAGE AVERAGE !
DAILY DAILY DAILY -
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET .
1 -2 11 -3 21 -2 2 -2 12 -3 22 -2 3 -2 13 -3 23 -2 4 '
-2 14 -3 24 -2 5 -2 15 -3 25 -2 6 -2 16 -4 26 -2 7 -2 17 -3 27 -2 i
8 -2 18 -3 28 -2 9 -2 19 -2 29 10 -3 20 -2 ,