OPERATING DaIA PEPORT .

DUCUET NO. 50-266 DATE June 7, 1982 COMPLETED BY C. O. FAY TELEPHONE 414 277 2811 OPERATING STATU5

1. UNIT NAME: POINT BEACH NUCLEAR PLAN. UNIT 1 . NOTES .
2. REPORTING PERIOD: MAY 1982 .
3. LICENSED THERNAL POUER (duT): 1518. .
4. NAMEPLATE RATING (GROSS nUE): 523.8 .
5. DESIGN ELECTRICAL RATING INET MUE): 497. .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS hue): 519. .
7. NAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. . ..,.............. ......
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REFCRT, GIVE REASONS:

NOT APPLICABLE 9 POWER LEVEL TO UHICH RESTRICTED, IF ANY (NET MUE): 445.0

10. REASONS FOR RESTRICTIONS, (IF ANY): Maximum dependable capacity reduced because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.

THIS MONTH YR TO DATE CUHULATIVE

11. HOURS IN REPURTING PERIOD 744 3.623 101,399
12. NunBER OF HOURS REACTOR WAS CRITICAL 744.0 3,199.1 83,552.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.4 618.7
14. HOURS GENERATOR ON LINE 744.0 3,168.5 81,140.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 27.4 7?1.7
16. GROSS THERNAL ENErsGY GENERATED (BWH) 867,029 3,970.279 111,323,119 17 GROSS ELECTRICAL ENERGY GENERATED (MuH) 290,370 1.329,550 37,350,830
18. NET ELECTRICAL ENERGY GENERATED (NUH) 274.695 1.242,526 35,543,737
19. UNIT SERVICE FACTOR 100.0 87.5 80.0
20. UNIT AVAILABILITf FACTOR 100.0 88.2 80.8
21. UNIT CAFACITY FACTOR (USING MDC NET) 74.6 70.4 71.6
22. UNIT CAPACITY FACTOR (USING DER NET) 74.3 70.1 70.5
23. UNIT FORCED OUTAGE RATE 0.0 0.4 3.0
24. SHUIDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND .)URATION OF EACH):

Five week refueling outage scheduled to begin November 5, 1982.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT-SHUTDOWN r, ara RFPORTFfi AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 8206160324 820610 PDR ADOCK 05000266 R ____ __

PDR

DOCKET NOo 50-266 UNIT NAME Point Beach Unit 1 DATE June 7, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811

, AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 371 11 372 21 371 2 370 12 373 22 369 3 371 13 372 23 370 4 370 14 371 24 370 i

5 371 15 371 25 370

, 6 374 16 369 26 369 i

7 370 17 369 27 370 1

4 8 374 18 369 28 368 9 362 19 370 29 _

370 10 372 2d 370 30 347 31 361 AD-28A (1-77)

,  ! . li1i I  !  ; '  !  ;

( A 0D 1-

- 2 N 78 o

)

8B D

SF a

t e

SF co hr ec de ud ego ~

l e

d ccga3a

=gu2 _

HGFEDCBAR

- e mogoa" a _

OOAORRMEs ~

tp dp e e a q o gujo c W U _

h m eg fiu n R N .

e r ir u u n i: majnBt E I ranaletp .

8g goRou nm P T -

titalem t O -

( isotine R S eotronan T H _

xnr rgnt L U _

paaTy c i M T .

lltr eF c O D a iaR a Re N O iEvie oi en T W -

nrans rl ps H N .

) r it u oe S o nr Tr ee re _

r gi t A c s E N

( &t t( Nv M D e i e

.o ne a -

p x Lo x p y P in t O -

l c l W

a e a 1 E i n i 9 R n s n mgvV 8

) e )

go'o 2 R .

E -

E D x U a C m gEgaia T I

o g'o n O 3 N -

S 4321M e .

t C OAMMh a tuaao Tu htnnd os -

eouu: e rmaa P all ra C

( t en TO eiS vd EM D p

xcc e LP UO -

r nC EL NC lSa to PE IK -

acm ir Rr r HT OE TE T

na ee ND N

) m cc E AN ut MO 5 ri Y E.

SE ( Sate rv ee 4 P 5 ox Nhtix n 1 o 0 uh U e io h cA 4 i -

ri Reoni ec / 4 n 2 cb Etnsb t 2 t 6 ai Gs i i, 7 6 t - oft o 7 F B 0ffo n - a e I 1o rG 2 a

_ - 6rD - 8 c 1 API 1 h S ) Ltrn 1 a Eaes U .

m R pt n e Ear i Fnru t it c lr - 1 ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date June 7, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at an average of 370 MWe from May 1 to the end of the reporting period with no load reductions.

No safety-related maintenance was completed in conjunction with the operation of Unit 1.

f 1

I i

i I

w

I OFERATING DAiA F2FORf DOCVET NO. 50-301 DATE June 7, 1982 COMPLETED BY C. U. FAY TELEPHONE 414 277 2811 CFERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: MAY 1982 .
3. LICENSED THERMAL POWER (nUI): 1518. .
4. NAMEPLA1E NATING (GROSS MUE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MUE): 497.
6. MAXIMUM LEPENDABLE CAPACITY (GROS 5 nWE): 519.
7. MAXIhuM DEPENDABLE CAPACITY (NET MUE): 495. .. . . . . . . . . ..............
8. IF CHANGES OCCUR IN CAPACITY RATINb5 (ITEnS WUMBER 3 IHROUGH 7) SINCE LAST REFORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO UHICH RESTRICTED, IF AHi (NET MUE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANf): NOT APPLICABLE THIS n0 NTH YR TO DATE CUMULATIVE 744 3.623 86,184
11. HOURS IN REPORTING PERIOD 163.2 2,688.9 77,079.3
12. NUnBER OF HOURS REACTOR UAS CRITICAL 0.0 0.0 193.0
13. REACTOR RESERVE SHUIDDLN HOURS 121.0 2.643.6 75,702.2
14. HOURS GENERATOR ON LINE 0.0 0.0 178.0
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENEPGY GENERATED (MWH) 124,874 3,856,642 104,113,486 42,070 1,295,610 35,318,620
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (huh) 37,094 1,235,414 33,618,880 16.3 73.0 87.8
19. UNIT SERVICE FACTOR 16.3 73.0 88.0
20. UNIT AVAILABILITY FACTOR 10.1 62.9 79.4
21. UNIT CAPACITY FACTOR (USING MUC NET) 10.0 68.6 78.5
22. UNIT CAPsCITY FACTOR (USING DER NET) 2.8 0.1 1.6
23. UNIT FORCED OUTAGE RATE
24. SHUIDOUNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOUN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTOPS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 ygg.

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2

DATE June 7, 1982 COMPLETED BY C. W. Fay

) TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 -7 2 -2 12 -2 22 -9 3 -2 13 -2 23 -7 4 -2 14 -2 24 -9 5 -2 15 -2 25 -11 6 -2 16 -2 26 2 7 -2 17 -2 27 191 8 -2 18 -2 28 203 9 -2 19 -6 29 353 10 -2 20 -8 30 443~  ;

31 443 AD-28A (1-77)

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 -

UNIT NAME Point Beach Unit 2 REPORT MONTH May, 1982 COMPLETED C 1. Fa TELEPHONE 414/277-2811 u

c W tD o 4 o

32 au "co St co n m

!!"o v 'o En ao No. Date g gg g jjg Licensee Event y g'g Cause and Corrective Action e am o ve Report No. m EU To Prevent Recurrence c- m gmg g 8

4 e

1 820416 S 618.9 C 1 N/A ZZ ZZZZZ Returned to power following com-

- letion of refueling outage.

2 820527 S 0.6 B 4 N/A ZZ ZZZZZ Unit removed from service for off-line turbine testing.

3 820528 F 3.5 B 3 N/A ZZ ZZZZZ Spurious safety injection signal caused by loose terminal connection discovered while isolating 125 V DC bus ground fault.

F: Forced Reason: 3 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File j D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain)

D' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date June 7, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 continued in its refueling outage and maintenance work from the beginning of the month until 1857 hours0.0215 days <br />0.516 hours <br />0.00307 weeks <br />7.065885e-4 months <br /> on May 26 when the unit was returned to service.

During fuel movement on May 4, a grid strap on fuel assembly J-67 was torn and that fuel assembly was replaced with another assembly from the spent fuel pool. One~of the two pieces of the fuel assembly grid strap was found in the refueling cavity near the upender and was moved to the spent fuel pit. The other piece was located in the spent fuel pit canal and remains there.

Sludge lancing was completed on May 4 and water balances showed that 37.2 of the 41.3 and 47.8 of the 53.8 gallons of sludge were removed from "A" and "B" steam generators, respectively.

As a precautionary measure following the discovery of-foreign objects in the Ginna Plant steam generators, an annular search of the secondary side of the Point Beach Unit 2 steam generators was completed on May 10. A 14-inch piece of welding rod was detected in "A" steam generator and removed. There was no visual indication of tube distress in the vicinity of the weld rod nor was there any eddy current indication of wall thinning.

The Unit 2 "A" reactor coolant pump motor was replaced and filling and venting of the reactor coolant system was completed at 0327 hours0.00378 days <br />0.0908 hours <br />5.406746e-4 weeks <br />1.244235e-4 months <br /> on May 19.

Since returning to service on May 26, it was noted that gross generator output for Unit 2 has dropped from 518 MWe to 511 MWo. This loss in unit output is attributed to a feedwater temperature reduction caused by operating with the bypass of the No. 4 feedwater heaters in the full open position. The No. 4 feedwater heaters have approximately 26% of their tubes plugged and the heaters will be replaced during the next Unit 2 refueling outage.

Primary-to-secondary leakage for Unit 2 remained less than ten gallons per day subsequent to Unit 2's return to service.