OPERATif4G DATA REPORT DOCKET NO. 50-266 I n',o gg DATE- 07/02/97 N
m COMPLETED BY: M. B. Koudeika 89 Qg TELEPHONE-414 755-6480 OPERATlf1G STATUS r.s w
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES 0
- 2. REPORTING PERIOD. June.1997 my y
- 3. UCENSED THERMAL POWER (MWT): 1518.5
- 4. f4AMEPLATE RATING (GROSS Med): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MVE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NA
- 9. POWER LEVEL TO 'HICH RESTRICTED. IF ANY INET MVd): NA
- 10. REASONS FOR RES s RICTIONS. (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PER!OD 720.0 4.343.0 233.615.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.O 1.173.6 194.047.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 l
- 14. HOURS GENERATOR ON LINE O.0 1,151.0 190.806.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1.558.331.0 271.052.716.0
- 17. GROSS ELECTRICAL ENERGY GENERATED O.0 534.720.0 91.625.810.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH1 0.0 492.822.0 87.349.241.5
- 19. UNIT SERVICE FACTOR O.0%
26.5 %
81.7 %
- 20. UNIT AVAILABILITY FACTOR O.0 %
26.5 %
82.0 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%
23.4 %
76.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 %
22.8 %
75.2 %
- 23. UNIT FORCED OUTAGE RATE 100.0 %
73.5 %
3.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
Refueling, 09/13/97. 49 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
07/29/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
OPERATING DATA REPORT DOCKET NO. 50-301 I
DATE: 07/02/97 COMPLETED BY: M. B. Koodelka i
}
TELEPHONE: 414-755 6480 l'
OPERATING STATUS i
- 1. UNIT NAME: POINT BEACH fJUCLEAR PLAtJT - UNIT 2
. NOTES j
- 2. REPORTING PERIOD: June - 1997 I
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
]
- 5. DESIGN ELECTRICAL HATING INET MVE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MV&l: 485.0 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE): NA
- 10. REASONS FOR RESTRICTIONS. (IF ANY):
NA
}
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 4.343.0 218.400.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL OO O.O 185.987.6
- 13. REACTOR RESERVE SHUTDOWN HOURS O.O O.0 233.9 I
- 14. HOURS GENERATOR ON LINE O.0 0.0 183.508.3
- 15. UNIT RESERVE SHUTDOWN HOURS O.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWtu O.O O.0 263.605.007.0
- 17. GROSS ELECTRICAL ENERGY GENERATED O.O O.O 89.603.310.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (10.508.01 85.401.075.5 l
- 19. UNIT SERVICE FACTOR O.0%
0.0 %
84.0 %
- 20. UNIT AVAILABILITY FACTOR O.0%
0.0%
84.2 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0%
-0.5 %
80.1 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%
-0.5 %
78.7 %
- 23. UNIT FORCED OUTAGE RATE O.0%
0.0%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
07/08/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22.1977