Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates
ML20210H960
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/30/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20210H950 List:
References
NUDOCS 9708140265
Download: ML20210H960 (2)


Text

, ,

OPERATif4G DATA REPORT DOCKET NO. 50-266 '.

  • I n',o .

ggN DATE- 07/02/97 .

m COMPLETED BY: M. B. Koudeika 89 Qg TELEPHONE- 414 755-6480 OPERATlf1G STATUS r.s w ........... . ......... ...........

0

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .

my 2. REPORTING PERIOD. June .1997 . .

y 3. UCENSED THERMAL POWER (MWT): 1518.5 . .

4. f4AMEPLATE RATING (GROSS Med): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MVE): 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 .... ..... ......... . ....... ...
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

NA

9. POWER LEVEL TO 'HICH RESTRICTED. IF ANY INET MVd): NA
10. REASONS FOR RES s RICTIONS. (IF ANY):  ;

NA THIS MONTH YEAR TO DATE CUMULATIVE *

11. HOURS IN REPORTING PER!OD 720.0 4.343.0 233.615.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL O.O 1.173.6 194.047.5  ;
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 l
14. HOURS GENERATOR ON LINE O.0 1,151.0 190.806.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 1.558.331.0 271.052.716.0
17. GROSS ELECTRICAL ENERGY GENERATED O.0 534.720.0 91.625.810.0
18. NET ELECTRICAL ENERGY GENERATED (MWH1 0.0 492.822.0 87.349.241.5
19. UNIT SERVICE FACTOR O.0% 26.5 % 81.7 %
20. UNIT AVAILABILITY FACTOR O.0 % 26.5 % 82.0 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 23.4 % 76.8 %
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 % 22.8 % 75.2 %
23. UNIT FORCED OUTAGE RATE 100.0 % 73.5 % 3.0%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

Refueling, 09/13/97. 49 days ,

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

07/29/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

OPERATING DATA REPORT

DOCKET NO. 50-301 '.*

I DATE: 07/02/97 '.

! .. COMPLETED BY: M. B. Koodelka i

} TELEPHONE: 414-755 6480 l' OPERATING STATUS i 1. UNIT NAME: POINT BEACH fJUCLEAR PLAtJT - UNIT 2 . NOTES .

j 2. REPORTING PERIOD: June - 1997 . .

I 3. LICENSED THERMAL POWER (MWT): 1518.5 . .

4. NAMEPLATE RATING (GROSS MWE): 523.8 . .

] 5. DESIGN ELECTRICAL HATING INET MVE): 497.0 . .

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MV&l: 485.0 ........... ...... ... ...........

B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE): NA

, 10. REASONS FOR RESTRICTIONS. (IF ANY):

NA

} THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720.0 4.343.0 218.400.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL OO O.O 185.987.6
13. REACTOR RESERVE SHUTDOWN HOURS O.O O.0 233.9 I 14. HOURS GENERATOR ON LINE O.0 0.0 183.508.3
15. UNIT RESERVE SHUTDOWN HOURS O.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWtu O.O O.0 263.605.007.0
17. GROSS ELECTRICAL ENERGY GENERATED O.O O.O 89.603.310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 (10.508.01 85.401.075.5
19. UNIT SERVICE FACTOR O.0% 0.0 % 84.0 %
20. UNIT AVAILABILITY FACTOR O.0% 0.0% 84.2 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% -0.5 % 80.1 %
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% -0.5 % 78.7 %
23. UNIT FORCED OUTAGE RATE O.0% 0.0% 0.9%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

None ,.-

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

07/08/97 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22.1977