JD OPERATING DATA REPORT DOCKET NO. 50-266 O3 DATE: 08/20/98 COMPLETED BY: M. B. Koudelka v
TELEPlIONE:(920) 755-6480 OPERATING STATUS 1.
UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES 2.
REPORTING PERIOD: July - 1998 3.
LICENSED TilERMAL POWER (MWT): 1,518.5 4.
NAMEPLATING RATING (GROSS MWE): 523.8 5.
DESIGN ELECTRICAL RATING (NET MWE): 497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 8.
IF CllANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGli 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WillCH RESTRICTED, IF ANY (NET MW11): NA It' REASONS FOR RESTRICTIONS,(IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE 11.1100RS IN REPORTING PERIOD 744.0 5,087.0 243,119.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1,882.0 196,673.5
- 13. REACTOR RESERVE SilUTDOWN llOURS 0.0 0.0 667.3
- 14. IlOURS GENERATOR ON' INE 744.0 1,817.2 193,344.4
- 15. UNIT RESERVE SHlTTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS TlIERMAL ENERGY GENERATED (MWil)
- 1,065,522.0 2,521,344.0 274,613,397.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 359,890.0 882,140.0 92,869,900.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWil) 353,519.0 832,I43.5 88,513,984.5
- 19. UNIT SERVICE FACTOR 100.0 %
35.7 %
79.5 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
35.7 %
79.9 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.0 %
33.7 %
74.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.6 %
32.9 %
73.3 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
4.8%
- 24. SHtTIDOWNS SCHEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACIORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977