MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
,
. l c Wisconsin 1
' Electnc POWER COMPANY Poht Beoch Nucbor Plant (920) 755-2321 1 6610 Nuclear Rd., Two hers, WI 64241 !
4 NPL 98-0159 March 6,1998 l
Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 ;
Washington, DC 20555 i
Ladies / Gentlemen: l DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS l POINT 13EAC11 NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units I and 2 of the Point Beach Nuclear Plant for the calendar month of February,1998.
Sincerely,
&Sp6 '
Douglas F. Johnson Manager - i Regulatory Services & Licensing l
lad Attachments l l r , \
ec: J. D. Loock, PSCW NRC Regional Administrator, Region Ill g) . :qL
, j l
NRC Resident Inspector / l l
l 9803170393 980220 gDR ADOCK 05000266
_ , .,s,, PDR lllllillililllijlllllll1Olllllllll
.4 subufagofMinvnshiEmxv Omxvatie
00399005 %%%%%
86786504 4861 8 E 45 684 3 4600544 V 4 8,6 5,8 5,3 4,8 8 7 7 I
T 95 2 099 39 9 496 A
L 21 1 5, 4, 1, U 328 M 798 a .
U 2
k le C d 0 u 8 o 4 K 6 B 5 6
6 M.
5 7- S E
05070005.O0030 6401 0203 6 6 83 1 L 2-1 51 90 0 N T 4, 0, 0, 4,$,6 7 7 7 6 7 0 8 9 Y 2 O A 1 1 1 81 7 7 5 /
B 9 S D 41 8 9
. 6 .
A O 4,5 4 1 O 0 D E E
T ,
N
/
E N R 1 2
3 T 0 E O E H 2 T A E L H V E R -
(t E
P P I :
E E G Y
)
H B C T M L ,
C O A O E T M D D C T R A E .
O E T -
P P %%%%%F O E
R 050700003301 20070903
- 0. N E
S T H 7 2 63 1
8807 7980 D S T 3 1, 4, 1, 4433 IO E T
A N 3 5 7 T :
A L O 83 2 31 1 A P D
E R U C M U T R S N S D R E E I I A T T S H D T T O ) T N S E N
7 A F L
H E, O C G A R N T E N U A T O :
D A N 0 R )
E D I
9 H E, D 0 0.T W P D E 1
5 5 3 M Y E T T T S T : 8 S T (
A E I )
4 E S U N E M M U 0. W ): E N( H I T
Q T T E 7ME l f L
)
H )
N S R T
N A
584S 8
9
- SM G WtS N A A C W H
W T
) O M
E D,
S A
1 3 OTN F I
T E T) O T
R L
P 52 E RE
)
I I
,)
- I R R S M(EDM( N NE 6 I D O R 1
5WGN TA DY CU DT E A D C R T R E
E T
A98 : E N X
(
P :
M( E D E P A E
E
) )
9 TE TTTYYY R TA C F SO SAE TRT MD E
N T L R AH RRN A U A
L C
1 WWE CCI T I I I R( I WN UE E E R GG R R
O C U L T
A Ny( MMN(
S G AAP AAC PP A T
SS, DRW ONG N NN I I E
V P E A D
r aR S N E N RO OOO EHEGYE N G G R UUT SSE O R C G
H uE OI CCAC C br WR T I I
R TDI N C TL W YGERY O(
T RRRE AD
(
F S N A eOGA L ELE P T E PAU C O R I
T E F P( RBBI B
N CC I
HR I
GR S ODE E R F H NORN G RA OO E U D TO L
A S : LGL AA R N S E R TN L NT E OF TT CC G D N C R U TD ANADD U WT 3 I O UE AE C YAA AE E A E T N O MT CNN I
C O' TR V T HL CL AI TF F T H T F RU OOER A SAI RAF IL YYOS UC I
P A ORRAR A I
O T I
E E PP C T P D S P: E E P H E RTE E O L R P HS REM TCE BTT DS N N EGT T EC DD S E N W8A E O E E E VR ECIRICAICC L I
G E VF RFORNRE 9 MNDAE MM G O9 D R EGSTE E HL TVI APPAACW L E N S N I
T AI TE L UU N L N I RO E CRE EVAAO O R D1 E T A NR SPNMMA R E O SE T S RSSL C R SSE SACCF D T
U1 ,RO R
E TO NE GI P E MIS XX I
H WA S RB UM A U T OOTITTTTT U nS nE T eH eP P
I NE CAE AA C AOE A OUE ONRRE NNNNNH o I I I I I O URL NDMMFI NPRN I
HNRHUGGNUUUUUSNI J F uR 1 23. 4567. 8 90
. . . . . . . . . . . . . . . . . . A 1 2345678901. 234. 5 T 1 1 1 1 1 1 1 1 1 1 22 2 22 2 A D
1
. it L n a E ET U k 0 VE 8 G hc le d
4 6
A YEN RI L L e 2- 2- 2 2 2 2- 2 2-u - - - -
a e K o 5 5
EA VD E RW 6 B
_ 6 8 9 . 7- A WM 2- t n B O
_ 0 i
o
/
2
/
0 2 P 5 a 3 M 9 Y -
B O E D E N E N
_ M T O
T A E L H Y E N 1 2 3 4 5 6 7 8 9 K E P P A 2 2 2 2 2 2 2 2 2 C T I T M E L
D O N A O E D U D C T L
E ET G VE A YEN L
E RI L L e 5 2 4 6 5 5 9- 1 3- 2 V
E EARW VD E 9
3 9
3 8
3 3 1 1
1 L 8 A WM O
T R 9 9 P N E 1
- A W L
P O R P -
A T Y E I R L
C N A U U U R N Y B E
H L I F C A A D E
B E H Y T A 1 2 3 4 5 6 7 8 9 0 T G 1 1 1 1 1 1 1 1 1 2 N N D I
O A O P
R M E
V A
L E ET _
VE G
A YEN RI L L e 5 1 8 3 5 5 9 7 3 5 EARW VD E 3
4 3
4 2
4 2
4 1
4 5
4 7
3 9
3 0
4 9
3 A WM O
P Y 0 A 1 2 3 4 5 6 7 8 9 1 D -
a
ti w
1 na t .
. d i
n a. W U k i0 r
. c 8 f o
h d 4 c u d a o 6 le e K 5 b.
6 B 8 . 5 e 6 t 9 B 7 lc 2- n '
) s 0 io % f 3
. y 5 P 3 A 9 M mc a i
- tm9 n1 r
t c er u , )
A r cI 1 ae yo e u 6 BN ec e m 1 t
n R gJ 3 0
c oe e sr a
t G
Nma y
e r ul f t
e wev o sa e
osE t
eN Oer neR t dW- w l
p t m s e k d P T uo noeU c citem t
onaoc r a o oihsN t a
r u
- 4. r o i
T DUDCT w u
2 pp t c
u r y(
a r e S e
g a r pt C
a t
a m u i t
npr e ens e m
c e c I aR S a
g n m oaE rt G f dL h
e w I f
u n it it e i b b r de i i S mnr d i
h x
N !) u E ,E O
t n te '
ve r '
I T b
? 't C 8 4
9 rot s
t d
h D 1 I e A E - n nn L
P R Y Un rb R R n R E AU w A m o E W m af d )
R r mrc otu daina L O B_ e p =
/.
1 A aS nh ol C P E N r c ci oS Lp U D J mO Si as t x
N N H O lal au ude t
(er l
i A T u ua mino n n ot ic vuh e C S N a atuor et ned A N 0 m/ A 1
N SAC t P RO E 1 N teis N B W pO - - - - - -
T
) T S 1 234 56 X R :
N I
L T O d o
O U P a ht P l E r e e i R r o f S EN \. '
h e t T_
L cw mp N
e R e E I A
f tu oh i S )
s u r I )m n t
to *n a i a
te t MaRe ** lp g lp t> x n n x ei o e
. (
ee t
s i&
t c (
ig r rT u r n o
'm t r
i r e ia si n m l
v a o a
e C
F ec Rax i eEir v )n a R t nn yT ret a l a lp eagror gt r n x mneliat nt ons oe
_ pt el a i si nita (
mrt s 3 : iuif nugeemehur nir e r n nqa eepcd pt r
a l m 4 5 o sE hRROLAOO - -
i i r 3 mO a - - - - -
e -
I
' RABCDE FG1 1 y 5 T
4 e 1 d
ta C le D d u w ed ce b x
rh FS oc e i N
- o. I nw
'F5 wmi t
)
. 1 e
1* DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 D N,fE ... 03/06/98 COMPLETED BY . M. B. Koudelka
.TEl.EPl!ON!! 920/755-6480 The daily pcwer average for Unit 1 during February,1998, was 189 MWe.
The fhllowing Licensee Event Reports (LERs) were submitted to the NRC during February,1998:
LER 266/98 00'l-00, Missed Surveillances Required by the Section XI Pressure Test Program Constituted an Operation Prohibited by Technical Specifications.
1 LER 266/98-002-00, Failure of the liigh Voltage Station Auxiliary Transformer.
1.ER 266/98-003 00, Containment Accident Fan Motor Cooler IIcat Exchanger Flow Rates Found to be 1 Outside the Design Basis of the Plant.
LER 266/98-004-00. Reactor Caolant Pump Lube Oil Collection System Design Nonconformance with Appendix R Section 111.0.
I ER 266/98-005-00. Missed Technical Specifications Tests for Control Rod Exercise.
LER 266/98-006-00. Unanticipated Partial Service Water System isolation During a Special Test.
! LER 266/98-007-00. Defective Turbine-Drh en Auxiliary Feedwater Pump Low Suction Pressure Trip -
Time Delay Relay.
Safety-related maintenance included: l l
j -1. I B-52-494 power to I B42-494 D-108 station battery charger Train B circuit breaker replaced.
l l
l 2. IC-1 equipment access air lock packing adjusted.
l 3. IC-2 personnel access air lock quad rings replaced.
- 4. .G-04 emergency diesel generator air start solenoid valves replaced and tested.
- 5. P-32 A service water pump accelerometer installed.
- 6. 1 RC-430 T-1 pressurizer power-operated reliefindicator light replaced.
i 7, i Ril-716C llX-11 A&B residual heat removal heat exchanger outlet crossconnect valve handwheel repaired. I
- 8. RS-SA-10 Unit 2 radwaste steam trip valve repaired.
05982 005 %%%%%
. 3 1 3 1 2507 90062 E 3 93 807 01 23 972 V 2327327,48877
. I T 48 5 628 -
28 8 82 4 A 2 1 1 8 7,4, L
U 606 M 698 a 2 k .
U le . . C d 0 u 8 o
K 4 6 -
B 5 0500000533%%%%%
1 5 1 37 0 7 6605 0806 M. - S E 1 0 8 6 5 5 443 25 3 0 N T 4, 5 4 2, 1 6,33336 7 0
8 9 Y 2 O A 1 1 37 7 5 /
B 9 .
S D 842 9
. 6 : A O 2,2 2 1 O 0 D E E T ,
N
/
E N R 3 2 3 T R T 0 E O .
E A
2 E L H V E R K E P ? G I :
E Y
l C T M F L
H B O A O E T, C M D D C T .
R A E O E T P
. P %%%%%F
. E R
T 0500000022588.O 2605 0704 70 8 255 22087 N E
S D
H 65 4 31, 7,77762O E S T I T
A N 039 T L 1 42 A P A
O 72 2 R D E M U C U T R S N S D R E E I S
I H D A T T
T T O ) T N S E N
7 A F L
H E. O C G A R N T E N U A T O :
D A N 0 R )
E , D I
9 H E D 0 0.T W P D E 2 5 53 M Y E T T T S T : 8 S T (
A E I )
4 E S U N E M M U 0. W ): E T
N( H T
I T
Q E
7 Y S 9 ME i _
N R W( H I )
L E _
T N H N 5 8
84 SSM GS A A C W W )
T)
O M D, S
A A ETE T L 1
52 3E):REI OTN FI TI M( EDM N N 6 O D R S P
I
( I R 1 5 T
,)
DT D R E O WGN A DY C U R E A E C T E T R
A98 : E M(YY R E N D ER X
(
P ) )
T A SO TRT E P A E SAE L R E 9T TT T Y C F AH A MD N T U L
C 1
WWE I CCI T I I RRN UE E R GG R
C A U -
MMN( AAC RI( WN E R O L T
N y(
T SS. DRW ONG N NN I I E
V P A aRS S NG AAP PPA OOO E HE A E GYE R SSE r
C O( UUT O D E N N R H uE OI CCA RO T R CTDI I
N GG S L W Y T RRREAD
( _
C b WRT F G
r E E C H TI E GE RY O R _
N A eOGA LLN CC P AU NORN G C O _
I T
EF B P( RBBI I HR I
GRE S H ODE E R RA OO E LU D T A S : LGL AA R N S E R TN E OF TT CC G D N C TD ANADD U WT T R V T HL CL AI TF F AE O UE AEC LNT YAA U E A _
R N S I E T O MT CNNC I OE T H T F P A I
OIRRAR RU R UC A PE E RT PP I
E E O T E EO C T R LR OOE A SAIRAF L I
YYOS D N
S P H P HS REM TCE BTTI EDS N _
E GT T C DDSE E A
- E E O E E VR ECIRICAICC L N W G E VF RFORNRE O D N
I MNDAE L MM UU N G E L S N E R GS TE CRE HL T VIAPPAACW R D E T AI TE L N I RO E E E VAAO O T .
A NR SPNMMA R E O SE T R B C R T SSE S RSSL SACCF D T U R _
R E
TO P E MIS XX N E GI H I WAA S UM A UI OOTITTTTT T eH U nS AEP O
P INE CAE AA C AOE OUE ONRRE NNNNNH o I I I I .
O URL NDMMFI NPRN I
HNRHUGGNUUUUUSNI N R F -
. . . . . . . . . . . . . . . . . . . . . A -
1 23 45678 90 1 . 2345678901 2322222 4. 5 T 1 1 1 1 1 1 1 1 1 1 2 A D
2 t
. i n L a 0 E ET U k 8 G VE
'h l
e 4 YEN A L L e 9 0 c d 6 RI 1 1 1 1 1 1 u
0 0 0 a
e K o 5 E
VDARWE 5 5 0
5 5 9
4 0
5 0
5 8
4 1
0 3
B t
8 9 B 5
7- A WM O
- n 2
/
0 P 0 io /
2
_ 5 P 3 M 9 Y
B O E D E N E N M T O -
_ T A E Y
_ E N L P
H A 1 2 3 4 5 6 7 8 9 K E P 2 2 2 2 2 2 2 2 2 C T I T M E D L
O N A O E -
D U D C T L
E E T G VE L A YEN 2' E RI L L e 0 0
3 0
1 0 0 0
0 8
9 0
0 1
0 4
0 8
V E A RW VD E 5 5 5 5 5 4 5 5 5 9
4 E
L 8 A WM O
T R 9 9 P N E 1 A W L
P O R P -
A T Y E I R L N A C U U U R N Y B H L E I F C A A D E
B E H Y T T A 1 2 3 4 5 6 7 8 9 0 N G N D 1 1 1 1 1 1 1 1 1 2 A
I O O _
P R M E -
V A
L E ET G VE A YEN L L e 4- 4 5 5 5 6 6 1 5 1 RI EARW VD E 1
1 1
1 1
1 8
1 9
4 A WM .
O _
P Y 0 A 1 2 3 4 5 6 7 8 9 1 D -
g wer b
i@ s mno 2 te L
- pt o t
i s n a. m m
U k l
wt v
. e 0 s u 4 h d e e
c k
a o 4 K 5 sw w.
r I
)
N in 9 I
S L 7 I
5 Y
t i M.
xe 0 o 6 1 r mM a
- 5. P 1 M mI 9 e mx hs e r R.
ta c e n 4e 2 ) )
. A r r g s r. 1 yo a n -,u 6 e
n a a
BN m l' J l e )
oe .
d e se R t, te t a T 4 Nma en m e ht ta n
e f G t
eN t
e o h me C nr t d nkca ks e osEt neR e lpp s c k
ck temle imp no e r noeU r onaoe a o T
c d e c s i oihsN ta u o
DUDCt w u
c a ni u
a t
c ra u pt lr y (e S a e d r e C I t e t s r enfie n m m m79 u l aprt aR a S
9 r -
oaE G fdL M1 te J er m
. a s
i t
1 it 4
- b b b S c ma2 e n i
h l u
n x x N w l' E E O ieN .s n ' '
I T ka ms m t
C 8 as e tes T U 9 9 w 2 tws2 n y ODE L
1
- a n mnr n P R Y l' e
pt !
R R n R E A w A U m o E. W R m' r af d mrc otu d ma
)
1 C
O B e p *4 N T
aS nh ael U P_
J E
F 1
m C
r c ct a shS l p x -
N J N l G l Sitat ude (er u lammo l
i a ic i A T n nu>i vu e C
A S N 0
a a uor et t
e.
tnedh E N 1 N
m 'e e d A N
MMAC P RO B W tp C a - - - - - -
O T 5 1 234 56 T
N D R :
I T O _
O L P m
!A P l E e t
e i R v t.
S t N A 'M c t T c w N I mpe N e U t rR
- t _
u _
foh t S )
_ n )
n ru r
c ic m 'n I i a i a
t a + lp g l s e n p R r= x n o x (ei ts i&
t (
e ee ic g r rT u tr n o _
- du sin m r e ixi ae vEi r )n l
i r a
l a o te l
Fe c Ra a i t nn yTrEtaa!p l eagr r n x mn el at pt el a intor oins gt ioe i
s ntar
(
mro : iuif n u ur geemehnir e a s t ? nqa eepcd pt t
a <l t
p o sEMRROLAOO i ni a h
t e - - - - - - - -
i RABCDE FG1 1
'ep 3
F T
5 e t d
)
- t. t i
1 w dedleu ce h rh FS oc k C
a n 4
F -w N : :
1 n
'F5 1 o I'
DOCKET NO. 50 301
, UNIT NAME Point Ileach Unit 2 DATE 03/06/98 COMPl.ETED llY M.' B. Koudelka TEl.EPilONE 920/755-6480 The daily power average fbr Unit 2 during February,1998, was 342 MWe.
The fbilowing Licensee Event Report (LER) was submitted to the NRC during February,1998:
1.ER 301/98-001-00, Steam Generator Vent Mispositioned During Plant Ileatup.
Safety related maintenance included;
- 1. 211-52-394 power to 21142-394 D-107 station battery charger Train A circuit breaker adjusted.
- 2. 2C-1 lower equipment access'. air lock inspected and cam reset.
- 3. 2CV-303C F-39A reactor coolant pump seal injection filter out!et valve adjusted.
- 4. 2MS-244 IlX-ill steam generator MS-2015 dump to at[nosphere inlet valve inspected I and repacked.
- 5. 2P-2A charging pump cage #1, plungers and packing replaced.
- 6. 2VNPSE-3212-0 W-6A&ll U2C purge exhaust fan suction operator slide valve replaced.
- 7. 2-62/NC005 AF-4002 auxiliary feedwater pump mini-recirculat' ion control shut time delay relay setpoint changed.
l l
I l