Wisconsin Electric Power Co.
231 West Michigan Avenue Milwaukee, WI 53201 Point Beach Nuclear Plant, Unit 1 6610 Nuclear Road Two Rivers, WI 54241 l>xket 50-266 Commercial Service Date 12/21n0 UNIT 1 REFUELING 24 INSERVICE INSPECTION
SUMMARY
REPORT 1
FOR FORM NIS-1 1
Written by: MMOs-Date: M N-18 Reviewed by:
A, Date:
/M-ITT Approved by:
Date: n/v 9810200026 981014 ~
'[
PDR ADOCK 05000266-G Page 1 of 22
.. _ _. ~..
. ~.
Wisconsin Electric Power Co.
231 West Michigan Avenue Milwaukee, WI 53201 Point Beach Nuclear Plant, Unit I 6610 Nuclear Road Two Rivers, WI 54241 Docket 50-266 Commercial service Date 12/21n0 Acronyms ASME American Society of Mechanical F";,.neers CR Condition Report j
IDR
. Indication Disposition Report IN Information Notice ISI Inservice Inspection LTP Long Term Plan MT Magnetic Particle Examination NDE Nondestructive Examination 1
NRC Nuclear Regulatory. Commission PBNP Point Beach Nuclear Plant P-G Phillips Getschow i
PT' Liquid Penetrant Examination i
PWA Professional Welding Associates QAS Quality Assurance Section RAYTHEON Raytheon Engineering (Formerly EBASCO Services Incorporated)
RRM Repair / Replacement / Modification RT Radiographic Examination SwRI-Southwest Research Institute UT Ultrasonic Examination VT Visual Examination Page 2 of 22
l Wisconsin Electric Power Co.
231 West Michigan Avenue Milwaukee, WI 53201 Point Beach Nuclear Plant, Unit i 6610 Nuclear Road Two Rivers. WI $4241 Docket 50-266 Commercial Service Date 12/21170 WE Wisconsin Electric Power Company WO Maintenance Work Order l
Page 3 of 22
. =.
.. ~.
l Wisconsin Electric Power Co.
j 231 West Michigm Avenue l
Milwaukee.WI 53201 Point Beach Nuclear Plant, Unit i l
6610 Nuclear Road Two Rivers. WI 54241 l
Docket 50-266 j
Commercial service Date 12/21n0 Table of Contents
1.0 INTRODUCTION
2.0 CODE CASES AND INTERPRETATIONS 3.0 ABSTRACT OF EXAMINATIONS j
3.1 Determination of Scope
)
3.2 Scope of Component / Weld Examinations l
3.3 Completed Component / Weld Examinations 3.4 Pressure Tests 3.5 Snubber Surveillance Test 4.0 ABSTRACT OF CONDITIONS NOTED AND CORRECTIVE MEASURES TAKEN 4.1 Component / Weld 4.2 Pressure Tests 4.3 Snubber Surveillance Tests i
Page 4 of 22
f
~
^
\\
f Wisconsin Electre Power Co.
l 231 West Michigs Avenue Milwaukee. WI 53201 Point Beach Nuclear Plant. Unit 1 i
6610 Nuclear Road l
Two Rivers, WI $4241 i
Docket 50-266 Commercial service Date 12/21/70 l
UNIT 1 REFUELING 24 l
INSERVICE INSPECTION
SUMMARY
1.0 INTRODUCTION
From May 10,1996 to July 14,1998, non-destructive examinations of selected components at PBNP Unit I were performed. These examinations constitute the first examination of the third period, of the third 10-year interval at PBNP Unit 1 The time interval for this examination period included the Unit 1 Refueling 24 outage (U1R24) that ran from February 14,1998 to July 4,1998.
2.0 CODE CASES AND INTERPRETATIONS This report and examinations were completed applying the following:
2.1 ASME Code Interpretation, Section VIII-1-83-17, which allows for computer generated data report forms to be used as long as size, arrangement, and content are identical.
2.2 Code Case N-448 (VT-2 and VT-3 personnel qualifications) 2.3 Code Case N-460 (Class 1 and Class 2 weld examination coverage) 2.4 Code Case N-481 (Alternate examinations for RCP Pump Casings) 2.5 Code Case N-491 (Alternate examinations for Supports) 3.0 ABSTRACT OF EXAMINATIONS 3.1 Delennination of Scote Components and system areas were selected for examination in accordance with the following:
3.1.1 PBNP FSAR, Technical Specification Section 15.4.2.B 3.1.2 Long Term Inservice Examination Plan for Class 1, Class 2, and Class 3 systems at Point Beach Nuclear Plant, Third Interval, Unit 1 i
3.1.3 Augmented Examination Program of Section 4 of the Inservice Inspection Long
(
Term Plan, Third Interval Page 5 of 22
_. _ _ _. ~ _
Wisconsin Electric Power Co.
231 West Michigan Avenue l
Milwaukee, WI 533)1 i
Point Beach Nuclear Plant, Unit 1 i
6610 Nuclear Road Two Rivers, WI 54241 Docket 50 266 l
Conunercial Service Date 12/21/70 3.2 Scope of Component / Weld Examinations Representative samples of the following components and system areas were examined with NDE techniques by P-G, PWA, QAS, RAYTHEON, and SwRI personnel.
l Reactor Pressure Vessel Pressurizer Regenerative Heat Exchanger A Steam Generator B Steam Generator A Reactor Coolant Pump Class 1 Valve Internals Class 1 Pressure Retaining Valve Bolting Class 1 Piping and Supports Class 2 Piping and Supports Class 3 Pipe Supports 3.3 Comoleted Comoonent/ Weld Examinations CODE or HEADING DESCRIPTION Exam Type Defines the requirement or reason for the examination performed.
86E-03 Examination performed as required by ASME Section XI,1986 Edition, No Addenda.
B01-03 Augmented examinations performed on Heavy Load Lifting Devices per ANSI N14.6.
B02-03 Augmented examinations performed for Reactor Coolant Pump Flywheel l
Integrity in accordance with Regulatory Guide 1.14.
Page 6 of 22
...... - -. _.. - _. -.... -. -. ~..,
-. ~.
Wisconsin Electric Power Co.
231 West Michigan Avenue Milwaukee WI 53201 Point Beach Nuclear Plant, Unit 1 6610 Nuclear Road Two Rivers. WI $4241 Docket 50-266 Commercial service Date 12/21n0 B03-03 Augmented examinations performed on Main Steam Bypass Line Energy Absorbers.
B04-03 ' Augmented examinations performed on Threaded Fasteners, per IEB 82-02.
C03-03 Reexamination performed per CR 97-1876.
D02-03 Examination to document removal of support 845E per RRM 98-0001.
'l D03-03 Examination to document removal of support SI-36 per RRM 98-0001.
E01-03. Alternate examinations performed in accordance with Code Case N-481.
P25-03 Preservice examination for RRM 98-0001.
P26-03 Preservice examination for RRM 98-0050.
P27-03 Preservice examination for RRM 98-0039.
P28-03 Preservice examination for RRM 97-0074.
P29-03 Preservice examination for RRM 98-0002.
P30-03 Preservice examination for RRM 98-0029.
P31-03 Preservice examination for RRM 98-0042.
R23-03 Examination after work done to WO 9803857.
R24-03 Examination after work done to WO 9803858.
R25-03 Examination after work done to WO 9710138.
S16-03. Successive Examination for 3H-01 (IDR 9401-7P019).
S17-03 Successive Examination for SI-80 (IDR 9401-7P029).
X03-03 Supplemental examination per IDR 98U1-7P003.
i X04-03 ' Supplemental examination per IDR 98U1-7P004.
l-Page 7 of 22 i
~
.~.
Wisconsin FJectric Power Co.
231 West Michigan Avece MUwaukee, WI 53201 Point Beach Nuclear Plant. Unit i 6610 Nuclear Road Two Rivers. WI 54241 Docket 50-266
)
Comrnercial Service Date 12/21n0 i
X05-03 Supplemental examination per IDR 98Ul-7P005.
X06-03 Supplemental examination per IDR 98U1-7P007.
l l.
X07-03 Supplemental examination per IDR 98U1-7P008.
X08-03 Supplemental examination per IDR 98U1-7P009.
X09-03 Supplemental examination per IDR 98U1-7P010.
X10-03' Supplemental examination per IDR 98U1-7P011.
X11-03 Supplemental examination per IDR 98U1-7P012.
X12-03 Supplemental examination per IDR 98U1-7P013.
X13-03 Supplemental examination per IDR 98U1-7P014.
X14-03 Supplemental examination per IDR 98U1-7P022.
X15-03 Supplemental examination per IDR 98U1-7P023.
X16-03 Supplemental examination per IDR 98U1-7P025.
Ind Type Description of indications.
G
= geometry I
= insignificant or non-relevant indications N
= no indications R
= recordable indications Results Indicates the outcome of a particular exam.
P
= Pass F
= Fail C
= Conditionally Accepted N
= No examination performed Program Indicates whether or not ASME Section XI credit has been taken for the l
Credit exam. Augmented or other examinations not performed for an ASME i
Section XI requirement will be indicated by an N.
Following are database printouts that summarize the ISI examinations that were performed during the Unit 1 Refueling 24 outage.
Page 8 of 22
l.
l Wisconsin Electric Power Co.
l 231 West Michigan Avenue l
Milwaukee, WI 53201 l
Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers, WI 54241 Doc' set 50-266 Commercial Service Date 12/2100 l
I Examinations (See Pages 9-1 through 9-44) t 1
Page 9 of 22
Wisconsin Electric Power Company '
Point Bert Nuclear Plant, Unit l' 4
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201
'Two Rivers, Wisconsin 54241 i
Docket No. 50-266 Conunercial Service Date 12/21/70 '
- COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIFTION TYPE DATE SHEET CREDIT TYP' i
ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
======================================================================================;
24-12-PRA VT-3 P25-03 06/12/98 98UI-754P070 P
N' N
RIGID SUPPORT Fl.10C ISI-PRI-Il50 2.00 0.000
' PRESERVICE EXAMINATION PER RRM 98-0001 (W.O. 9701443).
c 211-02' VT-3 P2943 04/29/98-98UI-754P050 P
N N
SPRING HANGER Fl.20C ISI-PRI-1222 8.00 0.000 EXAMINATION PERFORMED AFTER ADDING FOUR TACK WELDS PER RRM 98-0002 (W.O.9800774).
i 36-22-PSSA VT-3 P26-03 05/14/98 98UI-754P058
.P.
N N
- RIGID SUPPORT Fl.10B ISI-PRI-ll36 2.00 0.000 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805492).
37-16-PSA VT-3 86E-03 02/27/98 98UI-754P008
'P Y
N RIGID SUPPORT F1.10B
. ISI-PRI-l137 2.00 0.000 t
39-18-PRA VT-3 86E-03 02/27/98 98UI-754P007 P
Y N
h RIGID SUPPORT 1
F1.10B ISI-PRI-1139 2.00 0.000 l
I PAGE 9-1 r
e.
- Wisconsin Electric Power Company -
Point Beach Nuclear Plant, Unit 1
. 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENTIDENTIFICATION -
METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDir TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B l
=======================================================m==============================;
3H-01 VT S16-03 03/24/98 98U1-754P021 P-N.
R
[
RIGID SUPPORT l
FI.20A ISI-PRI-1223 10.00 0.000 GROUT IS CRACKED ON WEST SIDE OF THE SUPPORT AND DOES NOT EXIST FOR 7" OF 11-1/2" OF THE EAST SIDE. THE GROUT IS MISSING UNDER THE BASE PLATE FOR AT LEAST l' TO l-1/2" DEEP IN THE SAME LOCATION. SIMILAR CONDITIONS WERE DOCUMENTED IN 1994 DURING U1R21.
t r
3H-04 VT-3 86E-03 03/24/98 98UI-754P020 P
Y N.
SPRING HANGER VT-3 P29-03 05/13/98 98Ul-754P055 P
N N
Fl.20C ISI-l'RI-1222 10.00 0.000 F
754FD53 ONLY EXAMINED WHERE NEW BLOCKS WERE INSTALLED PER RRM 98-0002 (W.O. 9800774).
l t
40-18-PRC VT-3 86E-03 04/07/98 98UI-754P038 P
Y R
RIGID SUPPORT F1.10B ISI-PRI-Il40 2.00 0.000 GAPS NOTED ON BOTH WALL PLATES - 15"/.10".
41-02-PRB VT-3 86E-03 05/19/98 98UI-754P056 P
Y-N-
RIGID SUPPORT F1.10B ISI-PRI-Il41 2.00 0.000 EXAMINED UP TO INSULATION.
42-14-PSSB VT-3 86E-03 03/02/98 98UI-754P0ll P
Y N
RIGID SUPPORT F1.10B ISI-PRI-Il43 2.00 0.000
[
4 f
PAGE 9-2
)
Wisconsin Electric Power Company Point Benh Nuclear Plant, Unit 1-231 West Michigan Avenue - '
6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No,50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM ' IND COMPONENT DESCRIPTION TYPE-DATE SHEET CREDIT
.TYP ITEM -
ISOMETRIC DIA. - THICKNESS RELIEF MATERIAL A & B i
======================================================================================,
-i 43-10-PHB VT-3 86E-03 03/02/98 98UI-754P010 P-Y N
RIGID SUPPORT F1.10B ISI-PRI-I144 2.00 0.000 s
44-05-PR VT-3 86E-03 02/27/98 98UI-754P009 P
Y N
RIGID SUPPORT
[
Fl.10B ISI-PRI-1146 2.00 0.000 4
46-12-PR VT-3 86E-03 02/21/98' 98UI-754P002 P
Y N
RIGID SUPPORT.
VT-3 P25-03 06/12/98 98U1-754P071 P
N N
. 0.000 F1.10B ISI-PRI-I149 2.00 PRESERVICE EXAMINATION PER RRM 98-0001 (W.O. 9701443).
i I
i
_4H-06 VT-3 86E-03 03/24/98 98UI-754P022 P
Y N
f SPRING HANGER t
Fl.20C ISI-PRI-1227 8.00 0.000 l
l i
I 6H-17 VT-3 86E-03 03/27/98 98UI-754P024 P
Y N
I SPRING HANGER Fl.20C ISI-PRI-1232 6.00 0.000
(
i f
PAGE 9 l t
I
~
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue.
6610 Nuclear Road -
Milwaukee, Wisconsin 53201
- Two Rivers, Wisconsin 54241 Docket No. 50-266
' Comnercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP-ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
==_====================_==========_=======================================
845E VT-3 D02-03 06/12/98 98UI-754P076 -
P N
N F1.10B ISI-PRI-1150 2.00 EXAMINATION PERFORMED TO DOCUMENT REMOVAL PER RRM 98-0001 (W.O. 9701443).
i 878A-1 VT-3 P25-03 06/12/98
_ 98U1-754P075 P
N N
F1.10E ISI-PRI-1250 2.00 PRESERVICE EXAMINATION PER RRM 98-0001 (W.O. 9701443).
AC-02 VT-3 86E-03 03/28/98 98UI-754P037 P
Y' N
VARIABLE SPRING F1.20C ISI-PRI-1237 6.00 0.000 AC-06-SI-1001-08 Irr 86E-03 03/02/98 98UI-4MP018 P.
Y N
ELBOW TO PIPE UT 86E-03 03/02/98 98UI-109P026 P
Y N
B9.ll ISI-PRI-1127 6.00 0.562 UT 86E-03 04/22/98 98UI-109P009 P
Y
.N UT 86E-03 03/02/98 98U1-161P004 P-Y N
109P009 FOR WELD PROFILES ONLY.
109P026 FOR LAMINATION SCAN ONLY.
AC-08-RHR-1003-07 PT 86E-03 03/26/98 98UI-451P029 P
Y N
ELBOW TO VALVE RH-710A UT 86E-03 03/26/98 98UI-109P031 P
Y N
C5.11B ISI-PRI-1227 8.00 0.322 UT 86E-03 03/26/98 98U1-161P017 P
Y N
109P031 SCANNED ELBOW SIDE ONLY DUE TO VALVE CONFIGURATION.
161P017 SINGLE-SIDED EXAM DUE TO CONFIGURATION. CODE-REQUIRED COVERAGE OBTAINED.
PAGE 9-4
l
. Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Naclear Road
)
Milwaukee, Wisconsin 53201
. Two Rivers, Wisconsin 54241 '
Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP' ITEM ISOMETRIC DIA.
THICKNESS
. RELIEF MATERIAL A & B
{
==================================================================================== 2 AC-08-RHR-1003-14 PT 86E-03 03/24i98 98UI-451P027 P
Y R
+
' ~ PIPE TO ELBOW UT 86E-03 03/24/98 98U1-109P030 P
Y N
C5.11B ISI-PRI-1227 8.00 0.322 UT 86E-03 G1/22/98 98UI-109P005
.P Y
UT 86E-03 03/24/98 98UI-161P016 P
Y i
109P005 FOR WELD PROFILES ONLY.
109P030 FOR LAMINATION SCAN ONLY.
1 451P027 ONE ROUND INDICATION 3/32" AT THE UPDSTREAM WELD TOE.
AC-08-RHR-1004-03 PT 86E-03 03/24/98 98UI-451P028 '
P Y
R --
03/24/98 98U1-109P029 P
Y N
C3.11B ISI-PRI-1228 8.00 0.322 UT 86E-03 04/22/98 98UI-109P006 P
Y' N
[
UT 86E-03 03/24/98 98UI-161P015 P
Y N
109P029 FOR LAMINATION SCAN ONLY.
109P006 FOR WELD PROFILES ONLY.
451P028 ONE ROUND INDICATION 3/16 ' IN UPSTREAM BASE METAL.
I AC-10-RHR-1006-12 PT 86E-03 03/06/98 98UI-451P020 -
P Y
R TEE TO REDUCER UT 86E-03 03/0798 98UI-161P005 P
Y N
C5.11B ISI-PRI-1224 10.00 0.365 UT 86E-03 03/07/98 98UI-109P013 P
Y N
UT 86E-03 04/22/98 98UI-109P007 P
Y N
109P013 FOR LAMINATION SCAN ONLY.
[
109P007 FOR WELD PROFILES ONLY.
451P020 - 3/16" ROUND INDICATION IN THE BASE METAL.
[
2 I
CVC-02-LD-1001-32A PT 86E-03 04/11/98 98UI-451P033 P
Y N
TEE TO PIPE B9.40 ISI-PRI-Il47 2.00 0.344 l
I f
1 k
l PAGE 5 i
m
i Wisconsin Electric Power Company.
Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue.
6610 Nuclear Road Milwaukee, Wisconsin 53201
.Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM ~
EXAM DATA RESULTS PROGRAM IND.
COMPONENT DESCRIPTION TYPE DATE SHEET
. CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF -
MATERIAL A & B
==========================================================================
I CVC-02-LD-1001-33 PT 86E-03 03/02/98 98UI-451P019 P
Y R
PIPE TO ELBOW
'i B9.40 ISI-PRI-I147 2.00 0.344 3/32" LINEAR INDICATION.
CVC-02-PSI-1001-39 PT 86E-03 02/27/98 98UI-451P0ll P
Y N
PIPE TO ELBOW 89.40 ISI-PRI-1142 2.00 0.344
~!
CVC-02-PSI-1002-04 PT 86E-03 03/02/98 98UI-45iP017 P
Y N
i TEE TO PIPE B9.40 ISI-PRI-I144 2.00 0.344 CVC-02-PSI-1002-21 PT 86E-03 04/24/98 98UI-451P035 P
Y N.
PIPE TO ELBOW B9.40 ISI-PRI-I144 2.00 0.344 9
EA-EB-2-3 VT-3 R23-03 06/15/98 98UI-754P069 P
N N
ENERGY ABSORBER ENERGY ISI-PRI-1405 24.00 0.000 EXAM AFTER WORK PERFORMED TO W.O. 9803857.
t l
PAGE 9-6 i
f
- Wisconsin Electric Power Company Point Benh Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road -
Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 '
Docket No..50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIlrrION TYPE DATE SHEET CREDIT TYP-ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
==============_===========================================================
EA-EB-2-4 VT-3 R24-03 06/15/98 98U1-754P068 P
N N
ENERGY ABSORBER ENERGY.
ISI-PRI-1405 16.00 0.000 EXAM AFTER WORK PERFORMED PER W.O. 9803858.
' EA-EB-2-5 VT-3 BC3-03 03/04/98 98Ul-754P015 P
N
.N ENERGY ABSORBER ENERGY ISI-PRI-1405 16.00 0.000 PIPE CLAMP IS INSULATED.
FW-16-FW-1001-07 MT 86E-03 03/11/98 98UI-350P008 C
Y R
PIPE TO ELBOW UT-86E-03 04/22/98 98U1-109P002 P
Y N
C5.51 ISI-PRI-1244 16.00 0.843 UT X14-03 03/13/98 98UI-164P002 P
N N
Y N
UT 86E-03 03/12/98 98UI-161P013 P
Y N
109P002 FOR WELD PROFILES ONLY.
109P027 FOR LAMINATION SCAN ONLY.
350P008 FIVE LINEAR INDICATIONS.4"/.2"/.4"/.2"/.15" EVALUATED BY UT (164P002) AND DETERMINED TO HAVE NO MEASURABLE THRU-WALL DIMENSION.
FW-16-FW-1001-il MT 86E-03 03/11/98 97UI-350P009 C
Y R
PIPE TO ELBOW UT 86E-03 04/22/98 98U1-109P003 P
Y N
4 C5.51 ISI-PRI-1245 16.00 0.843 UT X15-03 03/13/98 98UI-164P001 P
N N
2 UT 86E-03 03/12/98 98UI-109P028 P
Y N
UT 86E-03 03/12/98 98UI-161P014 P
Y N
109P003 FOR WELD PROFILES ONLY.
109P028 FOR LAMINATION SCAN ONLY.
350P009 THREE ALLOWABLE LINEAR INDICATIONS AND TWO LINEAR INDICATIONS 1.0"/.5" EVALUATED BY UT(164P001) AND DETERMINED TO HAVE NO MEASURABLE TilRU-WALL DIMENSION.
PAGE 9-7
Wisconsin Electric Power Company -
Point Beach Nuclear PITat, Unit I.
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 L
Docket No. 50-266 C9mmercial Service Date 12/21/70 f
COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA.
RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS l
RELIEF MATERIAL A & B l
_=====_==================================================_=========================
H-10 VT-3 86E-03 03/04/98 98UI-754P014 P
Y N
l RIGID SUPPORT F1.20A ISI-PRI-1243 30.00 0.000 INSPECTED UP TO INSULATION.
H-105G VT-3 P26-03 05/26/98 98UI-754P074 P
N N
F1.10B ISI-PRI-1137 2.00 PRESERVICE EXAMINAT10N PER RRM 98-0050 (W.O. 9805500).
H-106G VT-3 P264)3 05/21/98 98UI-754P064 P
N N
F1.10B ISI-PRI-l137 2.00 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805755).
I t
i II-112G VT-3 P26-03 05/21/98 98UI-754P062 P
N N
F1.10A ISI-PRI-1137 2.00 PRESERVICE EXAMINATON PER RRM 98-0050 (W.O. 9805501).
[
11-126 VT-3 86E-03 03/04/98 98Ul-754P012 ~
P Y
N RIGID SUPPORT F1.30B ISI-PRI-1351 20.00 0.000 INSPECTED UP TO INSULATION.
.u----
k P
PAGE 9-8 i
r
I Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit' 1 I
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201
. Two Rivers, Wisconsin 54241:
Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM -
EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS 1
. RELIEF MATERIAL A & B
,i
==============================================-=======================__===============!
. H-133 VT-3 86E-03 03/27/98 98UI-754P027 P
Y R
RIGID SUPPORT F1.30A ISI-PRI-1349 20.00 0.000
.15" GAP ON EAST AND NORTH SIDE OF PLATE.
L EXAMINED UP TO INSULATION.
4 H-200 VT-3 P26-03 05/14/98 98UI-754P057 P
N N
RIGID SUPPORT i
F1.10B ISI-PRI-ll36 3.00 0.000 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 98054%).
i l
H-201 VT-3 P26-03 05/21/98 98UI-754P063 P
N N
F1.10B ISI-PRI-l137
' 2.00 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805502).
f l
H-21A VT-3 86E-03 03/27/98 98U1-754P030 P
Y R
. RIGID SUPPORT i
F1.30B ISI-PRI-1323 6.00 0.000 t
.40" GAP AT SLIDING PLATE - AS BUILT SHOWS.25" WITHOUT TOLERANCE. EXAMINED UP TO INSULATION.
i I
t H-24 VT-3 86E-03 03/27/98 98U1-754P029 P
Y N
[
RIGID SUPPORT f
Fl.30A ISI-PRI-1322 8.00 0.000 EXAMINED UP TO INSULATION.
L I
5 f
i I
h PAGE 9-9 l
I
Wisconsin Electric Power Company.
Point Bersh Nuclear Plant, Unit 1 -
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Sersice Date 12/21/70
- COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND i
COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC
- DIA, THICKNESS RELIEF MATERIAL A & B
======================================================================================;
. H-74 VT-3 86E-03 02/23/98 98UI-754P001 P
Y N
RIGID SUPPORT Fl.30B ISI-PRI-1328 14.00 0.000 H-89 VT-3 86E-03 03/27/98 98UI-754P026 C
Y R
RIGID SUPPORT Fl.30A ISI-PRI-1326 14.00 0.000 ROD SLIGilTLY BOWED AWAY FROM PLATFORM, GOUGES ON ROD WHERE ROD TRAVELS THROUGH CUT-OUT IN STAIRWAY PLATFORM.
EXAMINED UP TO INSULATION.
H-A1004 VT-3 P26-03 05/14/98 98U1-754P060 '
P N
N Fl.10B ISI-PRI-I136 2.00 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805493).
I I
.H-A1005 VT-3 P26-03 05/14/98
' 98UI-754P059 P
N N
Fl.10B ISI-PRI-ll36 2.00 PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805494).
H-A1006 VT-3 P26-03 05/14/98 98UI-754P061 P
N N
l F1.10B ISI-PRI-ll36 2.00 i
PRESERVICE EXAMINATION PER RRM 98-0050 (W.O. 9805495).
i
[
PAGE 9-10
?
Wisconsin Electric Power Company Point Benh Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70
- COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS
' PROGRAM IND COMPONENT DESCRIPTION -
TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA. ' THICKNESS -
RELIEF.
MATERIAL A & B
= = = = = = = = = = = = = = = = = = = = = = - _ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
H100 VT-3 P27-03 N!!9/98 98UI-754PO45 P-N N
RIGID SUPPORT Fl.30B ISI-PRI-1358 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
HI11 VT-3 P27-03 05/07/98 98U1-754P052 P
N N
RIGID SUPPORT F1.30A ISI-PRI-1358 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
Hil2 VT-3 P27-03 04/19/98 98UI-754PO44 P
N N
RIGID SUPPORT F1.30A ISI-PRI-1358 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
Hil9 VT-3 P27-03 N/02/98 98UI-754P039 P
N N
RIGID SUPPORT F1.30A ISI-PRI-1355 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
H120
.VT-3 P27-03 06/01/98 98UI-754P065 P
N N
RIGID SUPPORT F1.30B ISI-PRI-1355 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
PAGE 9-11 c.
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 -
231 West Michigan Avenue 6610 Nuclear Roni Milwaukee, Wisconsin 53201 Two Rivers Wisconsin 5424I.
s Docket No. 50-266 Commercial Service Date 12/2in0 COM% NENTIDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COWONENT DESCRHrrION TYPE DATE SHEET' CREDIT TYP ITEM -
ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=====================_====================================================
H128 VT-3 P27-03 04/19/98 98UI-754PO47 -
P N
N RIGID SUPPORT F1.30B -
ISI-PRI-1355 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
H98 VT-3 P27-03 '
Bt/19/98 98UI-754P046 P
N N
RIGID SUPPORT Fl.30A -
ISI-PRI-1357 8.00 PRESERVICE EXAMINATION PER RRM 98-0039 (W.O. 9713162).
1 HA2 VT-3 P28-03 04/02/98 98UI-754P078 P
N N
b Fl.30B ISI-PRI-1358 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
r HB-2 VT-3 P28-03 06/16/98 98UI-754P072 P
N N
RIGID SUPPORT Fl.30B ISI-PRI-1356 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
HB-3 VT-3 P28-03 06/16/98 98UI-754P073 P
N N
RIGID SUPPORT F1.30A ISI-PRI-1356 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
i l
PAGE 9-12 i
1
. ~.
Wisconsin Electric Power Company Point Beach Nuclear Plant,' Unit 1 231 West Michigan Avenue 6610 Nuclear Road l
Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 I
COMPONENT IDENTIFICATION METHOD EXAM :
EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION
-TYPE DATE SHEET CREDIT TYP i
ITEM ISOMETRIC DIA. : THICKNESS l
RELIEF MATERIAL A & B i
======================================================================================!
HC-IWA VT-3 '
86E-03 03/27/98 98UI-754P025 P
Y N-
[
INTEGRALLY WELDED ATTACHMENT D2.20 ISI-PRI-1320 16.00 0.000 f
HS-08 VT-3 P30-03 06/08/98 98UI-754P080 P
Y-N SNUBBER r
F1.20C '
ISI-PRI-1201 0.00 0.000.
PRESERVICE EXAM PER TO RRM 98-0029 (W.O. 9710137).
i f
HS-13 VT-3 R25-03 04/28/98 98UI-754PO49 P
N N
SNUBBER 1
F1.10C ISI-PRI-Il29 6.00 0.000 EXAMINED AFTER WORK DONE PER W.O. 9710138.
l i
I
~
MS-30-MS-1002-09 MT 86E-03 03/10/98 98UI-350P006 P
Y N
C5,51 ISI-PRI-1262 30.00 0.908 UT 86E-03 04/22/98 98UI-109P001 P
Y N
ELBOW TO PIPE UT 86E-03 03/10/98 98UI-161P009 P
Y N
i UT 86E-03 03/10/98 98UI-109P017 P
Y N
i 109P001 FOR WELD PROFILES ONLY.
l 109P017 FOR LAMINATION SCANS ONLY.
161P009 EXAM PERFORMED FROM ELBOW SIDE ONLY. CODE-REQUIRED COVERAGE OBTAINED.
i i
MS-30-MS-1002-09LD MT 86E-03 03/10/98 98U1-350P007 P
Y N
DOWNSTREAM LONG WELD UT 86E-03 03/10/98 98UI-161P012 P
Y N
C5.52 ISI-PRI-1262 30.00 1.125 UT 86E-03 03/10/98 98UI-109P020 P
Y N
[
4 CC 190P020/161P012 EXAMINED 21/2T OF LONG WELD ONLY.
l PAGE 9-13 i
i
m.
..e s Wisconsin Electric Power Compaay Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road -
Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70
~ COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP
.lTEM ISOMETRIC -
DIA.
THICKNESS l
RELIEF MATERIAL A & B
======================================================================================t MS-30-MS-1002-09LUI MT 86E-03 03/10/98 98UI-350P005 P
Y N
INSIDE UPSTREAM LONG WELD UT 86E-03 03/10/98 98UI-161P010
-P Y
N C5.52 ISI-PRI-1262 30.00 0.908 UT 86E-03 03/10/98 98UI-109P018 P
Y N
CC 109P018/161P010 EXAMINED 21/2T OF LONG WELD ONLY.
l I
MS-30-MS-1002-09LUO MT 86E-03 03/10/98 98U1-350P004 -
P Y-N OUTSIDE UFSTREAM LONG WELD UT 86E-03 03/10/98 98UI-161P0ll P
Y N
C5.52 ISI-PRI-1262 30.00 0.908 UT 86E-03 03/10/98 98UI-109P019 P
Y N
CC i
109P019/161P0ll EXAMINED 21/2T OF LONG WELD ONLY.
[
MS-31-MS-1002-02LD MT.
86E-03 03/09/98 98UI-350P003 P
Y
-N I
86E-03 03/12/98 98UI-161P006 P
Y N
?
C5.52 ISI-PRI-1262 31.00 1.500 UT 86E-03 03/09/98 98UI-109P014 P
Y N
109P014/161P006 EXAMINED 21/2T OF LONG WELD ONLY.
. 7 MS-31-MS-1002-02LUI MT 86E-03 03/09/98 98UI-350P002 P
Y N'
INSIDE UPSTREAM LONG WELD UT 86E-03 03/12/98 98U1-161P007 P
Y N
1 C5.52 ISI-PRI-1262 31.00 1.500 UT 86E-03 03/09/98 98UI-109P015 P
Y N
109P015/161P007 EXAMINED 21/2T OF LONG WELD ONLY.-
l l
MS-31-MS-1002-02LUO MT 86E-03 03/09/98 98UI-350P001 P
Y N
OUTSIDE UPSTREAM LONG WELD UT 86E-03 03/12/98 98UI-161P008 P
Y N
l C5.52 ISI-PRI-1262 31.00 1.500 UT 86E-03 03/09/98 98UI-109P016 P
Y N
l 109P016/161P008 EXAMINED 21/2T OF LONG WELD ONLY.
PAGE 9-14 i
f Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 4
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS
. i-RELIEF MATERIAL A & B 1
==============================================_==========================
PSR-010-3 VT-3 86E-03 03/04/98 98UI-754P013 P
.Y N
RIGID SUPPORT.
F1.30B ISI-PRI-1336 10.00 0.000 INSPECTED UP TO INSULATION.
- j t
PZR-SPRAYNOZ-SE PT 86E-03 04/08/98 98UI-451P032 P
Y N
RT 86E-03 03/07/98 98UI-RT2WE001 P
Y R
[
SAFE-END TO NOZZLE
. 6.00 0.530 B5.40 ISI-PRI-1104 RT IN LIEU OF UT DUE TO CONFIGURATION. DATASHEET RT2WE001 THREE ELONGATED INDICATIONS RECORDED
.15"/.14"/.13".
R-147 VT-3 86E-03 04/02/98 98UI-754P036 P
Y R
I RIGID SUPPORT Fl.20A ISI-PRI-1224 10.00 0.000 GAP DISTANCE ON WALL SIDE SHOWS 4.2" AND GAP DISTANCE ON OPPOSITE SIDE IS 3.9". THE DRAWING SHOWS A GAP DISTANCE OF 4.5" ON WALL SIDE AND 4.0" ON OPPOSITE SIDE.
R-69 VT-3 86E-03 06/08/98 98UI-754P066 P
Y N
RIGID SUPPORT F1.10A ISI-PRI-1133 3.00 0.000 j
R-69A VT-3 86E-03 06/08/98 98UI-754P067 P
Y N
1 RIGID SUPPORT L
F1.10B ISI-PRI-1138 3.00 0.000 I
l PAGE 9-15 l
4 I
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road i'
Milwaukee, Wisconsin 53201
- Two Rivers, Wisconsin 54241 '
. Docket No. 50-266 Commercial Service Date 12/21/70
' COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND f
i COMPONENT DESCRIFTION TYPE DATE SHEET CREDIT TYP v
. ITEM ISOMETRIC DIA.
THICKNESS RELIEF
. MATERIAL A & B
========================================================================--------------t R104B_
VT-3 P28-03 06/17/98 98UI-754P079 P
N N
~
F1.30B ISI-PRI-1356 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 971M52).
R204 VT-3 P28-03 03/28/98 98U1-754P035 P-N N
l RIGID SUPPORT F1.30B ISI-PRI-1359 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 971N52).
?
l R204D VT-3 P28-03 03/28/98 98UI-754P077 P
N N
i F1.30B ISI-PRI-1330 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
R205 VT-3
, P28-03 03/20/98 98UI-754il)l7 P
N N
RIGID SUPPORT F1.30B ISI-PRI-1359 8.00 i'
PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
R206 VT-3 P28-03 03/20/98 98UI-754P016 P
N-N RIGID SUPPORT F1.30B ISI-PRI-1359 8.00 I
. PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
I b
PAGE 16
. i---
.m T-
c--
y Wisconsin Electric Powez Company
- Point Beach Nuclear Phnt, Unit I 231 West Michigan Avenue -
6610 Nuclear Road.
1 Milwaukee,. Wisconsin 53201 Two Rivers, Wisconsin 54241
+
Docket No. 50-266.
I Commercial Service Date 12/21/70
' COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND:
COMPONENT DESCRIPTION
. TYPE-DATE SHEET CREDIT TYP
- ITEM ISOMETRIC DIA.
THICKNESS
- RELIEF MATERIAL A & B
======================================================================================[
r R208 VT-3 P28-03
'03/20/98 98UI-754P018 P
N N
RIGID SUPPORT
-i F1.30B ISI-PRI-1359 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O.' 9710452).
R210 VT-3 P28-03 03/20/98 98Ul-754P019
'P N
N RIGID SUPPORT F1.30B -
ISI-PRI-1360 8.00 PRESERVICE EXAMINATION PER RRM 97-0074 (W.O. 9710452).
R351 VT-3 P29 04/30/98 98UI-754P054 P
N N
F1.20B ISI-PRI-1222 8.00 7
PRESERVICE EXAMINATION PER RRM 98-0002 (W.O. 9800774).
t i
4' R354 VT-3 P29-03 04/30/98 98UI-754P053
-P N
N F1.20B ISI-PRI-1223 8.00
[
i PRESERVICE EXAMINATION PER RRM 98-0002 (W.O. 9800774).
RC-02-BP-1004-14
.PT 86E-03 02/27/98 98UI-451P014 P
Y N
l ELBOW TO PIPE B9.40 ISI-PRI-l137 2.00 0.344 L
6 RC-03-BP-1002-13 PT 86E-03 02/27/98 P8U1-451POIS
.' P Y
R PIPE TO BRANCH CONN r
B9.21 ISI-PRI-1137 3.00 0.438 j
r f
l PAGE 9-17
}
Wisconsin Electric Power Company -
Point Beach Nuclear' Plant, Unit 1 231 West Michigan Avenue '
6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 '
Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA
- RESULTS -
PROGRAM IND
. COMPONENT DESCRIPTION TYPE DATE SHEET-CREDIT TYP ITEM -
ISOMETRIC DIA.
THICKNESS RELIEF -
MATERIAL A & B
==================_===_===========_.==================_====================
RC-03-PS-1001 PT 86E-03 02/21/98 98U1-451P008 P
Y N
i PIPE TO ELBOW
' B9.21 ISI-PRI-1133 3.00 0.438 RC-03-PS-1001-13 PT 86E-03 02/21/98 98U1-451P009 P
Y
~ N ELBOW TO PIPE B9.21 ISI.PRI-l133 3.00 0.438 i
RC-04-PR-1002-09-FB VT-1 86E-03 05/18/98 98UI-750P017 P
Y N
l FLANGE BOLTING B7.50 ISI-PRI-1131 0.00 0.000 EXAMINED EIGHT INLET FLANGE STUDS.
RC-04-SI-1001-33 MEC UT 86E-03 03/11/98 001310 P
Y N
SI SAFE-END TO NOZZLE (AZ. 288.5)
MEC UT 86E-03 03/11/98 001310 P
Y N~
B5.10 ISI-PRI-ll27 4.00 0.438 RR-1-02 FULL VOLUME UT PERFORMED IN LIEU OF PT.
RC-OS-SI-1002-19 MEC UT 86E4)3 03/13/98 001320 P
Y G
SI SAFE-END TO NOZZLE (AZ.108.5)
MEC UT 86E-03 03/13/98 001320 P
Y G
B5.10 ISI-PRI-I129 4.00 0.438 RR-1-02 GEOMETRIC REFLECTORS FROM Tile OUTSIDE SURFACE.
FULL VOLUME UT PERFORMED IN LIEU OF PT.
PAGE 9-18 u-
i;
. Wisconsin Electric Power Company -
Point Beach Nuclear Plant, Unit'l 231 West Michigan Avenue 6610 Nuclear Road -
i U
Milwaukee, Wisconsin 53201 Two Rivers.. Wisconsin 54241 Docket No. 50-266
?
2 Conunercial Service Date 12/21/70 COMPONENT IDENTIFICATION -
METHOD EXAM EXAM EXAM DATA RESULTS -
PROGRAM IND i
COMPONENT DESCRIPTION TYPE DATE SHEET-CREDIT TYP ITEM -
ISOMETRIC DIA.
THICKNESS t
' RELIEF MATERIAL A & B
============_=====-=======================================================
RC-05 VT-3 86E 04/16/98 98UI-754PG41 P
Y I
- SPRING HANGER F1.10C ISI-PRI-ll34 3.00 0.000 MINOR CORROSION NOTED ON SPRINGS, PAINT FLAKING OFF SPRINGS, DEBRIS INSIDE CAN.
i
~
RC-10-AC-1001-07 PT 86E-03 02/26/98 98UI-451P010 P
Y N
PIPE TO ELBOW UT 86E-03 04/22/98-98U1-109P010 P
Y N
B9.ll ISI-PRI-ll22 10.00 1.000 UT 86E 02/28/98 98UI-109P024 P
Y N
i UT 86E-03 02/26/98 98UI-161P002 P
Y N
i 109P010 USED FOR WELD PROFILES ONLY.
109P024 USED FOR LAMINATION SCAN ONLY.
[
4 4
i RC-10-AC-1001-09 PT 86E-03 02/27/98 98UI-451P016 P
Y N
i ELBOW TO PIPE UT 86E-03 02/28/98 98U1-109P025 P
Y N
B9.ll ISI-PRI-ll22 10.00 1.000 UT 86E-03 G4/22/98 98UI-109P008 P
Y N
l UT 86E-03 02/28/98 98UI-161P003 P
Y N
109FD08 USED FOR WELD PROFILES ONLY.
109P025 USED FOR LAMINATION SCAN ONLY.
I i
i J
RC-32-MRCL-Alll-03 MEC UT. 86E-03 03/14/98 001290 P
Y R
ELBOW TO INLET NOZZLE AT 328.5 DEG.
MEC UT X12-03 03/15/98 001290 P
N R'
I B5.130 ISI-PRI-1120 32.00 3.000
(
FOUR INDICATIONS WERE RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3514.
RC-32-MRCL-BIII-03 MEC UT 86E-03 03/13/98 001300 P
Y.
N ELBOW TO INLET NOZZLE AT 148.5 DEG.
B3.130 ISI-PRI-Il21 32.00 3.000 i
PAGE 9-19 I
l 1
a Wisconsin Electric Power Company Point Berrh Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241
. Docket No. 50-266 Commercial Service Date 12/21n0 COMPONENT IDENTIFICATION METIIOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SIIEET CREDIT TYP ITEM ISOMETRIC DIA.
TIIICKNESS RELIEF MATERIAL A & B
_=========================_===============================================
RC-34-MRCL-AI-01 MEC UT 86E-03 03/13/98 001270 P
Y N
OUTLET NOZZLE TO PIPE AT 28.5 DEG.
MEC UT 86E-03 03/13/98 001270 P
Y R
B5.130 ISI-PRI-I120 34.00 3.000 MEC UT X11-03 03/13/98 001270 P
N R
RR-1-17 CS FOUR INDICATIONS WERE RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITli IWB-3512.
FULL VOLUME UT PERFORMED IN LIEU OF PT.
RC-34-MRCL-BI-01 MEC UT 86E-03 03/13/98 001280 P
Y N
OUTLET NOZZLE TO PIPE AT 208.5 DEG.
MEC UT 86E-03 03/13/98 001280 P
Y N
B3.130 ISI-PRI-1121 34.00 3.000 RR-1-17 CS FULL VOLUME UT PERFORMED IN LIEU OF PT.
RC-36-MRCL-BII-01 l'T 86E-03 03/20/98 98UI-451P026 P
Y R
B S/G OUTLET NOZZLE TO ELBOW UT 86E-03 03/23/98 98UI-109P034 P
Y N
B5.130 ISI-PRI-ll21 36.00 3.000 UT 86E-03 03/23/98 98UI-167P002 P
N G
451P026 ONE ROUND INDICATION.2".
109P034 EXAMINATION PERFORMED ON TIIE NOZZLE AND ELBOW SIDE ONLY.
167P002 EXAMINATION PERFORMED FROM TIIE WELD CROWN AND ELBOW SIDE ONLY.
COVERAGE OBTAINED = 13.8%
03/20/98 98UI-451P025 P
Y R
ELBOW TO PIPE UT 86E-03 03/23/98 98UI-109P033 P
Y N
B9.11 ISI-PRI-il21 36.00 3.000 UT 86E-03 03/23/98 98UI-161P021 P
N G
UT 86E-03 03/23/98 98UI-167P001 P
N G
451P025 TIIREE ROUND INDICATIONS 1/16" EACII.
161P021 EXAMINATION PERFORMED FROM TIIE PIPE SIDE ONLY.167P001 EXAMINATION PERFORMED FROM Tile ELBOW SIDE ONLY.
161P021/167P001 GEOMETRIC REFLECTORS FROM Tile WELD ROOT.
COVERAGE OBTAINED = 79.4%.
PAGE 9-20
_ _. _ _ =. _ -
= - - -. _.
Wisconsin Electric Power Company Point Betrh Nuclear Plant, Unit 1 231 West Michigan Avenue '
6610 Nuclear Road Milwaukee, Wisconsin 53201..
Two Rivers, Wisconsin 54241 Docket No. 50-266
- Commercial Service Date 12/21/70 E
I COMPONENTIDENTIFICATION METHOD EXAM EXAM' EXAM DATA RESULTS PROGRAM ' IND COMPONENT DESCRIPTION TYPE DATE SHEET-CREDIT
-TYP
. ITEM
-. ISOMETRIC '
DIA.
THICKNESS l
RELIEF MATERIAL A & B
=========================,================================================
RCP-A-BLT4)3 UT 86E-03 04/18/98-98U1-169P001 P
Y N
. PUMP BOLTING UT 86E-03 G4/18/98 98UI-169P009
.P' Y
N B6.180
- ISI-PRI-I110 3.50 30.562 i
t RCP-A-BLT-03-NUT VT-1 86E-03 04/18/98 98UI-750P006 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISa-PI. i-i l l0 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
6 i
RCP-A-BLT-06 UT 86E-03 04/18/98 98UI-169P002 P
Y N
PUMP BOLTING UT 86E-03 04/18/98 98UI-169P010 P
Y N
B6.180 ISI-PRI-1110 3.50 30.562 i
l' RCP-A-BLT-06-NUT VT-1 86E-03 04/18/98 98UI-750P007 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI-I110 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
i t
RCP-A-BLT-09 UT 86E-03 04/18/98 98UI-169P003 P
Y N
PUMP BOLTING UT 86E-03 04/18/98 98UI-169P011 P
Y N'
B6.180 ISI-PRI-1110 3.50 30.562
[
PAGE 9-21 t
\\
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit I-231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION
. METHOD EXAM EXAM EXAM DATA
.RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA. - THICKNESS RELIEF MATERIAL A & B
==========================================__===============================
RCP-A-BLT-09-NUT VT-1 86E-03 04/18/98 98UI-750P008 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI-II10 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
RCP-A-BLT-12 UT 86E-03 04/18/98 98UI-169P003 P
Y N
PUMP BOLTING UT 86E-03 04/18/98 98U1-169P012 P
Y N
B6.180 ISI-PRI-il10 3.50 30.562 RCP-A-BLT-12-NUT VT-1 86E-03 04/18/98 98UI-750P009 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI-1110 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
RCP-A-BLT-15 UT 86E-03 04/18/98 98U1-169P005 P
Y N-PUMP BOLTING UT 86E-03 04/18/98 98UI-169P013 P
Y
-N B6.180 ISI-PRI-Ii10 3.50 30.562 I
RCP-A-BLT-15-NUT VT-1 86E-03 04/18/98 98UI-750P010 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI-II10 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
PAGE 9-22
~
,D
a
. Wisconsin Electric Power Company -
Point Berth Nuclear Plant, Unit 1 231 West Michigan Avenue
' 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Conunercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRII7 TION TYPE-DATE SHEET CREDIT TYP
- ITEM ISOMETRIC DIA.
THICKNESS RELTEF '
MATERIAL A & B
= = = = = = = = = = = = = = = = = = = = = = - = = = = = = = = = = = = = = = = = = = _ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
RCP-A-BLT-18 UT 86E-03 04/I8/98 98U1-169P006 P
Y' N
PUMP BOLTING UT 86E-03 04/18/98 98UI-169P014 P
Y N
, B6.180 ISI-PRI-I110 3.50 30.562 RCP-A-BLT-18-NUT VT-1 86E-03 04/18/98 98UI-750P0ll P
Y N
NUTS BUSHINGS AND WASHERS
/
B6.200 ISI-PRI-I110 3.50 30.562 EXAMINED IN PLACE. UNDER TENSION.
RCP-A-BLT-21 UT 86E-03 04/18/98 98UI-169P007 P
Y N
PUMP BOLTING UT 86E-03 04/18/98 98UI-169P015 P
Y N
. B6. I80 ISI-PRI-1110 3.50 30.562 RCP-A-BLT-21-NUT VT-1 86E-03 04/18/98 98UI-750P012 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI 1110 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
RCP-A-BLT-24 UT 86E-03 04/18/98 98UI-169P008 P
Y N
PUMP BOLTING UT 86E4)3 04/18/98 98UI-169P016 P
Y N
B6.I80 ISI-PRI-I110 3.50 30.562 PAGE 9-23 l
=
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue
. 6610 Nuclear Road Milwaukee, Wiscornt 53201
'Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21n0 COMPONENT IDENTIFICATION METHOD EXAM ~
EXAM.
EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT.
TYP J
ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B t
===============================================.=======================================;
RCP-A-BLT-24-NUT VT-1 86E-03 04/18/98 98UI-750P013 P
Y N
NUTS BUSHINGS AND WASHERS B6.200 ISI-PRI-I110 3.50 30.562 EXAMINED IN PLACE, UNDER TENSION.
RCP-A-FLYWHEEL UT B02-03 04/20/98 98UI-IIP 001 P
N N
PUMP FLYWHEEL VT-1 B02-03 04/20/98 98UI-750P014 P
'N N
FLYWHL ISI-PRI-1404 0.00 0.000 1IP001 TOP PLATE SECTION 100% COVERAGE OBTAINED. LOWER PLATE SECTION 84% COVERAGE OBTAINED.
i RCP-A-FLYWHEEL-BORE PT B02-03 N/20/98 98UI-450F002 P
N N
PUMP FLYWHEEL VT-1 B02-03 M/20/98 98UI-750P016 P
N N
BORE ISI-PRI-14M 0.00 0.000 i
l RCP-A-FLYWHEEL-KEYWAY VT-1 B02-03 04/20/98 98UI-750P015 P
N R
PUMP FLYWHEEL PT B02-03 04/20/98 98UI-450P001 P
N R
KEYWAY ISI-PRI-1404 0.00 0.000 PT X16-03 04/23/98 98UI-450P003 P
N N
450P00ln50P015 TWO LINEAR INDICATIONS.5"/10".
450P003 EXAMINED AREAS OF INDICATIONS RECORDED ON 450P00ln50P015 AFTER SURFACE CONDITIONING AND FOUND NO RECORDABLE INDICATIONS.
RCP-A-LEG-3 VT-3 86E-03 02/27/98
. 98UI-754P005 P
Y
.N COMPONENT SUPPORT F1.40 ISI-PRI-I108 0.00 0.000 INSPECTED UP TO INSULATION.
t PAGE 9-24
)
Wisconsin Electric Power Corapany Point Beach Nuclear Plant, Unit i 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wiscomin 54241 Docket No. 50-266 Commercial Service Date 12/21/70.
~ COMPONENT IDENTIFICATION METHOD EXAM EXAM
- EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
= = = = = = = = = = = = = = = = = = = = _ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
RCP-A-SLBLT-01 THRU 18 MT B04-03 04/08/98 98UI-352P002 P
N N
RCP #1 SEAL BOLTING VT-1 B04-03 M/09/98 98UI-750P002 P
N N
B7.69 ISI-PRI-Il10 0.00 0.000 MT' BM-03 04/08/98 98UI-351P004 P
N N
BOLTS NOT 100% EXAMINED WHERE BOLT ENDS CONTACTED HEAD AND TAIL STOCK.
RH-700-BLT MT BO4-03 04/14/98 98U1-351P006 P-N N
VALVE BOLTING 10-IN GATE MT B04-03 04/14/98 98U1-352P004 P
N N
B7.70 ISI-PRI-ll22 '
'O.00 0.000 VT-1 86E-C3 04/14/98 98UI-750PON P
Y N
352P004 BOLTS NOT 100% EXAMINED IN AREAS OF THE HEAD AND TAIL STOCK.
RH-700-INT (Il663)
VT-3 86E-03 04/20/98 98Ul-754PO48 P
Y N
10-IN DARLING GATE VALVE (INTERNALS)
B12.50 ISI-PRI-l122 10.00 0.000 RH-701-BLT MT B04-03 04/14/98 98UI-351P007 P
N N
VALVE BOLTING 10-IN GATE MT B04-03 04/14/98 98U1-352P005 P
N N
B7.70 ISI-PRI-1122 0.00 0.000 VT-1 86E-03 04/14/98 98UI-750P005 '
P Y
N C
352P005 BOLTS NOT 100% EXAMINED IN CONTACT AREAS OF THE IIEAD AND TAIL STOCK.
RH-701-INT (88904-1)
VT-3 86E-03 04/13/98 98UI-754P043 P
Y N
10-IN VELAN GATE VALVE (INTERNALS)
B12.50 ISI-PRI-ll22 10.00 0.000 PAGE 9-25
~
~s m _.
..v,,
W Wisconsin Electric Power Company.
Point Beach Nuclear Plant, Unit 1 7l 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Doctet No. 50-266 Commercial Service Date 12/21/70
-i COMPONENT IDENTIFICATION '
METHOD EXAM '
EXAM EXAM DATA RESULTS PROGRAM : IND COMPONENT DESCRIPTION TYPE DATE SHEET
- CREDIT TYP*
. ITEM.
ISOMETRIC DIA THICKNESS RELIEF MATERIAL A & B
=========================================================================
RH-701-WLD(88904-1)
. 98UI-161P019 P
Y-N 10-iN VELAN GATE VALVE (BODY WELDS)
UT 86E-03 04/18/98' 98UI-109P012 P.
Y N
' B12.40 ISI-PRI-I122 -
10.00 0.000 l
161P019 SINGLE-SIDED EXAM DUE TO VALVE / EXTENSION PIECE CONFIGURATION. CODE-REQUIRED COVERAGE OBTAINED FROM EXTENSION SIDE.
RH-720-BLT MT B04-03 04/04/98
,98U1-352P001 P
'N~
R VALVE BOLTING 10-IN GATE VT-1 86E-03 04/04/98 98U1-750P003 P
Y N
J B7.70 ISI-PRI-1124 0.00 0.000 MT P31-03 04/08/93 98UI-351P008 P
-N N
MT P31-03 04/08/98 98UI-352P006 P
N N-MT EG4-03 04/04/98 98UI-351P003 P
N N-352P001 ONE BOLT LINEAR INDICATION INTERMITTENT 100% OF THE LENGTH OF BOLT. INDICATION WAS ALLOWABLE, BUT BOLT WAS REPLACED PER RRM 98-0042 (W.O. 9700847).
BOLTS NOT 100% EXAMINED IN CONTACT AREAS OF THE HEAD AND TAIL STOCK.
351P008/352P006 EXAMINATION PERFORMED PER RRM 98-0042 (W.O. 9700847).
i a
RHE-N1 UT 86E-03 03/25/98 003600 P
.Y.
G INLET NOZZLE TO SIIELL B3.150 ISI-PRI-l107
- 0.00 0.000 RR-1-12 GEOMETRIC REFLECTOR FROM THE INSIDE CORNER REGION.
LIMITED PARALLEL EXAM DUE TO CLAMP ON SHELL SIDE.
COVERAGE OBTAINED = 93%.
1 RHE-N1-IRS UT 86E-03 03/25/98 003700 P
N
.N~
RHE NOZZLE INNER RADIUS SECTION B3.160 ISI-PRI-1107 0.00 RR-1-12 EXAMINATION LIMITED TO 45-145 AND 225-315 AZIMUTH AREAS DUE TO NOZZLE CONFIGURATION.
COVERAGE OBTAINED = 50%.
PAGE 9-26.
Wisconsin Electric Power Company
' Point Betch Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 i-Conunercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIMlON TYPE.
DATE SHEET CREDIT TYP.
ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
==========================================_==========__====================
RHE-N4 UT.
86E-03 03/25/98 003710 P
-Y G
SHELL TO OUTLET NOZZLE B3.150 ISI-PRI-1107 0.00 0.000
' ' RR-1-12 GEOMETRIC REFLECTOR FROM THE INSIDE CORNER REGION.
LIMITED PARALLEL EXAMINATION DUE TO PERMANENT CLAMP ON SHELL SIDE.
COVERAGE OBTAINED = 93%.
1 RHE-N4-IRS UT 86E-03 03/25/98 003710 P
N N
RHE NOZZLE INNER RADIUS SECTION B3.160 ISI-PRI-l107 0.00 RR-1-12 EXAMINATION LIMITED TO 45-135 AND 225-315 AZIMUTH DUE TO NOZZLE CONFIGURATION.
COVERAGE OBTAINED = 50%.
RPV-14-683-A MEC UT 86E-03 03/11/98 001060 P
Y R
SHELL TO FLANGE (AZ. 0-180)
MEC UT X05-03 03/14/98 001060 P
N R
Bl.30 ISI-PRI-1101 132.00 6.500 RR-1-18
" - EXAMINATION FROM THE SEAL SURFACE PERFMED DURING THE 1993 ISI. TWO INDICATIONS WERE RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3510. aAM LIMITED DUE TO INSIDE SURFACE TAPER.
COVERAGE OBTAINED = 60% INCLUDING SEAL SURFACE EXAM.
RPV-14-683-B MEC UT 86E-03 03/11/98 001070 P
Y N
SHELL TO FLANGE (AZ. 180-360)
B1.30 ISI-PRI-1101 132.00 6.500 RR-1-18 EXAMINATION PERFORMED FROM SEAL SURFACE DURING 1993 ISI. EXAM LIMITED DUE TO INSIDE SURFACE TAPER.
COVERAGE OBTAINED = 60% INCLUDING THE SEAL SURFACE EXAMINATION.
PAGE 9-27
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METH D EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM '
ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=====================_=======================_============================
RPV-15-683 MEC UT 86E-03 03/10/98 001000 P
Y G
UPPER SHELL TO MIDDLE SHELL Bl.Il ISI-PRI-Il01 132.00 6.500 RR-1-18 GEOMETRIC REFLECTORS FROM VESSEL SUPPORT LUGS AT 90 & 270 DEG.
RPV-16-683 MEC UT 86E-03 03/10/98 001010 P.
Y-R MIDDLE SHELL TO LOWER SHELL MEC UT X034)3 03/14/98 001010 P
N R
Bl.ll ISI-PRI-1101 132.00 6.500 RR-1-18 THREE INDICATIONS RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3510.
RPV-17-683 MEC UT 86E-03 03/11/98 001020 P
N R
LOWER SIIELL TO LOWER HEAD RING MEC UT XG4-03 03/15/98 001020 P
N R
B1.21 ISI-PRI-I101 132.00 6.500 RR-1-18 FOUR INDICATIONS WERE RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3510.
EXAM LIMITED DUE TO PROXIMITY OF CORE SUPPORT LUGS.
COVERAGE OBTAINED = 77%.
RPV-18-683 MEC UT 86E-03 03/13/98 001030 P
Y N
LOWER HEAD RING TO LOWER HEAD Bl.21 ISI-PRI-Il01 132.00 4.125 RR-1-18 PAGE 9-28
~
Wisconsin Electric Power Company
~ Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue '
6610 Nuclear Road -
Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21n0 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND -
' COMPONENT DESCRIPTION
-TYPE DATE SHEET CREDIT
-TYP ITEM ISOMETRIC
- DIA.-
THICKNESS RELIEF..
MATERIAL A & B
_.=============================_=========_.================================
' 03/13/98 001080 P
N N
OUTLET NOZZLE AT 28.5 DEG.
MEC UT 86E-03 03/13/98 001080 P'
.N R
- B3.90 -
ISI-PRI-I101 34.00 0.000 MEC UT XO7-03 '
03/16/98 001080 P
N' R'
RR-1-18 FOUR INDICATIONS WERE RECORDED, SIZED AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3512.
SIX ADDITIONAL INDICATIONS WERE RECORDED AND FOUND TO HAVE NO MEASURABLE THRU-WALL DIMENSION OR LENGTH.
TRANSVERSE AND LAMINATION EXAMINATIONS LIMITED DUE TO THE INTEGRAL EXTENSION. COVERAGE OBTAINED = 67%.
RPV-2-686-A-IRS MEC UT 86E-03 03/12/98 001155 P
Y N
OUTLET NOZZLE AT 28.5 DEG.
B3.100 ISI-PRI-I101 34.00 0.000 RPV-2-686-B MEC UT 86E-03 03/13/98 001100-P Y
N INLET NOZZLE AT 148.5 DEG.
MEC UT 86E-03 03/13/98 001100 P.
Y N
B3.90 ISI-PRI-l101 -
34.00 RR-1-18 RPV-2-686-B-IRS MEC UT 86E-03 03/12/98 001160 P
Y N
INLET NOZZLE AT 148.5 DEG.
B3.100 ISI-PRI-Il01 32.00 0.000 I
6 PAGE 9-29 a
~_
i Wisconsin Electric Power Company Poim Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201
- Two Rivers, Wisconsin 54241 Docket No 50-266-Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM
. EXAM DATA RESULTS '
PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
-========_====================================================_===================
RPV-2-686-C MEC UT 86E-03 03/09/98 001090 P-N N
OUTLET NOZZLE AT 208.5 DEG.
MEC UT 86E-03 03/09/98 001090 P
N R
- B3.90 ISI-PRI-I101 34.00 0.000 MEC UT X06-03 03/15/98 001090 -
P N
R RR-1-18 THREE INDICATIONS WERE RECORDED SIZED, AND FOUND TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3512.
THREE ADDITIONALINDICATIONS WERE RECORDED AND FOUND TO HAVE NO MEASURABLE THRU-WALL DIMENSION OR LENGTil TRANSVERSE AND LAMINATION EXAMINATIONS LIMITED DUE TO THE INTEGRAL EXTENSION.
I COVERAGE OBTAINED = 67%.
RPV-2-686-C-IRS MEC UT 86E-03 03/12/98
.001165 P
-Y N
OUTLET NOZZLE AT 208.5 DEG.
B3.100 ISI-PRI-Il01 34.00 0.000 RPV-2-686-D MEC UT 86E-03 03/12/98 001110 P
Y N
INLET NOZZLE AT 328.5 DEG.
MEC UT 86E-03 03/12/98 001110 P
Y R
B3.90 ISI-PRI-I101 34.00 0.000 MEC UT X08-03 03/15/98 001110 P
N R
RR-1-18 THREE INDICATIONS RECORDED, SIZED AND DETERMINED TO BE ALLOWABLE IN ACCORDANCE WITH IWB-3512.
TWO ADDITIONAL INDICATIONS WERE RECORDED AND FOUND TO HAVE NO MEASUREABLE THRU-WALL DIMENSION OR LENGTH.
4 i
l RPV-2-686-D-IRS MEC UT 86E-03 03/12/98 001170 P
Y N
INLET NOZZLE AT 328.5 DEG.
B3.100 ISI-PRI-l101 32.00 0.000 t
f I
t i
PAGE 9-30 l
i
~
Wiscon2in Electric Power Company.
. Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue.
6610 Nuclear Road Milwaukee, Wisconsin 53201
. Two Rivers, Wisconsin 54241 i
Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM
. EXAM'
. EXAM DATA.
RESULTS-
- PROGRAM IND
[
COMPONENT DESCRIPTION -
TYPE DATE SHEET CREDIT-
'TYP ITEM.
- ISOMETRIC DIA.
THICKNESS i
RELIEF MATERIAL A & B i
= = = = = = = = = =, = = = = = = = = = = = = = = = = = = = = = = = _ = = = = = = = -. = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =. _ = = =
RPV-687-01-A MEC UT 86E-03 03/13/98 001120
.P-N N
SI NOZZLE AT 288.5 DEG.
MEC UT 86E-03 03!!3/98-001120 P
N R_
- B3.90 ISI-PRI-I101 4.00 0.000 MEC UT XO943 03/13/98
~001120 P
N R-RR-1-18 ONE INDICATION WAS RECORDED, SIZED AND DETERMINED TO HAVE NO MEASURABLE THRU-WALL DIMENSION OR LENGTH.
TRANSVERSE AND LAMINATION EXAMINATIONS LIMITED DUE TO THE INTEGRAL EXTENSION.
COVERAGE OBTAINED = 59%.
-l RPV-687-01-A-IRS MEC UT 86E-03 03/11/98 001180 P
Y-N SI NOZZLE AT 288.5 DEG.
B3.100 ISI-PRI-1101 4.00 0.000
03/13/98 001130 P
N N
St NOZZLE AT 108.5 DEG.
MEC UT 86E-03 03/13/98 001130 P
N-
.R
. - B3.90 ISI-PRI-Il01 4.00 MEC UT X10-03 03/13/98 001130 P
'N R
2 RR-1-18 4
ONE INDICATION RECORDED, SIZED AND DETERMINED TO HAVE NO MEASURABLE THRU-WALL DIMENSION.
~ TRANSVERSE AND LAMINATION EXAMINATIONS LIMITED DUE TO THE INTEGRAL EXTENSION.
~!
COVERAGE OBTAINED = 59%.
,7 I"
RPV-687-01-B-IRS MEC UT 86E-03 03/11/98 001190 P
Y N.
SI NOZZLE A r 108.5 DEG.
t B3.100 ISI-PRI-1101 4.00 0.000 r
l l
i RPV-CORE SUPPORT VT-3 86E-03 03/11/98 100700 P
Y N
CORE SUPPORT STRUCTURE 6
B13.70 ISI-PRI-I101 0.00 0.000 PAGE 9-31.
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266
-[
Commercial Service Date 12/21/70 -
f COMPONFNT IDENTIFICATION METHOD ' EXAM EXAM EXAM DATA RESULTS -
PROGRAM - IND U
COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP
' ITEM '
ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B j
==========================================================================
l RPV-FLIG-33 UT 86E-03 02/24/98 98UI-165P001 P
Y
'N FLANGE LIGAMENT-B6.40 ISI-PRI-I103 0.00 0.000
[
RPV-FLIG-34 UT 86E-03 02/24/98 98UI-165P002 P
Y N
5 FLANGE LIGAMENT B6.40 ISI-PRI-I103 0.00 0.000 i
RPV-FLIG-35 UT 86E-03 02/24/98 98UI-165P003 P
Y
~ N FLANGE LIGAMENT B6.40 ISI-PRI-1103 0.00 0.000 RPV-FLIG-36 UT 86E-03 02/24/98 98UI-165P004 P
Y N
FLANGE LIGAMENT t
[
B6.40 ISI-PRI-I103 0.00 0.000 i
t RPV-FLIG-37 UT 86E-03 02/24/98 98UI-165P005 P
Y N
i FLANGE LIGAMENT i
B6.40 ISI-PRI-I103 0.00 0.000 RPV-FLIG-38 UT 86E-03 02/24/98 98UI-165P006
-P Y
N.
FLANGE LIGAMENT B6.40 ISI-PRI-l103 0.00 0.000 r
i PAGE 9-32 b
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION -
METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND..
COMPONENT DESCRIPTION
. TYPE DATE SilEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
======._====================================_=========__==============_=================.
- RPV-FLIG-39 UT-86E-03 02/24/98 98U1-165P007 P
Y N
FLANGE LIGAMENT B6.40 ISI-PRI-l103 0.00 0.000 RPV-FLIG-40 UT 86E-03 02/24/98 98UI-165P008 P
Y N
FLANGE LIGAMENT B6.40 ISI-PRI-1103 0.00 0.000 RPV-FLIG-41 UT 86E-03 02/24/98 98UI-165P009 P
Y N
FLANGE LIGAMENT B6.40 ISI-PRI-I103 0.00 0.000 RPV-FLIG-42 UT 86E-03 02/24/98 98UI-165P010 P
Y N
FLANGE LIGAMENT B6.40 ISI-PRI-l103 0.00 0.000 RPV-FLIG-43 UT 86E-03 02/24/98 98UI-165P0ll P
Y-N FLANGE LIGAMENT B6.40 ISI-PRI-I103 0.00 0.000 RPV-FLIG-44 UT 86E-03 02/24/98 98UI-165P012 P
Y N
FLANGE LIGAMENT B6.40 ISI-PRI-l103 0.00 0.000 PAGE 9-33
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231_ West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241_
Docket No. 50-266 Commercial Service Date 12/21n0 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA -
RESULTS; PROGRAM.IND COMPONENT DESCRIPTION TYPE DATE SHEET
. CREDIT TYP ~
ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=====_====_._====================================_=====================================,
RPV-FLIG-45 UT 86E-03 02/24/98 98UI-165P013 P
Y-
'N l
FLANGE LIGAMENT i
B6.40 ISI-PRI-l103 0.00 - 0.000 RPV-FLIG-46 UT 86E-03
~ 02/24/98 98UI-165P014 P
Y.
N FLANGE LIGAMENT B6.40 ISI-PRI-l103 0.00 0.000 RPV-FLIG-47 UT.
36E-03 02/24/98 98UI-165P015 P
Y-N FLANGE LIGAMENT B6.40 ISI-PRI-I103 0.00 0.000 s
4 RPV-FLIG-48 UT 86E-03 02/24/98 98UI-165 POI 6'
' P Y'
.N FLANGE LIGAMENT B6.40 ISI-PRI-1103 0.00 0.000 RPV-HFLANGE-A UT C03-03 05/29/98 98UI-12P001 P
N-N HEAD TO FLANGE (AZ. 0-120)
B1.40 ISI-PRI-l102 157.25 5.750 i
RE-EXAMINATION REQUIRED IN ACCORDANCE WITH CR 97-1876.
EXAMINATION LIMITED DUE TO CONFIGURATION AND LIFTING LUGS.
COVERAGE OBTAINED = 85.89%.
4
-r 7
e PAGE 9 l x,
- ~
+-~.-n--
vs
."mm
--m~
+
w
-+
rn-a w
,'-m
~-. n e-ew a
w
<- ~ -
_wa-___--_.-___--,w__-,-
d Wisconsin Electric Power Company.
Point Beach Nuclear Plant, Unit 1 4
231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Senice Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF -
MATERIAL A & B
= = = = = = = = = = = = = = = _ = = = = = = = = = = = = = - = = = = _ = = = = = = = = = = = = = = = = = = = _ = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
RPV-HFLANGE-B UT C03-03.
05/29/98 98UI-12P001 P
N N
HEAD TO FLANGE (AZ.120-2AO)
B1.40 ISI-PRI-I102 157.25 5.750 CC RE-EXAMINATION REQUIRED IN ACCORDANCE WITH CR 97-1876.
EXAMINATION LIMITED DUE TO LIFTING LUGS AND WELD CONFIGURATION.
i COVERAGE OBTAINED = 85.89%.
RPV-ILR-01 PT B01-03
'03/17/98 98UI-451P023 P
N
~ N
-I LEG ASSY TO ADAPTER WELD RPVINT ISI-PRI-1402 0.00 - 0.000 i
ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0441.
i RPV-ILR-02 PT B01-03 03/17/98 98UI-451P021 P
N N
LEG ASSY TO ADAPTER WELD 1
RPVINT ISI-PRI-1402 0.00 0.000 1
ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0441.
k RPV-ILR-05 PT B01-03 03/17/98 98UI-451P024
-P N
N LEG ASSY TO ADAPTER WELD RPVINT ISI-PRI-1402 0.00 0.000 l
ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
t I
RPV-ILR-06 PT B01-03 03/17/98 98UI-451P022 P
N N
LEG ASSY TO ADAlrFER WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
PAGE 9-35
Wisconsin Electric Power Company
' Point Beach Nuclear Plant, Unit i 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METIIOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
TIIICKNESS RELIEF MATERIAL A & B
===========================================================_==============
RPV-ILR-08 MT B01-03 03/17/98 98UI-30lP010 P
N N
SLING LEG-ADAPTER WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
.002" TO.005" AVERAGE PRIMER TIIICKNESS AREAS.
i RPV-ILR-09 MT B01-03 03/17/98 98UI-30lP0ll P
N N
SLING LEG-ADAPTER WELD RPVINT ISI-PRI-1402 0.00 0.000 l
ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
.002" TO.005" AVERAGE PRIMER TIIICKNESS ON AREAS.
RPV-ILR-Il MT B01-03 03/17/98 98UI-30lP012 P
N N
SLING LEG-ADAPTER WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
.002" TO.005* AVERAGE PRIMER THICKNESS AREAS.
RPV-ILR-12 MT B01-03 03/17/98 98UI-30lP013 -
P N
N SLING LEG-ADAPTER WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
.002" TO.005" AVERAGE PRIMER TIIICKNESS ON AREAS.
k PAGE 9-36
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 -
Commercial Service Date 12/21/70
' COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE
. SHEET CREDIT TYP ITEM ISOMETRIC
'DIA.
THICKNESS i
RELIEF MATERIAL A & B t
========================================_=========================_=======
RPV-ILR-13 MT B01-03 03/17/98 98UI-30lP014 P-N N-SPREADER ASSY WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
.002* TO.005" AVERAGE PRIMER THICKNESS ON AREAS.
RPV-ILR-15 MT B01-03 03/17/98 98UI-301P015 P
N N
SPREADER ASSY WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITFM RERS 93-0041.
.002" TO.005* AVERAGE PRIMER THICKNESS ON AREAS.
RPV-ILR-17 MT B01-03 03/17/98 98UI-30lP016 P
N N
SLING LUG-BLOCK WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
l
.002" TO.005" AVERAGE PRIMER THICKNESS ON AREAS.
INSIDE A.REA OF THE SLING LUG 1.0" ON TOP AND BOTTOM ONLY EXAMINED DUE TO LUG CONFIGURATION.
1 RPV-ILR-18 MT B01-03 03/17/98 98UI-30lP017 P
N N
SLING LUG-BLOCK WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0041.
l
.002" TO.005 AVERAGE PRIMER THICKNESS ON AREAS.
INSIDE AREA OF THE SLING LUG 1" ON TOP AND BOTTOM ONLY EXAMINED DUE TO LUG CONFIGURATION.
b I
PAGE 9-37
' Wisconsin E!ectric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=========================================__========__===================================1 RPV-ILR-20 MT B01-03 03/17/98 98UI-30lP018 P
N N
TOP LUG-SLING BLOCK WELD RPVINT ISI-PRI-1402 0.00 0.000 ALL WELDS EXAMINED IN RESPONSE TO NUTRK ITEM RERS 93-0M1.
t
.002" TO.005" AVERAGE PRIMER THICKNESS ON AREAS.
RPV-INTERIOR VT-3 86E-03 03/18/98 001500 P
Y I
VESSEL INTERIOR SURFACES B13.10 ISI-PRI-1101 132.00 0.000 I
DEBRIS LOCATED ON RPV SE.it SURFACE, CORE BARREL SUPPORT LEDGE, AND LOWER HEAD REGION. ALL DEBRIS WERE SUBSEQUENTLY REMOVED BY REMOTELY OPERATED VEHICLE AND/OR HYDROVACUUM.
l
[
MEC UT 86E-03 03/11/98 ODINO P
Y N
RPV-MK-2 MIDDLE SHELL LONG SEAM AT 15 DEG.
Bl.12 ISI-PRI-1101 132.00 6.500 RR-1-18 RPV-MK-3 MEC UT 86E-03 03/11/98 001050 P'
Y N
LOWER SHELL LONG SEAM AT 195 DEG.
Bl.12 ISI-PRI-1101 132.00 6.500 RR-1-18 LIMITED TRANSVERSE EXAMINATION DUE TO THE RADIAL SUPPORT LUG.
COVERAGE OBTAINED = 95%.
[
RPV-MK-7-1 VT-3 86E-03 03/09/98 001600 P
Y N
i CORE SUPPORT GUIDE AT 0 DEG.
B13.60 ISI-PRI-l101 0.00 0.000 PAGE 9-38
Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsic 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=============_==================_=================-_======================
RPV-MK-7-2 VT-3 86E-03 03/09/98 001610 P
Y N
CORE SUPPORT GUIDE AT 90 DEG.
B13.60 ISI-PRI-1101 0.00 0.000 RPV-MK-7-3 VT-3 86E-03 03/09/98 001620 P
Y N
CORE SUPPORT GUIDE AT 180 DEG.
B13.60 ISI-PRI-1101 0.00 0.000 RPV-M K-7-4 VT-3 86E-0?
03/09/98 001630 P
Y N
CORE SUPPORT GUIDE AT 270 DEG.
B13.60 ISI-PRI-1101 0.00 0.000 SG-A-MAIN SUPPORT-2 VT-3 86E-03 02/27/98 98U1-754P006 P
Y N
COMPONENT SUPPORT F1.40 ISI-PRI-lll2 0.00 0.000 INSPECTED UP TO INSULATION.
SG-B-3 UT 86E-03 05/02/98 98UI-106P010 P
Y N
SHELL TO TRANS CONE CIRCUM WELD UT 86E-03 05/02/98 98UI-106P011 P
Y N
C1.10 ISI-PRI-1201 0.00 0.000 UT 86E-03 05/04/98 98UI-109P021 P
Y N
UT 86E-03 05/02/98 98Ul-163P001 P
Y N
109P021 FOR WELD PROFILES ONLY-REFER TO DATASIIEET NO. 88PBI-UT-010,011 AND 012 FOR LAMINATION EXAMINATION.
163P001 EXAMINED FROM 175" TO 310" LIFTING LUG LOCATED AT 296.0" TO 304.0" W= 61/2" FROM CENTER LINE ON SHELL SIDE.
TOTAL WELD LENGTH = 416".
CODE-REQUIRED COVERAGE OBTAINED.
PAGE 9-39
-m
- Wisconsin Electric Power Company Point Betrh Nuclcar Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road,
Milwaukee, Wisconsin 53201
- Two Rivers, Wisconsin 54241 Docket No. 50-266 Comtnercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM
- EXAM DATA L RESULTS PROGRAM ' IND
' COMPONENT DESCRIIVION TYPE DATE SHEET CREDIT TYP ITEM-ISOMETRIC DIA. ' THICKNESS RELIEF MATERIAL A & B
=============================-_==========================_=================
SG-B UT 86E-03 05/04/98 98U1-163P002 P
Y R
~ SHELL TO TRANS CONE CIRCUM WELD UT 86E-03 05/06/98 98UI-163P003 P
Y N
C1.10 ISI-PRI-1201 0.00 0.000 UT 86E-03 05/07/98 98UI-163P004 P-Y R'
UT X13-03 05/05/98 98Ul-164P003 P
N R
163P002 EXAMINED 310" TO 30".
163P003 EXAMINED 30" TO 130".
163P004 EXAMINED 130" TO 175".
LIFTING LUG LOCATED AT 88* TO 96", W = 6-1/2" FROM CENTER LINE ON SHELL SIDE.
164P003 ALL TECHNIQUES POINT TO INDICATIONS WHICH ARE LESS THAN 0.062* DEEP. TOTAL WELD LENGTH = 416" CODE-REQUIRED COVERAGE OBTAINED.
[
t SG-B-7 MT 86E-03 04/09/98 98UI-350P010 P
Y N
i SHELL TO MS NOZZLE UT 86E-03 N
C2.20 ISI-PRI-1201 0.00 0.000 UT TO BE PERFORMED DURING OUTAGE 08 (UIR25).
SI-01 VT-3 86E-03
-04/16/98 98U1-754PO40 -
P Y
N VARIABLE SPRING
[
Fl.10C ISI-PRI-1124 10.00 0.000 I
SI-10 VT-3 86E-03 03/30/98 98UI-754P032 P
Y N
1 RIGID SUPPORT F
Fl.10B ISI-PRI-1127 6.00 0.000 EXAMINED UP TO THE INSULATION. GROUT CHIPPED / CRACKED.
{
I; PAGE 9-40 j
)
.e
- Wisconsin Electric Power Company
. Point Beach Nuclear Plant Unit'l 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 Docket No. 50-266 -
' Commercial Service Date 12/21/70 a
t COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM ' IND -
COMPONENT DESCRIPTION TYPE DATE-SHEET CREDIT -
TYP ITEM -
ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
__===============================
=========================================l SI-12 VT-3 86E-03 04/16/98 98UI-754P042 P
Y N'
-SPRING HANGER F1.20C ISI-PRI-1255 4.00 0.000 SI-26 VT-3 86E-03 03/30/98 98UI-754P034 P
Y R-RIGID SUPPORT F120A ISI-PRI-1253 4.00 0.000
- BASE PLATE GAP UP TO 3/32".
SI-27 VT-3 86E-03 03/30/98
%UI-754P033 P
Y R
RIGID SUPPORT F1.20B ISI-PRI-1253 4.00 0.000
.i GAP AT SIDE OF PIPE WAS.25". LOWER EDGE OF WALL BASE PLATE NOT PAINTED AND BEGINNING TO CORRODE. THE SAME CONDITION WAS DOCUMENTED DURING UIR18.
SI-36 VT-3 D03-03 05/02/98 98UI-754P051 P
N N
[
RIGID SUPPORT F1.20B ISI-PRI 1253 4.00 0.000 EXAMINATION PERFORMED TO DOCUMENT REMOVAL PER RRM 98-0001 (W.O. 9701443).
j
+
SI-47 VT-3 86E-03 02/23/98 98UI-754P003 P
Y N
RIGID SUPPORT Fl.20B ISI-PRI-1254 4.00 0.000 PAGE 9-4I i
m u
+-
w,
u- - - - -u rw w c-vw
=.
- - _ _ _ -~
I Wisconsin Electric Power Company _
Point Beo:h Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 _
i Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP i
ITEM' ISOMETRIC DIA.
THICKNESS RELIEF MATERIAL A & B
=======_===========_.==========================_==
=======e====
SI-72 VT-3 86E-03 10/01/98 98UI-754P031 P
Y R
RIGID SUPPORT F1.20B ISI-PRI-1256 2.00 0.000 ONE-HALF THREAD FROM BEING FLUSH WITH OUTSIDE NUT.
s SI-80 VT-3 S17-03 03/27/98 98UI-754P028 P
N R
RIGID SUPPORT Fl.20B ISI-PRI-1257 2.00 0.000 CEILING HAS.2" GAP ON EAST, SOUTH AND WEST SIDE OF PLATE.
SI-867A-BLT MT B04-03 04/07/98 98UI-351P005 P
N N
VALVE BOLTING 10-IN CHECK MT B04-03 04/07/98 98U1-352P003
'P N
N B7.70 ISI-PRI-l125 2.00 0.000 VT-1 86E413 04/06/98 98U1-750P001 P
Y N
352P003 BOLTS NOT 100% EXAMINED IN AREA OF CONTACT WITH HEAD AND TAIL STOCK CONTACT AREAS.
SIS-02-SI-1001-05 PT 86E-03 02/21/98 98UI-451P007 P
Y N
I ELBOW TO PIPE t
C5.30 ISI-PRI-1250 2.00 0.344 SIS-02-SI-1001-12 PT 86E-03 02/21/98 98UI-451P003 P
Y N
ELBOW TO PIPE B9.40 ISI-PRI-1128 2.00 0.344 l
PAGE 9-42 i
h
Wisconsin Electric Power Company Point Betrh Nuclear Plant, Unit 1 231 West Michigan Avenue 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers,. Wisconsin 54241 Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA.
RESULTS PROGRAM IND COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT TYP ITEM ISOMETRIC DIA. ' THICKNESS RELIEF MATERIAL A & B
================================================_==========.==__=========_=
SIS-02-SI-1001 PT 86E-03 02/21/98 98UI-451P004 P
Y N
PIPE TO ELBOW -
B9.40 ISI-PRI-1128 2.00 0.344 SIS-02-SI-1001-14 PT 86E-03 02/21/98 98UI-451P005 P'
Y N
ELBOW TO PIPE B9.40 ISI-PRI-l128 2.00 0.344 SIS-02-SI-1003-28 PT 86E-03 02/27/98 98UI-451P012 P
Y N
ELBOW TO PIPE B9.40 ISI-PRI-l130 2.00 0.344 SIS-02-SI-1003-29 PT 86E-03 02/27/98 98UI-451P013 P
Y N
PIPE TO ELBOW B9.40 ISI-PRI-I130 2.00 0.344 SIS-02-SI-1003-31 PT
. 86E-03 04/02/98 98Ul-451P031 P
Y R
PIPE TO ELBOW B9.40 ISI-PRI-1130 2.00 0.344 451P031 ONE ROUND INDICATION 3/32' ON DOWNSTREAM BASE METAL.
SIS-02-SI-1004-Il Irr 86E-03 02/21/98 98UI-451P006 P
Y R
PIPE TO ELBOW B9.40 ISI-PRI-1150 2.00 0.344 451P006 ONE LINEAR INDICATION.15" PAGE 9-43
Wisconsin Electric Power Company Point Beach Nuclear Pimt, Unit 1 -
231 West Michigan Avenue
- 6610 Nuclear Road Milwaukee, Wisconsin 53201 Two Rivers, Wisconsin 54241 -
Docket No. 50-266 Commercial Service Date 12/21/70 COMPONENT IDENTIFICATION METHOD EXAM EXAM EXAM DATA RESULTS PROGRAM INr) :
COMPONENT DESCRIPTION TYPE DATE SHEET CREDIT -- -TYP ITEM ISOMETRIC DIA.
THICKNESS
==================================================================
RELIEF MATERIAL A & B SIS 4)2-SI-1010-06 PT 86E-03
-04/21/98 98UI-451P034 P
Y N
PIPE TO ELBOW C5.30 ISI-PRI-1256 2.00 0.344 SIS-02-SI-1010-39 PT 86E-03 02/20i98 98U1-451P001 P
Y N
TEE TO PIPE C5.30 ISI-PRI-1258 2.00 0.34 4 L
SIS-04-SI-1005-34 PT 86E-03 03/30/98 98UI-451P030 P
Y N-l ELBOW TO PIPE UT 86E-03 03/31/98 98U1-109P032 P
Y N
e C5.21 ISI-PRI-1252 4.00 0.337 UT 86E-03 04/22/98 98UI-109P004 '
P-N N
UT 86E-03 03/31/98 98UI-161P018 P
Y N
109P004 FOR WELD PROFILES ONLY.
109P032 FOR LAMINATION SCAN ONLY.
[
SIS-04-SI-1006-30 PT
'E-03 02/20/98 98Ul-451P002 P
Y N
ELBOW TO PIPE UT N.
')3 02/27/98 98UI-109P023 P
Y N
C5.21 ISI-PRI-1253 4.00 0.337 UT 86E-al 02/21/98 98UI-161P001 P
Y '
G 161P001 ROOT GEOMETRY OBSERVED INTERMITTENTLY ALONG ENTIRE WELD LENGTIL l
l SIS-06-SI-1005-19 PT 86E-03 04/24/98 98U1-451P036 P
Y N
VALVE SI-888A TO ELBOW UT 86E-03 04/24/98 98UI-161P020 P
Y N
C5.Il ISI-PRI-1235 6.00 0.432 UT 86E-03 04/24/98 98UI-109P0ll P
Y N
161P020 SINGLE-SIDED EXAM DUE TO CONFIGURATION.
CODE-REQUIRED COVERAGE OBTAINED FROM ELBOW SIDE.
451F036
.l* ROUNDED INDICATION IN THE BASE METAL.
4 PAGE 9-44 i
. - -. ~
~. - - ~ -. - _. ~ - - - ~.
- - - - ~ ~. ~. _..
Wisconsin Electri Power Co, i
231 West Michigan Avenue Mdwaukee, WI $3201 Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers. WI $4241 Docket 50-266 Commercial Service Date 12/2100 3.4.
Pressure Tests 3.4.1 ASME Section XI Pressure Tests Following are pressure tests that have been conducted as part of the pressure test program at PBNP since the last refueling outage. The PBNP Pressure Test program utilizes Code Case N-498 for pressure tests on ASME Class 1 and 2 systems. It is the opinion of the Authorized Nuclear Inservice Inspector that the ASME Section XI requireinents for periodic pressure testing, were not completed in accordance with the code requirements. This concern was documented on and will be resolved as part of Condition Report 98-3574.
- Test
Description:
System Leakage Test of Class 1 Components Following Refueling Outage.
System:
Reactor Coolant,' Chemical and Volume Control, Main Steam, Primary Sampling Test Document:
IT-230 Completion Date:
6/23/98 Test
Description:
Quarterly Inservice Pressure Test of Boric Acid Transfer Pumps and Valves System:
Chemical and Volume Control Test Document:
IT-17 Completion Date:
1/3/98 Test
Description:
Waste Gas System Gaseous Leak Checks (Annual)
System:
Waste Gas Test Document:
IT-600 Completion Date:
1/3/98 3.5 Snubber Surveillance Tests 3.5.1 ASME Section XI Snubber Surveillance Tests Following are snubber inservice tests that have been conducted for snubbers less than 50 kips as part of the snubber surveillance test program at PBNP since the last refueling outage.
TEST DESCRIPTION: Snubber Inservice Test for Snubbers Less than 50 kips.
Snubber:
HS-13 Test Documents:
WO 9710138 Page 10 of 22
. ~ ~.
Wisconsin Electric Power Co.
231 West Michigra Avece Milwaukee WI 5320!
Point Beach Nuclear Plant, Unit 1 6610 Nuclest Road Two Rivers. WI 54241 Docket 50-266 Conunercial service Date 12/21/70 Completion Date:
04/27/98
. Results:
Acceptable Snubber:
- IIS-19 Test Documents:
WO 9710139 Completion Date:
06/03/98 Results:
Acceptable Snubber:
IIS-20 Test Documents:
WO 9710140 Completion Date:
M/03/98 Results:
Acceptable 4.0 ABSTRACT OF CONDITIONS NOTED AND CORRECTIVE MEASURES TAKEN 4.1 Component / Weld Nondestructive examinations were performed by P-G, PWA, QAS, RAYTHEON, and SwRI personnel. The nondestructive examinations utilized MT, PT, RT, UT, and VT techniques.
All the examinations were performed in accordance with written procedures that conform to the applicable sections of the ASME Boiler and Pressure Vessel Code. The following is a summary of the recorded indications found during the examinations and evaluated by WE personnel.
IDR 98U1-7P001, Class 1, PIPE TO ELBOW, SIS-02-SI-1004-11 Data Sheet No. 98U1-451P006, Drawing No. ISI-PRI-1150
. Method: PT Indication: Linear indication,0.1" on the upstream side of the weld centerline.
Disposition: Accept as is.
The linear indication does not violate the acceptance criteria of IWB-3514. Therefore, no additional or successive examinations are required.
IDR 98U1-7P002, Class 1, PIPE TO BRANCH CONNECTION, RC-03BP-1002-13 Data Sheet No. 98U1-451P015, Drawing No. ISI-PRI-1137 Method: PT Indication: Rounded indication in the base metal.
Disposition: Accept as is.
Page 11 of 22
__.___m.__
~._
Wisconsin Electric Pooer Co.
231 West Michigan Avenue Mdwaukee WI $3201 Poira Beach Nuclear Plant. Unit i 6610 Nuclear Road Two Rivers, WI 54241 Docket 50 266 Commercial service Date 12/2100 The rounded indication does not violate the acceptance criteria of IWB-3514. The rounded indication appears as a fabrication porosity pit and does not appear to be service related. No additional or successive examinations are required.
1 IDR 98U1-7P003, Class 1, MIDDLE'SHELL TO LOWER SHELL, RPV-16-683 Data Sheet No. 001010, Drawing No. ISI-PRI-1101 Method: UT Indication: Three subourface indications in the base metal.
Disposition: A'ccept as is.
The three indications do not viole.te the acceptance criteria ofIWB-3510. These subsurface
- flaws'are located between 3.6" and 6.7" from the weld centerline, and thus it can be assumed that they were present from the time of fabrication of the plate material and are not service
- related. No additional or successive examinations are required.
IDR 98U1-7P004, Class 1, LOWER SHELL TO LOWER HEAD RING,. RPV-17-683 Data Sheet No. 001020, Drawing No. ISI-PRI-1101 Method: UT Indication: Three subsurface indications in the base metal. One surface connected indication on the outside surface.
I Disposition: Accept as is.
The four indications did not violate the acceptance criteria ofIWB-3510. The one surface connected flaw was a shallow (ap' prox. 125" deep) indication which may have been caused from grinding or other surface preparation activities during construction and is not service related. The three other flaws are subsurface in nature which are located outside of the weld material, thus it can be assumed that they were present from the time of fabrication of the plate material and are not service related. No additional or successive examinations are required.
IDR 98U1-7P005, Class 1, UPPER SHELL TO FLANGE, RPV-14-683-A i
Data Sheet No. 001060, Drawing No. ISI-PRI-1101 Method: UT Indication: Two subsurface indications in the weld to base metal interface region.
Disposition: Accept as is.
The two indications did not violat'e the acceptance criteria of IWB-3510. These subsurface flaws are located at or near the weld to base metal interface and may be the remains of slag i
from the initial construction of the vessel. No additional or successive examinations are required.
1 4
Page 12 of 22
):
m..~._
Wisconsm Electrb: Power Co.
231 Wem Mbhigan Avenue Milwaukee, WI $3201 Point Beach Nuclear Plant, Urut 1 I
6610 Nuclear Road Two Rivers, WI 54241 Docket 50 266 i
Commercial service Date 12/21n0
-IDR 98U1-7P006, Class 1, VESSEL INTERIOR SURFACE, RPV-INTERIOR Data Sheet No. 001500, Drawing No. ISI-PRI-1101 Method: VT-3 Indication: Three pieces of debris located within the RPV.
Disposition: Removed from vessel.
The debris' located during the reactor vessel interior surfaces were documented and recorded y
on video tape. These debris were subsequently removed from the vessel utilizing a remotely operated vehicle and/or a hydro vacuum system. No additional or successive examinations required.
IDR 98U1-7P007, Class 1, OUTLET NOZZLE AT 208.5', RPV-2-686-C Data Sheet No. 001090, Drawing No. ISI-PRI-1101 Method: UT Indication: Three subsurface indications in the weld.
Disposition: Accept as is.
The three indications did not violate the acceptance criteria of IWB-35'12. These subsurface flaws are located within the weld and may be the remains of slag from the initial construction of the vessel. These flaws have been previously recorded and sized during the 1987, 1990, l
and 1993 examinations in accordance with IWB-2420(b) and have remained essentially l
unchanged. No additional or successive examinations are required.
l l
J IDR 98U1-7P008, Class 1, OUTLET NOZZLE AT 28.5, RPV-2-686-A 1
Data Sheet No. 001080, Drawing No. ISI-PRI-1101 Method: UT Indication: Four subsurface indications in the weld.
Disposition: Accept as is.
The four indications did not violate the acceptance criteria of IWB-3512. These subsurface flaws are located within the weld and may be the remains of slag from the initial construction of the vessel. These flaws have been previously recorded and sized during the 1987, 1990, and 1993 examinations in accordance with IWB-2420(b) and have remained essentially y
l unchanged. No additional or successive examinations are required.
i IDR 98U1-7P009, Class 1, INLET NOZZLE AT 328.5*, RPV-2-686-D Data Sheet No. 001110, Drawing No. ISI-PRI-1101 j
Method: UT Indication: Three subsurface indications in the weld.
Disposition: Accept as is, r
Page 13 of 22 4
a s
v r
,x y
y e
. ~ ~
.. ~.
l Wisconsin Electric Power Co.
231 West Michigen Avenue l
Mdwaukee, WI 53201 Pomt Beach Nuclear Plant, Unit I 6610 Nucicat Rrad Two Rivers. WI $4241 l
Docket 50-266 Commercial service Date 12/21n0 The three indications did not violate the acceptance criteria of IWB-3512. These subsurface flaws are located within the weld and may be the remains of slag from the initial construction of the vessel. No additional or successive examinations are required.
IDR 98U1-7P010, Class 1, SAFETY INJECTION NOZZLE AT 288.5, RPV-687-01-A Dr.ta Sheet No. 001120, Drawing No. ISI-PRI-1101 Method: UT Indication: One subsurface indication in the weld.
Disposition: Accept as is.
The one indication did not violate the acceptance criteria ofIWB-3512. This subsurface flaw is located within the weld and may be the remains of slag from the initial construction of the vessel. This flaw has been previously recorded and sized during earlier examinations has remained essentially unchanged. No additional or successive exammations are required.
IDR 98U1-7P011, Class 1, SAFETY INJECTION NOZ7LE AT 108.5', RPV-687-01-B Data Sheet No. 001130, Drawing No. ISI-PRI-1101 Method: UT Indication: One subsurface indication in the weld.
Disposition: Accept as is.
The one indication did not violate the acceptance criteria ofIWB-3512. This subsurface flaw is located within the weld and may be the remains of slag from the initial construction of the vessel. No additional or successive examinations are required.
IDR 98U1-7P012, Class 1, OUTLET NOZZLE TO PIPE AT 28.5, RC-34-MRCL-AI-01 Data Sheet No. 001270, Drawing No. ISI-PRI-1120 Method: UT Indication: Four subsurface indications in the base metal.
Disposition: Accept as is.
The four indications did not violate the acceptance criteria of IWB-3512. These subsurface flaw are located approximately 2.25" from the weld centerline and are approximately 0.5" in l
depth, scattered around at various azimuths in the nozzle. Due to their locations, it can be assumed that they were present at the time of the fabrication of the nozzle and are not service related. No additional or successive examinations are required.
L l
i Page 14 of 22
. -.. - ~
- - ~
- -, ~.
Wisconsin Electrb Power Co.
231 West Michigan Avenue Milwaukee.WI 53201 Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Twc Rivers. WI 54241 Docket 50-266 Cornmercial service Date 12/21n0 IDR 98U1-7P013, Class 1, ELBOW TO INLET NOZZLE AT 328.5, RC-32-MRCL-AIII-03 Data Sheet No. 001290, Drawing No. ISI-PRI-1120 Method: UT
- Indication:. Four subsurface indications in the base metal.
Disposition: Accept as is.
The four indications did not violate the acceptance criteria ofIWB-3514. On the nozzle side of the weld, these subsurface flaw are located approximately 3.4" and 3.7" from the weld centerline and are approximately 0.4" and 0.7" in depth. Due to their locations, it can be assumed that they were present at the time of the fabrication of the nozzle and are not service related. On the elbow side of the weld, these subsurface flaw are located approximately 1.8" from the weld centerline and are approximately 0.95" and 0.9" in depth. Due to their locations, it can be assumed that they were present at the time of the fabrication of the elbow and are not service related. No additional or successive examinations are required.
IDR 98U1-7P014, Class 2, SIIEL L TO TRANS CONE CIRCUM ' WELD, SG-B-3 Data Sheet No. 98U1-163P002, Drawing No. ISI-PRI-1201 Method: UT
' Indication: Four inside surface indications in the base metal.
Disposition: Accept as is.
The indications did not violata the acceptance criteria of IWC-3510. It appears that these indications may have come om 'Isitting on the inside surface. No additional or successive r
examinations are required.
IDR 98U1-7P015, Class 2, ELBOW TO PIPE, AC-08-RHR-1004-03 s
Data Sheet No. 98U1-451P028, Drawing No. ISI-PRI-1228 Method: PT l
Indication:. Rounded indication in the base metal.
l Disposition: Accept as is.
)
The rounded indication does not violate the acceptance criteria of IWC-3514 (IWB-3514). The rounded indication appears as a fabrication porosity pit and does not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P016, Class'2, DIPE TO ELBOW, AC-08-RHR-1003-14 Data Sheet No. 98U1-451P027, Drawing No. ISI-PRI-1227
{
Method: PT Indication: Rounded indication in the base metal.
)
Disposition: Accept as is.
Page 15 of 22
Wisconsin Electric Power Co.
231 West Michigan Avene Milwaukee, WI 53201 Point Beach Nuclear Plara. Unit 1 6610 Nuclear Road Two Rivers, WI 54241 Docket 50-266 Commercial Service Date 12/2100 The rounded indication does not violate the acceptance criteria ofIWC-3514 (IWB-3514). The rounded indication appears as a fabrication porosity pit and does not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P017, Class 1, ELBOW TO PIPE, RC-36-MRCL-BII-02 Data Sheet No. 98U1-451P025, Drawing No. ISI-PRI-1121 Method: PT Indication: Rounded indications in the base metal.
Disposition: Accept as is.
The three rounded indications did not violate the acceptance criteria ofIWB-3514. The rounded indications appear to be fabrication porosity pits and do not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P018, Class 1, PIPE TO ELBOW, CVC-02-LD-1001-33 Data Sheet No. 98U1-451P019, Drawing No. ISI-PRI-1147 Method: - PT Indication: Linear indication on the weld centerline.
- Disposition: Accept as is.
The indication did not violate the acceptance criteria ofIWB-3514. No additional or successive examinations are required IDR 98U1-7P019, Class 2, TEE TO REDUCER, AC-10-RHR-1006-12 Data Sheet No. 98U1-451P020, Drawing No. ISI-PRI-1224' Method: PT Indication: Rounded indication in the base metal.
Disposition: Accept as is.
The rounded indication does not violate the acceptance criteria ofIWC-3514 (IWB-3514). The
. rounded indication appears as a fabrication porosity pit and does not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P020, Class 2, TEE TO REDUCER, SIS-06-SI-1005-19 Data Sheet No. 98U1-451P036, Drawing No. ISI-PRI-1235 i
Method: PT Indication: Rounded indication in the base metal.
Disposition: Accept as is.
Page 16 of 22
Wisconsin Electric Powtr Co.
231 West Michig.m Avenue Milwaukee, WI 53201 Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers, WI 54241 DocLet 50-266 Commercial rervice Date 12/21/70 l
The rounded indication does not violate the acceptance criteria ofIWC-3514 (IWB-3514). Tne l
rounded indication appears as a fabrication porosity pit and does not appear to be service l
related. No additional or successive examinations are required.
l IDR 98U1-7P021, Class 1, b S/C UUTLET NOZZLE TO ELBOW, RC-36-MRCL-BII Data Sheet No. 98U1-451P026, Drawing No. ISI-PRI-1121 Method: PT Indication: Round indication in the base metal Disposition: Accept as is.
The rounded indication does not violate the acceptance criteria ofIWB-3514. The rounded indication appears that it could have been caused by the removal and/or replacement of the insulation during ISI activities. This indication does not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P022, Class 2, PIPE TO ELBOW, FW-16-FW-1001-07 Data Sheet No. 98U1-350P008, Drawing No. ISI-PRI-1244 Method: MT Indication: Five linear indications in the base metal.
Disposition: Accept as is.
Three of the linear indications met and two of the linear indications do not meet the acceptance criteria ofIWC-3514 (IWB-3514). Per the two indications which do not meet the acceptance criteria, Table IWB-3514-4 allows the provisions of IWB-3514.2 (b) to be applied whenever the standards of the table are exceeded. IWB-3514.2(b) allows for volumetric examination of surface flaws if the allowable flaw standards of Table IWB-3514-1 are applied. All five of the linear indications met the acceptance criteria of Table IWB-3514-1. No additional or successive examinations are required.
IDR 98U1-7P023, Class 2, PIPE TO ELBOW, FW-16-FW-1001-11 Data Sheet No. 98U1-350P009, Drawing No. ISI-PRI-1245 Method: MT Indication: Five linear indications in the base metal.
Disposition: Accept as is.
Three of the linear indications met and two of the linear indications do not meet the acceptance criteria of IWC-3514 (IWB-3514). For the two indications which do not meet the acceptance l
criteria, Table IWB-3514-4 allows the provisions of IWB-3514.2 (b) to be applied whenever the standards of the table are exceeded. IWB-3514.2(b) allows for volumetric examination of surface flaws if the allowable flaw standards of Table IWB-3514-1 are applied. All five of the Page 17 of 22
Wisconsin Electric Power Co.
231 West Michigan Avemie Milwaukee, WI 53201 Pomt Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers. WI 54241 Docket 50-266 Commercial service Date 12/21n0
- linear indications met the acceptance criteria of Table IWB-3514-1. No additional or successive examinations are required.
IDR 98U1-7P024, Class 1, PIPE TO ELBOW, SIS-02-SI-1003-31 Data Sheet No. 98U1-451P031, Drawing No. ISI-PRI-1130 Method: MT Indication:~ Rounded indication in the base metal.
Disposition. Accept as is.
The rounded indication does not violate the acceptance criteria ofIWB-3514. This indication does not appear to be service related. No additional or successive examinations are required.
IDR 98U1-7P025, Class N/A', PUMP FLYWIIEEL, RCP-A-FLYWHEEL-KEYWAY
- Data Sheet No. 98U1-450P001, Drawing No. ISI-PRI-1404 Method: PT Indication: Linear indications in keyway.
Disposition: Accept after surface conditioning.
The two areas where the indications were recorded appeared to be smeared metal, which q
probab'y occurred during the insertion of the keys into the keyways during the last maintenance of the pump. These examinations were performed in accordance with USNRC Reg. Guide 1.14, which recommends the use of ASME Section III acceptance criteria. Prior to application of this criteris, the two areas which had indications were surface conditioned and then re-examined with PT, wliich revealed no recordable indications. In addition, the entire flywheel, bore, and keyway areas were examined ultrasonically from the flywheel edge.
This examination also revealed no recordable indications. No additional or successive examinations are required.
1 IDR 98U1-7P026, Class 1, VALVE BOLTING 10-IN GATE, RH-720-BLT Data Sheet No. 98U1-352P001, Drawing No. ISI-PRI-1124 Method: MT
- Indication: Linear indication on one 1 alt.
Disposition: Affected bolting replaced.
The linear indication on the one bolt does not violate the acceptance criteria of IWB-3517, as it appears to have been caused during the disassembly / assembly process of the joint connection.
As such, no additional examinations are required. However, after the initial detection of the
- indication, the affected bolting was removed from service and replaced with new bolting per RRM 98-0042. The replacement bolting was examined prior to installation.
' Page l'8 of 22
Wisconsin Electric Power Co.
231 West Michigm Avenue Milwaukee. WI 53201 Point Beach Nuclear Plant. Unit !
6610 Nucleat Road Two Rivers, WI 54241 Docket 50-266 -
Commercial service Date 12/21n0
. IDR 98U1-7P027, Class 1, SAFE-END TO NOZZLE, PZR-SPRAYNOZ-SE Data Sheet No. 98U1-RT2WE001, Drawing No. ISI-PRI-1104 Method: RT Indication: Elongated indications.
Disposition: Accept as is.
The elongated indications do not viola.e the acceptance criteria ofIWB-3514. A review of the previous examination data was performed, no change in the size of the indications could be detected. No additional or successive examinations are required.
IDR 98U1-7P028, Class 3, RIGID SUPPORT, H-89 Data Sheet No. 98U1-754P026, Drawing No. ISI-PRI-1326 Method: VT-3 Indication: Rod slightly bowed away from platform. Support shows gouges on rod where the rod travels through the cut out on the stairway platform.
Disposition: Accept as is.
This support was recently added to the program and has not been previously inspected.
Further investigation determined that.the rod was not actually gouged, but the paint was scraped off and there was a minor indention in the rod. The minor bowing of the rod and the indention do not affect the operability of the component. These conditions do not violate the acceptance standards of N-491-3410, therefore, no additional or subsequent examinations are required.
hDR 98U1-7P029, Class 3, RIGID SUPPORT, H-133 Data Sheet No. 98U1-754P027, Drawing No. ISI-PRI-1349 Method: VT-3 Indication: Ceiling has a.15" gap on East and North side of plate.
Disposition: Accept as is.
This support was recently added to the program and has not been previously examined. The gap exists due to the uneven mounting surface. The plate and bolting are painted and no evidence of inservice degradation was evident. The recorded condition does not affect the operability of the component. T.hese conditions do not violate the acceptance standards of IWF-3410/Ccde Case N-491, therefore, no additional or subsequent examinations are required.
Page 19 of 22
~ - ~ - - - - -... -
=-
Wisconsin Electric Power Co.
j 231 West Michigan Avenue
{
Milwaukee, WI 53201 Point Beach Nuclear Plant, Unit !
6610 Nuclear Road i
Two Rivers. WI 54241 Docket $4266
)
Commercial service Date 12/21/70 IDR 98U1-7P030, Class 2, RIGID SUPPORT, SI-80 Data Sheet No. 98U1-754P028, Drawing No. ISI-PRI-1257 Method: VT-3 Indication: Ceiling has a.20" gap on East, South, and West side of plate.
Disposition: Accept as is.
This component had been previously examined with a loose nut on the U-bolt identified, but with no mention of the gaps at the plate to mounting surface interface. The loose nut was repaired and the re-examination revealed no recordable indications. The gaps are due to the uneven mounting surface. No evidence of inservice degradation exists. The recorded conditions do not affect the operability of the component. The gaps between the surface and the plate do not violate the acceptance criteria ofIWF-3410/ Code Case N-491, therefore, no
)
successive or additional examinations are required.
4 IDR 98U1-7P031, Class 3, RIGID SUPPORT, H-21 A Data Sheet No. 98U1-754P030, Drawing No ISI-PRI-1323 Method: VT-3 Indication:.40" gap at sliding plate. As-built drawing shows a 1/4" gap without tolerance.
Disposition: Accept as is.
This support was recently added to the program and had not been previously examined.
Further investigation by the ISI Coordinator revealed that the gap at the inside of the sliding j
plate to grout interface was 1/4". Due to the sloping of the grout, the gap increases to 0.4" j
along the edge. There is no evidence of inservice degradation and the support is operable.
This condition does not violate the acceptance criteria ofIWF-3410/ Code Case N-491, therefore, no successive or additional examinations are required.
IDR 98U1-7P032, Class 2, RIGID SUPPORT, SI-72 Data Sheet No. 98U1-754P031, Drawing No. ISI-PRI-1256 Method: VT-3 Indication: 1/2 thread from beig fMh with outside of nut.
Disposition: Accept as is.
This support had been previously examined during U1R18 and U1R21 with no notation of the nut with incomplete thread engagement. Further investigation by the ISI Coordinator during this evaluation revealed that the bracket is tight against its mating surfaces and no gaps exist between the nuts and the bracket. Furthermore the nuts, studs and plate are painted with no evidence of loosening. Therefore, it can be concluded that this condition has existed since construction and no inservice degradation exists. This condition does not violate the acceptance standards ofIWF-3410/ Code Case N-491, therefore, no successive or additional examinations are required.
Page 20 of 22
.m
. _ _ _ ~. _
_..__m Wisconsin Electric Power Co.
231 West Michigen Avenue Milwaukee, WI $3201 Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers. WI $4241 Docket 50-266 Commercial service Date 12/21no IDR 98U1-7P033, Class 2, RIGID SUPPORT, SI-27 Data Sheet No. 98U1-754P033, Drawing No. ISI-PRI-1253 Method: VT-3 l~
Indication: Gap on the sides of the pipe was 1/4".
l Disposition:. Accept as is.
This support was previously examined during U1R18 with the same results recorded. These conditions do not violate the acceptance standards of IWF-3410/ Code Case N-491, therefore, l
no additional or subsequent examinations are required.
l 1
IDR 98Ul~7P034, Class 2, RIGID SUPPORT, SI-26 Data Sheet No. 98U1-754P034, Drawing No. ISI-PRI-1253 Method, VT-3 Indication: Base plate gap was up to 3/32",
- Disposition: Accept as is.
This support was previously examined.with no mention of gaps at the mounting surface interface. The gaps are due to the uneven mounting surface. No evidence of inservice degradation exists. This condition does not violate the acceptance standards of IWF-3410/ Code Case N-491, therefore, no additional or subsequent examinations are required.
IDR 98U1-7P035, Class 2, RIGID SUPPORT, R-147
)
Data Sheet No. 98U1-754P036, Drawing No. ISI-PRI-1224 Method: VT-3 Indication: Gap distance on wall side shows 4.2" and gap distance on opposite side is 3.9".
The drawing shows a gap distance of 4.5" on wall side and 4.0" on opposite side.
Disposition: Accept as is.
This support was recently added to the program and has not been previously examined. No evidence of inservice degradation we.s evident. These conditions do not affect the operability of the component. These conditions do not violate the acceptance standards ofIWF-3410/ Code Case N-491, therefore, no additional or subsequent examinations are required.
IDR 98U1-7P036, Class 1, RIGID SUPPORT. 40-18-PRC Data Sheet No. 98U1-754P038, Drawing ho. ISI-PRI-1140 Method: VT-3 Indication: Gaps seen on both wall plates. 15" gap exists at the plate farthest away from the l
ladder and a.1" gap exists at the plate closest to the ladder.
Disposition: Accept as is.
l:
Page 21 of 22
.n~..
-. -. - - - - _ _ _ ~... - ~. ~.... - -
~.. ~ ~. _ -
Wisconsin Electric Power Co.
231 West Michigan Avenue Milwaukee WI 53201 Point Beach Nuclear Plant. Unit 1 6610 Nuclear Road Two Rivers, WI 54241 Docket 50-266 i
Commercial service Date 12/21170 I
This support was recently added to the program and was not previously examined. The gaps exist due to the uneven mounting surface. The plate and the bolting are painted, and no evidence of inservice degradation exits. This condition does not violate the acceptance standards ofIWF-3410/ Code Case N-491, therefore, successive or additional examinations are required.
l L
IDR 98U1-7P037, Class 2, RIGID SUI PORT,31I-01:
i Data Sheet No. 98U1-754P021, Drawing No. ISI-PRI-1223 Method: VT-3 Indication: Grout cracked on west side of support and does not exist for 7" of 11 1/2" on east side.
Disposition: Accept as is.
This support was previously examined during U1R21 with similar results recorded. At that time, IDR 94U1-7P019 and Condition Report 94-101 were generated documenting this condition. At that time, the support was evaluated to meet and perform it's functional L
requirements and the system was considered to be operable. The supports immediately i
adjacent to and supports equal in number and similar in type, design, and function were examined during U1R21. The examina,tions of the additional support, revealed no recordable indications. As a response to the above noted Condition Report, Modification Request MR j
95-039 was generated on 06/06/95 to repair this support. In discussions with the Civil / Structural / Piping group, it was determined that these modifications have not occured as of this date. As there is no evidince of deformation or structural degradation to fasteners,
. springs, clamps, or other support items, this support is considered to be operable. These conditions do not violate the acceptance standards of IWF-3410/ Code Case N-491, therefore,
- no additional or subsequent examinations are required.
4.2 -
Pressure Tests No reportable indications observed.
4.3 Snubber Surveillance Tests Tests were acceptable, no corrective actions required.
l l