' OPERATING DATA REPORT DOCKET NO. 50-266
~
DATE: 01/06/98 COMPLETED BY: M. B. Koudelka TELEPHONE: 920-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES
- 2. REPORTING PERIOD: December - 1997
' 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDA8LE CAPACITY (t'ET MWE): 485.0
.........s
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NA
- 9. POWER L EVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8,760.0 238,032.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1,917.G 194,791.5
- 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 721.2 1,872.2 191,527.2
- 15. UNIT RESERVE SHUTDOWN HOURS O.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,038,155.0 2,597.668.0 272,092.053.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 361,950.0 896,670.0 91.987.760.0.
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
'346,522.5 825,421.5 87,681,841.0
- 19. UNIT SERVICE FACTOR 96.9 %
21.4 %
80.5 %
- 20. UNIT AVAILABILITY FACTOR 96.9 %
21.4 %
8 0.8 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.0 %
19.4 %
75.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.7 %
' 9.0 %
74.1 %
- 23. UNIT FORCED OUTAGE RATE 3.1 %
78.6%
4.8%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 02/07'98,75 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
~
9001200028 900109 PDR ADOCK 05000266 R
e. ;.
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-2$6 ~
^'
AVERAGE DAILY UNIT POWER LEVEL '
UNIT NAME Point Beach, Unit 1 MONTH DECEMBER.-
1997 DATE
'1/2/98 E
COMPLETED BY.
M. 'B. Koudelka..,
q TELEPHONE 920-755-6480 AVERAGE C.cdAGE
. AVERAGE DAILY DAILY DAILY '
POWER LEVEL POWER LEVEL
.; POWER LEVEL' DAY MWe NET DAY MWe NET DAY' MWe' NET ~
1
'27 11 500 21 "498-2-
40 12 499 22' 503 3.
364 13
'499 23-
'496 4
510 14 499 24 500 j
5 508 15 500
'25
-500' 6
500 16 499 26 499 7.
500' 17 300
.27 500 8
500' 18 499 28 500 9
499 19 499 29 301 i
10 499 20 500 30' 502-31, 500 I
m_
m
'A
POINT BEACH NUCLEAR PLU4T Docket No.
150-266' Unit Name.
% ma unin 1 UNITSHLTDOWNS AND POWER REDLTTIONS Date'
' In/9a
- ConM By M g_ rwh -
REPORT MONTil DECEMBER.1997 -
- Telephone No.
920n5544sm Meduxi of -
1xemec Evers
~
Ikranoa kcacact Shut Repon No.
Synem Comporrne Came and Correcove Acam '
iNd
.- Date.
Typel Olaurs) '
s Reason' Down' Code *
- Code'
' To Prevera Recunente 21 970218-F 22.8 11 NA' NA NA
- Ihe unit was in tua shundos.a and mien no ctal semasown ce March 15.1997 r
'F: Forced 3 Reason:
' Method:
' Exhibit G - Instructions.
S: Scheduled
~A - Equipment Failure (explain) 1 - Manual
. for preparation of :
L
< B - Maintenance or Testing 2. Manual Scram data entry sheets C - Refueling 3 - Automatic Scram.
LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load
' F - Administrative
, 6 - Other (explain)
' Exhibit Ii Same Source G Operation.1 Error (explain) 11 - Other (explain) -
Y PBF4028b (03-90)
-, ~. - a -
" ~
POCKET Not; 50-266 l
9'-
UNIT NAME :
Point Beach Unit 1 :
iDATE?
01/07/98; COMPLETED BY M. B. Koudellia IELEPHONE t -
920/755-6480 1The daily power average for Unit 1 in December,' 1997, was 466 MWe.-
- The following Licensee Event Reports (LERs) were submitted to the NRC during December,1997:
(LER 266/97-042-00, Failure to Perform Containment Personnel Air Lock Surveillance While Door Interlock is Inoperable.
LER 266/97-043-00, Inadequate Technical Specification Surveillance of Reactor Trip System Interlocks;
. Special Report Fire Barrier Inoperable for Greater than Seven Days.
'l.
1MS-482A HX-1 A steam generator header PT-482 second-offisolation valve repacked.
2.
1 P-2A-C charging pump accelerometer pads installed.
'I l3.
'lP-15A&B safety injection pump accelerometer pads installed.
4.
~ P 38A&B motor-driven auiliary feedwater pump accelerometer pads installed.
g 5.
P-206A&B and P-207A&B G 01/G-02/G 03/G-04 emergency diesel generator fuel oil transfer pumps accelerometer pads installed.
6.
1RH-720 residual heat removal return to reactor coclant system valve control switch replaced.
i 9'
h J
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 01/07/98 COMPLETED BY: M. B. Koudelka TELEPHONE: 920-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NbTES
- 2. REPORTING PERIOD: December - 1997
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE). 523.8
- 5. DESIGN ELECTR! CAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.G
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTR!CTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8,760.0 222.817.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,897.4 187.885.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 0.0 1,788.5 185,296.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 2.570.941.0 266,175,948.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 0.0 876,240.0 90.479.550.0 g
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 809,177.5 86.220,761.0
- 19. UNIT SERVICE FACTOR O.0 %
20.4 %
83.2 %
- 20. UNIT AVAILABILITY FACTOR O.0%
20.4 %
83.3 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 %
19.0 %
79.3 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 %
18.6 %
77.9 %
- 23. UNIT FORCED OUTAGE RATE 100.0 %
45.5%
1.7 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
January 20,1998 DATA REPORTED AND FACTORS CALCULATED AS REOUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
' POINT BEACH NUCLEAR PLANT DOCKET NO.
' 50-301'
' AVERAGE DAILY UNIT POWER LEVEL UNIT NAME -
Point Beach, Unit 2 MONTH DECEMBER -
1997 DATE 1/2/98
. COMPLETED BYi M. B. Koudelka -
TELEPHONE 920-755-6480 AVERAGE AVERAGE AVERAGE' DAILY -
DAILY
. DAILY POWER LEVEL POWER LEVEL
. POWER LEVEL -
. DAY MWe NET DAY MWe NET -
DAY
' MWc NET
-1
-?
11
-2 21
-2 i
2.
-2 12
-2 22
-2 3
-2 13
-2 23
-2 4
-2 14
-2 24
-2 5
-2 15
-2 25
-2 6
-2 16
-2 26
-2 7
-2 17
-2
-27
-2 8
-2 18
-2 28
-2 9
-2 19
-2 29
-2 10
-2 20
-2 30 31
-2
~
s M
a-gw Fa wr e
y-
POINT CEACH NUCLEAR PLANT Docket No.
50-301-Unit Name '.
' Nar beh Unit 2 ' '
. UNrr SHIJrDOWNS AND POWTR RFlM'CT10NS Date
_1/7/98
. Completed By : '
M. B. Kaudelka REPORT MONTil DECEMBER - 1997 :
Telephone No.
920/755 4 480 Mc6ud of Ixensee Event '
Duranun Reactor Shus Report No.'
Sysaem Corgonetu Cause and Correcove Action.L
- J
, No.
I1er Type' f (llours)
Reason' Down' Code'.'
' Code' To Prevers Recunence 6
' 971115 F
.744 B
t' 2669744MO IA INSTRUX Unit 2 was taken to cold shuskmn so _ _-_-- ----- sesting of the reacsor prosecnon system k@ ;
perasssives.
' i 4
d
'F: Forced Reason:
' Method:
- Exhibit G - Instructions 2
. S: Scheduled
- A - Equipment Failure (explain) 1 - Manual for preparation of
' B - Mainter.ance or Testing 2 - Manual Scram data entry sheets
' C - Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Lead F-Administrative -
6 - Other (explain)
' Exhibit 1 - Same Source
~ G - Operational Error (explain)
. II - Other (explain) i 1
i PBFA C8b
' (O M O) i d
. 1 w
/m A
e e...
.s,_.
i.
DOCKET NO.-
50-3011 UNIT NAMEL
, Point Beach Unit 2-
- DATE
-01/07/s8' j
COMPLETED BYE M. B. Koudelka ~
TELEPHONE:
-920/755-6480 -
=
~
~
a r
. Unit 2 was taken to cold shutdown on Novemb6r 15,1997 in support of reactor protection--
System logic _ testing.
l.
. Safety-related maintenance included:
a t
1.
' 2852-3212M power to P-12A spent fuel pool cooling pump motor' starter tested.
l 2.
2.P-15A&B safety injection pump accelerometer pads installed.
~
. 3.
2P-2A&B charging pump accelerometer pads installed.
8 4
f'
'r i
4 4
e i
f 5
4 C
1 b
f i
-~.
w
?
~
a..-.
_a_.,.,._
-.;u
. u..
-,,,.c.