ML20198M225

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2
ML20198M225
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/1997
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20198M218 List:
References
NUDOCS 9801200028
Download: ML20198M225 (8)


Text

.

' OPERATING DATA REPORT -

DOCKET NO. 50-266

~

DATE: 01/06/98 COMPLETED BY: M. B. Koudelka -

TELEPHONE: 920-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
2. REPORTING PERIOD: December - 1997 .

' 3. LICENSED THERMAL POWER (MWT): 1518.5 . .

4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
7. MAXIMUM DEPENDA8LE CAPACITY (t'ET MWE): 485.0 .. ........ .. .... ...

.........s .

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

NA

9. POWER L EVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,760.0 238,032.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1,917.G 194,791.5
13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 667.3
14. HOURS GENERATOR ON LINE 721.2 1,872.2 191,527.2
15. UNIT RESERVE SHUTDOWN HOURS O.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,038,155.0 2,597.668.0 272,092.053.0
17. GROSS ELECTRICAL ENERGY GENERATED 361,950.0 896,670.0 91.987.760.0.
18. NET ELECTRICAL ENERGY GENERATED (MWH) '346,522.5 825,421.5 87,681,841.0
19. UNIT SERVICE FACTOR 96.9 % 21.4 % 80.5 %
20. UNIT AVAILABILITY FACTOR 96.9 % 21.4 % 8 0.8 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 96.0 % 19.4 % 75.6%
22. UNIT CAPACITY FACTOR (USING DER NET) 93.7 % ' 9.0 % 74.1 %
23. UNIT FORCED OUTAGE RATE 3.1 % 78.6% 4.8%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 02/07'98,75 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

~

9001200028 900109 PDR ADOCK 05000266 R PDR

, e . ;.

POINT BEACH NUCLEAR PLANT ^'

DOCKET NO. 50-2$6 ~

AVERAGE DAILY UNIT POWER LEVEL ' UNIT NAME '

Point Beach, Unit 1 MONTH DECEMBER .- 1997 DATE '1/2/98 E

COMPLETED BY . M. 'B. Koudelka ..,

q TELEPHONE 920-755-6480 AVERAGE C.cdAGE . AVERAGE DAILY DAILY DAILY '

POWER LEVEL POWER LEVEL .; POWER LEVEL' DAY MWe NET DAY MWe NET DAY' MWe' NET ~  !

1 '27 11 500 21 "498- '

2- 40 12 499 22' 503

3. 364 13 '499  !

23- '496 4 510 14 499 24 500 5

j 508 15 500 '25 -500' 6 500 16 499 26 499

7. 500' 17 300 .27 '

500 8 500' 18 499 28 500 9 499 19 499 29 301 i 10 499 20 500 30' 502-31, 500 I ,

m_ . ... . .. ._. ._. . . _ m . 'A

POINT BEACH NUCLEAR PLU4T Docket No. 150-266' .,

Unit Name .  % ma unin 1 UNITSHLTDOWNS AND POWER REDLTTIONS Date' ' In/9a -'

ConM By M g_ rwh -

REPORT MONTil DECEMBER.1997 - - Telephone No. 920n5544sm .,

< Meduxi of - 1xemec Evers

~

Ikranoa kcacact Shut Repon No. Synem Comporrne Came and Correcove Acam '

iNd .- Date .

Typel Olaurs) ' s Reason' Down' Code *  : Code' ' To Prevera Recunente 21 970218- F 22.8 11  !- NA' NA NA *Ihe unit was in tua shundos.a and mien no ctal semasown ce March 15.1997 r

'F: Forced 3 Reason: ' Method: ' Exhibit G - Instructions .

S: Scheduled ~A - Equipment Failure (explain) 1 - Manual . for preparation of : ,

< B - Maintenance or Testing 2 . Manual Scram data entry sheets C - Refueling 3 - Automatic Scram . LER file (NUREG4161) -

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load

' F - Administrative , 6 - Other (explain) ' Exhibit Ii Same Source G Operation.1 Error (explain) 11 - Other (explain) -

PBF4028b (03-90)

. :. . - . . - , . - , ~. - a -  ;- - . - , , , , . , ..

" ~

POCKET Not; 50-266 l 9'--

UNIT NAME : Point Beach Unit 1 :

iDATE? 01/07/98; COMPLETED BY '

M. B. Koudellia IELEPHONE t - 920/755-6480 1The daily power average for Unit 1 in December,' 1997, was 466 MWe.- .

- The following Licensee Event Reports (LERs) were submitted to the NRC during December,1997:  :

(LER 266/97-042-00, Failure to Perform Containment Personnel Air Lock Surveillance While Door Interlock is Inoperable.

LER 266/97-043-00, Inadequate Technical Specification Surveillance of Reactor Trip System Interlocks; ,

. Special Report Fire Barrier Inoperable for Greater than Seven Days.  !

'l. 1MS-482A HX-1 A steam generator header PT-482 second-offisolation valve repacked.

2. 1 P-2A-C charging pump accelerometer pads installed.

'I l3. 'lP-15A&B safety injection pump accelerometer pads installed.

4. ~ P 38A&B motor-driven auiliary feedwater pump accelerometer pads installed. g
5. P-206A&B and P-207A&B G 01/G-02/G 03/G-04 emergency diesel generator fuel oil transfer pumps accelerometer pads installed.
6. 1RH-720 residual heat removal return to reactor coclant system valve control switch replaced.

i 9'

h J

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 01/07/98 COMPLETED BY: M. B. Koudelka -

TELEPHONE: 920-755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NbTES .
2. REPORTING PERIOD: December - 1997 . .
3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE). 523.8 . -
5. DESIGN ELECTR! CAL RATING (NET MWE): 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.G . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . ......... .. ... .... ... .. ...
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTR!CTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,760.0 222.817.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,897.4 187.885.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 0.0 1,788.5 185,296.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 2.570.941.0 266,175,948.0
17. GROSS ELECTRICAL ENERGY GENERATED 0.0 g 876,240.0 90.479.550.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 809,177.5 86.220,761.0
19. UNIT SERVICE FACTOR O.0 % 20.4 % 83.2 %
20. UNIT AVAILABILITY FACTOR O.0% 20.4 % 83.3 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 % 19.0 % 79.3 %
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 % 18.6 % 77.9 %
23. UNIT FORCED OUTAGE RATE 100.0 % 45.5% 1.7 %
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

January 20,1998 DATA REPORTED AND FACTORS CALCULATED AS REOUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

' POINT BEACH NUCLEAR PLANT DOCKET NO. ' 50-301' --

' AVERAGE DAILY UNIT POWER LEVEL UNIT NAME - Point Beach, Unit 2 MONTH DECEMBER - 1997 DATE 1/2/98

. COMPLETED BYi M. B. Koudelka -

TELEPHONE 920-755-6480 AVERAGE AVERAGE AVERAGE' DAILY - DAILY . DAILY POWER LEVEL POWER LEVEL . POWER LEVEL -

. DAY MWe NET DAY MWe NET - DAY ' MWc NET

-1 -? 11 -2 21 -2 i

2.

-2 12 -2 22 -2 3 -2 13 -2 23 -2 4 -2 14 -2 24 -2 5 -2 15 -2 25 -2 6 -2 16 -2 26 -2 7 -2 17 -2 -27 -2 8 -2 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 31 -2

~

s M a-gw Fa wr *- e y-

POINT CEACH NUCLEAR PLANT Docket No. 50-301-Unit Name '. ' Nar beh Unit 2 ' '

. UNrr SHIJrDOWNS AND POWTR RFlM'CT10NS Date _1/7/98

. Completed By : ' M. B. Kaudelka REPORT MONTil DECEMBER - 1997 : ' " '

Telephone No. 920/755 4 480 Mc6ud of Ixensee Event ' . .

Duranun Reactor Shus Report No.' Sysaem Corgonetu

  • J Cause and Correcove Action.L

, No. I1er Type' f (llours) Reason' Down' ' Code' Code'.' To Prevers Recunence 6 ' 971115 F .744 B t' 2669744MO IA INSTRUX Unit 2 was taken to cold shuskmn so _ _-_-- ----- sesting of the reacsor prosecnon system k@ ;

perasssives. .

'i 4

d 2

'F: Forced Reason: ' Method:

  • Exhibit G - Instructions

. S: Scheduled  ; A - Equipment Failure (explain) 1 - Manual for preparation of

' B - Mainter.ance or Testing 2 - Manual Scram data entry sheets

' C - Refueling 3 - Automatic Scram LER file (NUREG4161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Lead F- Administrative - 6 - Other (explain) ' Exhibit 1 - Same Source

~ G - Operational Error (explain)

. II - Other (explain) i-1 i

, PBFA C8b

' (O M O) i d

_ _ _ _ _ _ . - _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ - _ _ ._1 w /m . # A . , e - e... --

.s ,_. .

. i. DOCKET NO.- 50-3011

.  ; UNIT NAMEL , Point Beach Unit 2- -.: ;

- DATE -01/07/s8' j COMPLETED BYE M. B. Koudelka ~  :

" =

TELEPHONE: -920/755-6480 - ~

~

a .'_

r

. Unit 2 was taken to cold shutdown on Novemb6r 15,1997 in support of reactor protection--  :

, . System logic _ testing.

. Safety-related maintenance included:

l. a t
1. ' 2852-3212M power to P-12A spent fuel pool cooling pump motor' starter tested. ..

l

' ~

2. 2.P-15A&B safety injection pump accelerometer pads installed.

. 3. 2P-2A&B charging pump accelerometer pads installed.

8 4

f' r i .-

4 4

e i

f 5 4

C 1

b f

i

-~.

w