ML20151W398
| ML20151W398 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/31/1998 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20151W381 | List: |
| References | |
| NUDOCS 9809150301 | |
| Download: ML20151W398 (1) | |
Text
I Og OPERATING DATA REPORT DOCKET NO. 50-301
[
2C
?
$8 88 n
00 88 o,o OPERATING STATUS 100 M
1.
UNIT NAME: POINT BEACil NUCLEAR PLANT - UNIT 2 NOTES 2.
REPORTING PERIOD: March - 1998 I
3.
LICENSED TilERMAL POWER (MWT): 1,518.5 4.
NAMEPLATING RATING (GROSS MWE): 523.8 5.
DESIGN ELECFRICAL RATING (NET MWE): 497.0 6.
hfAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 7.
M AXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 8.
IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TilROUGli 7) SINCE LAST REPORT, GIVE REASONS:
0 9.
POWER LEVEL TO WillCil RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICrlONS,(IF ANY):
-NA Tills MONTil YEAR TO DATE CUMULATIVE I1. IlOURS IN REPORTING PERIOD 744.0 2,160.0 224,977.0
- 12. NUMBER OF llOURS REACTOR WAS CRITICAL 197.4 703.9 188,588.9
- 13. REACTOR RESERVE SIIUTDOWN IIOURS 0.0 0.0 233.9
- 14. IIOURS GENERATOR ONLINE 173.0 658.0 185,954.8
- 15. UNIT RESERVE SIIUTDOWN llOURS 0.0 0.0 302.2
- 16. GROSS TIIERMAL ENERGY GENERATED (MWil) 241,520.0 951,847.0 267.127,795.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 81,760.0 324,910.0 90.8(M.460.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWil) 73,619.0 301,775.5 86,522,f36.5
- 19. UNIT SERVICE FACTOR 23.3 %
30.5 %
82.7 %
- 20. UNIT AVAILABILITY FACTOR 23.3 %
30.5 %
82.8 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 20.4 %
28.8 %
78.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 19.9 %
28.1 %
77.4 %
- 23. UNIT FORCED OUTAGE RATE 76.7 %
69.5 %
2.4%
- 24. SHbTDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATE. AND DURATION OF EACil):
None
- 25. IF SilUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEI'TEMBER 22,1977
-- -