ML20055F413

From kanterella
Revision as of 17:41, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Inservice Insp Rept Unit 1 Catawba 1990 Refueling Outage 4, Per 10CFR50.55(a)(q) & Tech Spec 4.0.5.Insp Performed Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda
ML20055F413
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/05/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055F414 List:
References
NUDOCS 9007160394
Download: ML20055F413 (1)


Text

'

8 Duke her Company .

k'!^ *

'lin R h en n<ePresident PO Box 33199 y Charlotte, N C 28242 Nuclear Production (704)373 4 51)

DUKE POWER July 5, 1990 U..S Nuclear Regulatory Commission ATTN Document Control Deek Washington, D.C. 20555 -

Subject:

- Catawba Nuclear Station, Unit 1 Docket'No. 50-413 End of Cycle 4 Inservice Inspection Report ,

Gentlemen Pursuant to 10 CFR 50.55 (a) (q) and Catawba Nucinar Station Technical Specification. 4.0.5, please find attached the Catawba Unit 1 end of Cycle 4 Inservice Inspection Report. The Catawba Unit 1 end of Cycle 4 refueling outage was completed on April 26, 1990. This Inservice Inspection was performed in accordance with Section XI of the ASME Boiler and Pressure i Vessel Code and applicable addenda.

Very truly yours, h ,

f

- c,g 2 v Ital B. Tucker

- MHil/47/lcs Attachment (Without) xc: Mr. S. D. Ebneter. Regional Administretc/e .

U. S. Nuclear Regulatory _ Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. W.'T. Orders NRC Resident Inspector Catawba Nuclear Station 9007160394 9007o5  ;

gDR -ADOCK 05000413 PDC [hWL[

- v i