ML20055F846

From kanterella
Revision as of 16:20, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests 14-day Extension Until 900802 to Submit LER 414/90-010 to Investigate Power Supply Realignment
ML20055F846
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/12/1990
From: Owen T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9007190285
Download: ML20055F846 (1)


Text

f ?,% W e'

/5> - ll.

l!.

<' thde hurt Company ' (m1) MIJ000 Cala;tba Nuclear Station

' '~

t

,w P 0 (tu 256 U, ,, , l Clocer, SC 23710 ;

y w ,

i ~y . -

. l DUKEPOWER

, 7 July 32i 1990 I '

. Document i Control' Desk f U. S.fNuclear Regulatory Commission L

Washington, D.-C.

20555 h

Subject:

Catawba Nuclear Station Docket No. 50-413 LER 414/90-010 i:

+

. Gentlemen: .

[E Duko-Power Company requests that a 14 day extension be granted for submittal of LER 1414/90-010, which deals with the apparent Tech Spec violation resulting from VP I -operations with EMF-39 inoperable (due to a tripped sample pump).

~

The. investigation of this event is well underway, however-additional time is nooded ,

to adequately investigate and document all relevant aspects. The principle remaining investigation is focussing on the sequence of events'(power supply

<re-alignment) that' led to.the loss of-power and tripping of the sample pump. We

-want:to ensure that we have adequately addressed all pertinent factors.

i We will submit-this report by 2 August 1990. Thank you for your consideration.

Very truly'yours, s

[

Tony B. Owen ,

Station Manager '

gcd xc: Mr. S. D. Ebneter Regional Administrator, Region II

+ U. S._ Nuclear Regulator Commission 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323

.900'7190285 900712' "

ALOCK 05000414

[,

(PDR o= PDC-I 0

1

,' .4