ML20056A337

From kanterella
Revision as of 12:57, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to, ASME Code Section XI Inservice Insp & Testing Program,Second 10-Yr Insp Interval of Operation.
ML20056A337
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/31/1990
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056A338 List:
References
NUDOCS 9008070035
Download: ML20056A337 (2)


Text

r -

p

^~

.3 - ,

c 1 ___ -

)

[ 414 Nied Wt M J Minneapolis Minnesota $54011927

,' Telephone (612) 330-5500

. July 31, 1990 10 CFR Part 50 Section 50.55(g).

- Director of Nuclear Reactor Regulation ti US Nuclear Regulatory Commission

- Attn: Document Control Desk Washington DC 20555 PRAIRIE ISLAND NUCLEAR CENERATING PLANT Docket No. 50 282 License No. DPR 42 50 306 DPR-60 Revision No. 2 to the ASME Code Section XI Inspection and Testine Program.

(Attached you will find a copy of Revision No. 2 to the Prairie Island Code Section XI Inservice Inspectirn and Testing Program Manual. This is a revision to our Inservice Inspection and Testing program submitted to the Commision on December 22, 1983 covering the second ten-year interval.of operation of the Prairie Island plant.

NRC Staff review and approval is requested for revised Relief Request No. 66 for Unit 2 in accordance with 10 CFR Part 30, Section 50.55(g). The change to Unit 2 Request for Relief No. 66 now is the same as Unit 1 Request for Relief ,

No. 66. I r

Request for Relief No. 67 is hereby withdrawn from both units. Request for ]

Relief No. 67 is not needed since the exemption criteria excludes " components  ;

and their connection in piping on 1 inch, nominal pipe size and smaller." l Request for Relief No. 67 was written for the Excess Letdown Heat Exchanger l

. nozzles which are 3/4 inch. d Also attached are instructions for entering the page revisions. Please contact us if you have any questions related to this revision.

l l

L

-Thomas M Parker Manager Nuclear Support Services c:' Regional Administrator-III, MRC NRR Project Manager, NRC h NRC Resident Inspector,'NRC State of Minnesota Hartford Insurance C Charnoff Attachments:

9008070035 900731 gDR ADOCK 0500 2

/// ,

j

. r

e. . ,

p -Instructions for Enterinz

1. File Cover Letter Separately.

-2. Replace Review and' Approval Page with the attached page.

3. Insert pagesLinithe ISI/IST. Program Manual as follows:

REMOVE & DISCARD INSERT ATTACHED REVISED PAGES' 11 ii'

'lii iii t

.1.5 1 1.5 1 1.5-55 - - -

2.1.1-9 2.1.1 9 2.5-1 2.5-1 2.5 41 2.5-41 2.5 42 ------

l

-i 1

1

'1 l

l l

NOTE: Use the " Record of Revisions" pages 11 and 111 to verify your copy is complete and up-to-date.

l l

l l l

Page 2 of 2 1

--____--_---_---______---__---__-_-__--_____---__!