ML20043F611

From kanterella
Revision as of 12:03, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Response to Request for Addl Info Re Operator Response Times During Simulated Steam Generator Tube Rupture at Facility,Will Be Delayed Until 900630
ML20043F611
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/06/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006150148
Download: ML20043F611 (1)


Text

-

ll I

. gue her compey guy 7 ,

c

"nwa v~~

f5NEII$[""

' DUKE POWER June 6, 1990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Steam Generator Tube Rupture Your April 20, 1990 letter transmitted a request for additional information regarding operator response times during a simulated Steam Generator Tube Rupture (SGTR) at Catawba Nuclear Station. Specifically, you requested response times for the reccvery actions identified in Table 2.3-1 of the Westinghouse Owner's Group WCAP-10698, SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill, for all the Catawba operators. 1 j

Be advised that my response will be delayed until June 30, 1990. Additional time is required to properly evaluate your request for information. I  !

l apologize for the slight delay.

i.

Very truly yours, I

\s.?>.T%

H. B. Tucker JGT/7/0EL xc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 l Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station Dr. K. N. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 14H25 Washington, D. C. 20555 l