ML20012A189

From kanterella
Revision as of 00:41, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Addl 2 Weeks Needed for Completion of LER 413/90-12.Rept Will Be Submitted on 900312
ML20012A189
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/26/1990
From: Owen T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003080464
Download: ML20012A189 (1)


Text

'

.c* . Duke 1%urr Cont 1,1sy gpo3p S3p.3p(gr

-( Cataufe huclnu Statroto l'U 5<u 2M -

Ciruer, S C ?9710 DUKEPOWER February 26, 1990 i

Document Control Desk US NRC l Washington, D.C. 20555 i:

Subject:

Catawba Nuclear Station Docket No. 50-413 0 LER/90-12 L Gentlemen:

Licensco Event Report 413/90-12, CAD DOOR 311 OPEN WITHOUT COMPENSATORY MEASURES IN PLACE, RENDERING ANNULUS t VENTILATION SYSTEM INOPERABLE, will require an additional two weeks to completo due to necessary discussions with a largo-number of people. involved the day of the event. I y

. cxpect to submit that report now on March 12, 1990.

Very Truly Yours,

( l Ow T. B. Owen, Manager Catawba Nuclear Station RMG/gcd l

9003080464 900226 +

PDR ADOCK 05000413 S PNV r6M ij i