ML14167A159

From kanterella
Revision as of 19:30, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Category 1 Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 Seismic
ML14167A159
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/02/2014
From: Juan Uribe
Containment and Balance of Plant Branch
To: Whaley S
Containment and Balance of Plant Branch
Uribe J, NRR/JLD
References
Download: ML14167A159 (5)


Text

September 2, 2014 MEMORANDUM TO: Sheena A. Whaley, Chief Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation FROM: Juan F. Uribe, Project Manager /RA by Nicholas DiFrancesco for/

Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE JUNE 12, 2014, CATEGORY 1 PUBLIC MEETING WITH SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 TO DISCUSS SEISMIC HAZARD REEVALUATIONS ASSOCIATED WITH IMPLEMENTATION OF JAPAN LESSONS-LEARNED NEAR-TERM TASK FORCE RECOMMENDATION 2.1.

On June 12, 2014, the U.S. Nuclear Regulatory Commission (NRC or the staff) held a Category 1 public meeting1 with PSEG Nuclear, LLC (PSEG, the licensee) for Salem Nuclear Generating Station, Units 1 and 2 (Salem). The purpose of this meeting was to discuss issues resulting from the staffs screening and prioritization of Salem relating to Enclosure 1, Recommendation 2.1: Seismic, issued on March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights From the Fukushima Dai-Ichi Accident.2 By letter dated May 9, 2014,3 the NRC staff categorized Salem, as a conditional screen in, prioritization group 3 plant with a risk evaluation due by December 31, 2020, based on the staffs screening review. By memo dated May 21, 2014, the NRC staff documented their preliminary Ground Motion Response Spectra (GMRS) curve in comparison to all licensee GMRS curves along with the plants Safe Shutdown Earthquake (SSE) and Individual Plant Examination of External Events (IPEEE) High Confidence Low Probability of Failure (HCLPF)

Spectra, also known as the IHS (IPEEE HCLPF Spectra). The public meeting supported an information exchange and understanding of engineering differences to achieve subsequent technical resolution.

To facilitate the discussion, the NRC staff and PSEG representatives presented4 the engineering details on the modeling inputs used to develop GMRS curves. The meeting highlights included:

1 The original meeting notice is available via the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14163A126.

2 The 50.54(f) letter and Enclosure 1 are available under ADAMS Accession Nos. ML12053A340 and ML12056A047.

3 The May 9, 2014 letter is available in ADAMS under Accession No. ML14111A147.

4 The NRC and PSEG slides can be found in ADAMS under Accession Nos. ML14162A440 and ML14162A432.

S. Whaley

  • NRC and licensee discussed differences in methods used to calculate kappa (i.e. soil seismic energy damping)
  • NRC and licensee discussed differences in velocity profiles, available onsite data, and modeling epistemic uncertainties represented in the profiles
  • Based on interactions the NRC staff would consider licensee information and develop a request for additional information (RAI) to resolve differences In summary, the NRC staff stated that the primary differences between the NRC staff and licensee GMRS curves appear to result from:
  • The different treatment of damping from the Potomac Group soil formation
  • Total kappa value used
  • Total amount of base cases used in the analysis (the licensee used 3 and the NRC used 1)

Finally, the NRC staff stated that a follow up RAI may be issued to document the licensees technical basis and background information, as well as any other clarifications associated with the information presented at the meeting.

No regulatory decisions or commitments were made during the meeting. The public was invited to observe the meeting and was given several opportunities to communicate with the NRC during the public meeting and before adjourning. The NRC staff received no public comments and no meeting feedback forms.

CONTACT: Juan F. Uribe, NRR/JLD/JHMB 301-415-3809 Docket Nos. 50-272 and 50-311

Enclosure:

List of Attendees

ML14167A159 *Concurrence via e-mail OFFICE NRR/JLD/PMB/PM NRR/JLD/LA NRR/JLD/PMB/BC NRR/JLD/PMB/PM NAME JUribe (NDiFrancesco for) SLent SWhaley (RKuntz for) JUribe (NDiFrancesco for)

DATE 09/02/14 09/02/14 09/02/14 09/02/14 List of Attendees U.S. Nuclear Regulatory Commission Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 Concerning Seismic Hazard Reevaluation Submittals Japan Lessons-Learned Near-Term Task Force Recommendation 2.1: Seismic June 12, 2014 Name Organization Name Organization Jon Ake NRC/RES/DE Charlotte Geiger PSEG Cliff Munson NRC/NRO/DSEA Craig Swanner MPR Associates Diane Jackson NRC/NRO/DSEA John Richards EPRI Nicholas DiFrancesco NRC/NRR/JLD Lisa Walsh NRC/NRO/DSEA Kamal Manoly NRC/NRR/DE Ricardo Rodriguez NRC/NRO/DSEA Yong Li NRC/NRR/DE Zuhan Xi NRC/NRO/DSEA Brittain Hill NRC/NRO/DSEA Dogan Seber NRC/NRO/DSEA John Boska NRC/NRR/JLD David Heeszel NRC/NRO/DSEA Mahmoud Jardaneh NRC/NRO/DSEA Scott Stoval NRC/RES/DE Donnie Harrison NRC/NRO/DSRA Thomas Weaver NRC/RES/DE Stephanie Devlin NRC/NRO/DSEA Rob Kuntz NRC/NRR/JLD Rasool Anooshehpoor NRC/RES/DE Jana Bergman Curtis Wrights Juan Uribe NRC/NRR/JLD Richard Rogalaski Energy Northwest Michael Dschida American Electric Power Michael Balazik NRC/NRR/JLD (AEP)

Andrew Mauer NEI Anders Gilbertson NRC/RES/DRA Christopher Schwarz PSEG Jemie Dababneh Rizzo Associates Bill McTigue PSEG Kit Ng Bechtel Gary Ruf PSEG (continues to next page)

Abbreviations:

DE - Division of Engineering DSEA - Division of Site Safety and Environmental Analysis DSRA - Division of Safety Systems & Risk Assessment IPT - International Program Team JLD - Japan Lessons-Learned Division NRO - Office of New Reactors NRR - Office of Nuclear Reactor Regulation RES - Office of Nuclear Regulatory Research NEI - Nuclear Energy Institute Enclosure

Name Organization Name Organization Pacific Gas and Electric Kenneth Schrader (PGE)

Dale Wuokko Toshiba Tom Bernard Aterra Solutions Ryan Foley Sargent Lundy Phil Tarpinian Exelon Lance Escher Morgan Lewis Glen Ohlemacher DTE Energy Andrew Miller Erin Engineering Ken Ying URS Corporation Al Haeger Certrec Mark Moenssens Westinhouse Barbara Hayes NRC/NRO/DSEA Roy Linthicum Exelon Diego Rivera Rizzo Associates Robert Reible Luminant Veljka Burazer Duke Energy Andy Langdon Energy Northwest David Mosby Enercon Suzanne Schroer NRC/NRO/DSEA