MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation ML14162A4402014-06-12012 June 2014 Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1125200472011-09-19019 September 2011 Summary of Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11090A0892011-04-0505 April 2011 Approach for Assessing and Managing Fire Risk in (a)(4) ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides ML0933801182009-11-0505 November 2009 Public Meeting Slides from November 5, 2009 ML1029505812009-10-21021 October 2009 Bne Presentation, Buried Pipe Program by Jim Melchionna ML0917003212009-06-18018 June 2009 PSEG Slides from Drop-in Meeting, 6-18-2009 ML0910604822009-05-0505 May 2009 NRC Slides, for 5/5/09 Public Meeting ML0912605532009-05-0505 May 2009 PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0908200962009-03-16016 March 2009 PSEG Presentation to NRC Public Meeting 3/16/09 in Reference to Planned License Renewal Pre Application Activities for Salem and Hope Creek ML0902600612009-01-26026 January 2009 Slides from PSEG, Salem Public Mtg 01-21-09 ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0805605392008-03-0404 March 2008 Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0615902582006-06-0101 June 2006 Slides for Meeting Salem Service Water Simplification Project ML0613805762006-05-17017 May 2006 NRC Slides for the Public Meeting with PSEG to Discuss Annual Assessment of Salem and Hope Creek Stations for CY2005 ML0601700752005-12-13013 December 2005 CO2 System Review, December 13, 2005 ML0509601172005-03-15015 March 2005 3/15/05 Hope Creek Generating Station, Slide Presentation for Category 1 Meeting with PSEG Nuclear LLC, Regarding Future Application for Extended Power Uprate ML0521403342005-03-0909 March 2005 RIC 2005 Presentation - B3 - Michael Brothers - Objective Measures of Safety Culture ML0428005412004-09-0909 September 2004 Meeting Handouts on Salem Units 1 & 2 Full AST Implementation ML0605806162004-05-24024 May 2004 E-mail from M. Ferdas of USNRC to Various, Regarding PSEG Leadership Presentation on SCWE Results ML0407902612004-03-18018 March 2004 PSEG Slides Presented at Management Meeting with Region I to Discuss PSEG Assessment Plan for Work Environment Issues at Salem/Hope Creek ML0620201482004-03-16016 March 2004 E-mail from Vito to Jarriel, Pre-PSEG Meeting Discussion ML0403704282004-02-0909 February 2004 01/21-22/2004 - Attachments 7 and 8, Questions & Answers ML0208705842002-03-26026 March 2002 PSEG Nuclear LLC - NRC Annual Assessment Meeting Slides 2024-08-20
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML20104C0352020-04-15015 April 2020 Pseg/Nrc Pre-Submittal Meeting, Salem Expanded Scope Leak-Before-Break Amendment Request - April 15, 2020 ML19101A3982019-04-10010 April 2019 Annual Assessment Presentation Slides 2019 ML18156A0172018-05-30030 May 2018 Annual Assessment Meeting Slides 05-30-2018 ML18032A3312018-02-0101 February 2018 Presubmittal Meeting Regarding Inverters AOT Slides - February 1, 2018 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation ML14162A4402014-06-12012 June 2014 Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML1113601722011-05-10010 May 2011 NRC Slides for 2011 Aam, Salem/Hope Creek ML1107605812011-03-11011 March 2011 Slides- Audit of Salem'S Use of Westems Fatigue Software ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides ML1011004372010-04-19019 April 2010 NRC Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 ML1011004322010-04-19019 April 2010 PSEG Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 ML0933801182009-11-0505 November 2009 Public Meeting Slides from November 5, 2009 ML1029505812009-10-21021 October 2009 Bne Presentation, Buried Pipe Program by Jim Melchionna ML0917003212009-06-18018 June 2009 PSEG Slides from Drop-in Meeting, 6-18-2009 ML0910604822009-05-0505 May 2009 NRC Slides, for 5/5/09 Public Meeting ML0912605532009-05-0505 May 2009 PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0902600612009-01-26026 January 2009 Slides from PSEG, Salem Public Mtg 01-21-09 ML0811903682008-04-30030 April 2008 MSPI - How It Works ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0721103842007-07-25025 July 2007 USNRC Presentation Titled SRA Update. ML0615902582006-06-0101 June 2006 Slides for Meeting Salem Service Water Simplification Project ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0613805882006-05-17017 May 2006 Licensee (PSEG) Slides from Public Meeting with NRC to Discuss CY2005 Performance of Salem and Hope Creek Stations ML0613805762006-05-17017 May 2006 NRC Slides for the Public Meeting with PSEG to Discuss Annual Assessment of Salem and Hope Creek Stations for CY2005 ML0606005342006-02-0101 February 2006 Salem/Hc SCWE Presentation Handouts ML0601700752005-12-13013 December 2005 CO2 System Review, December 13, 2005 ML0533303322005-11-17017 November 2005 NRC Slide Presentation for SCWE Update Public Meeting 2024-08-20
[Table view] |
Text
NTTF 2.1 - Seismic Reevaluation - Salem GMRS June 12, 2014
2.1 Ground Motion Response Spectra (GMRS)
Purpose:
To present the basis for Salem GMRS submittal in March 2014 and discuss resolution and path-forward with FLEX Implementation and Expedited Seismic Evaluation Process (ESEP)
Basis for soil velocity profiles Basis for estimation of effective kappa Impact on FLEX Implementation Impact on ESEP Resolution Screening 2
2.1 Ground Motion Response Spectra (GMRS)
Current GMRS Values - EPRI v NRC 3
2.1 Ground Motion Response Spectra (GMRS)
Basis for Salem GMRS submitted March 2014 September 2013 submittal to the NRC provided three base case velocity profiles informed by Early Site Permit (ESP) and Salem stratigraphy Provided by EPRI in accordance with NRC endorsed SPID, EPRI 1025287 Soil Velocity Profile randomization in accordance with SPID Appendix B kappa in accordance with SPID Appendix B 4
2.1 Ground Motion Response Spectra (GMRS)
Basis for Soil Velocity Profiles ESP had a total of 16 borings
- 8 borings 3/4 mile north of Salem
- 8 borings 1/2 mile east of Salem Shear wave velocity (Vs) measurements made in four borings
- 2 borings 3/4 mile north of Salem (1 boring reached Potomac formation)
- 2 borings 1/2 mile east of Salem (1 boring reached Potomac formation)
Geologic stratification at the ESP site and Salem site is similar, however Salem layer thicknesses are slightly different 5
2.1 Ground Motion Response Spectra (GMRS)
Salem and ESP Site Boring Locations 6
2.1 Ground Motion Response Spectra (GMRS)
Basis for Soil Velocity Profiles Salem site specific layer thicknesses were used For shallow layers (<~450 ft depth), ESP shear wave velocity measurements for each layer were used, measurements taken approximately 1/2 - 3/4 mile away For deep layers (>~450 ft depth), no local Vs measurements were available; regional compressional wave measurements were used to infer Vs Since the velocity measurements are not located at the Salem site, 3 velocity profiles used to characterize uncertainties in Vs as recommended in SPID Section B-3.2 7
2.1 Ground Motion Response Spectra (GMRS)
Basis for epistemic uncertainties in Vs ln(mean Vs) = 0.20 for shallow (<~450 ft) layers based on ESP Vs values ( 1/2 - 3/4 mile away) - Tertiary and Cretaceous sands, silts, and clays - SPID Section B-3.2 ln(mean Vs) = 0.35 for deeper (>~450 ft) layers based on estimated Vs values from regional compression wave measurements used to infer Vs - Cretaceous Potomac formation - SPID Section B-3.2 8
2.1 Ground Motion Response Spectra (GMRS)
Basis for estimation of effective kappa NRC GI-199 Hazard Estimates (ML100270691) characterized Salem as a soil site in 2010 ESP site characterized as a soil site for the GMRS development EPRI Report 1023389, Evaluation of Seismic Hazards at Central and Eastern U.S. Nuclear Power Sites, 2011 characterized Salem as a deep soil site September 2013 submittal to the NRC provided soil profile that includes 1761 feet of soil as supported by Salem UFSAR Figure 2.5-5 EPRI GMRS total kappa value of 0.037s calculated using SPID Appendix B, Section B-5.1.3.1 for soil sites less than 3000 feet thick:
soil effective (ms) = 0.0605*H (thickness in meters)=0.031s At design loading levels, uncertainty in kappa accommodated by 2 models of shear modulus and hysteretic damping curves 9
2.1 Ground Motion Response Spectra (GMRS)
Seismic - Impact on FLEX (example) and ESEP Motor Control Centers (MCCs) installed in the plant to support primary FLEX electrical strategy Considered part of the ESEL, must meet ESEP criteria for RLGM ESEP Criteria - Section 4: Review Level Ground Motion Spectrum (RLGM) - The RLGM will be derived by linearly scaling the SSE by the maximum ratio of the GMRS/SSE between the 1 and 10 hz range (not to exceed 2 x SSE)
ESEP Criteria - Section 5: required to demonstrate that ESEL items have sufficient seismic capacity to meet or exceed the demand characterized by the RLGM.
GMRS level impacts FLEX and ESEP in the calculation of the required RLGM 10
2.1 Ground Motion Response Spectra (GMRS)
Seismic - GMRS Resolution and Screening GMRS Resolution - Use EPRI GMRS EPRI GMRS was performed in accordance with the SPID PSEG is proceeding with FLEX design using EPRI GMRS to meet NRC Order EA-12-049 for October 2014 FLEX implementation at Salem Unit 1 Proceeding with ESEP based on the EPRI GMRS to meet 10CFR50.54(f) requirement for ESEP report submittal by December 31, 2014 11
2.1 Ground Motion Response Spectra (GMRS)
Questions?
12
2.1 Ground Motion Response Spectra (GMRS)
Current GMRS Values - EPRI v NRC 13
2.1 Ground Motion Response Spectra (GMRS)
Seismic - GMRS Resolution and Screening Screening Salem UFSAR Section 3.7 requires all Seismic Category I Systems, Structures and Components (SSCs) to be evaluated to the SSE time history based on the El Centro earthquake (UFSAR Figure 3.7-2)
ESEP review of design calculations confirms Salem SSC design meets the SSE Time History SSE Time History Curve bounds the EPRI GMRS in the range of 1 to 10 Hz Salem screens out of risk evaluation 14
2.1 Ground Motion Response Spectra (GMRS)