ML18058B939

From kanterella
Revision as of 11:05, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1993 for Palisades Nuclear Plant.W/930805 Ltr
ML18058B939
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308100222
Download: ML18058B939 (5)


Text

"

consumers Power POWERING

/llllCHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 5, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, PJ Kl uskowski Reactor Engineer CC: DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC


------Document-Cont~oJ_, __ 950~22!3-5_!LO,lL_ __________ _

SMH93*17 ------------------

100013 9308100222 930731 .:. -_.

PDR R

ADOCK 05000255 :* .

PDR 0 . . A CMS' ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50~255---

DATE 07-31-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 930701-930731
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 5087.0 189494.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 330?.6 107035.2
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 0.0 3293.0 102499.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 8247903.0 220543875.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2699400.0 69589583.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2569273.0 65606353.0
19. UNIT SERVICE FACTOR 0.0% 64.7% 54.1%
20. UNIT AVAILABILITY FACTOR 0.0% 64. ?"-" 54.1%
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 69.2% 51.6%*
22. UNIT CAPACITY"FACTOR (USING DER NET) 0.0% 62.7% - 43.0%
23. UNIT FORCED OUTAGE RATE 0.0% 11.4% 29.9%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

A refueling outage is currently in progress.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: September 18, 1993
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

~------

____ [o.r:e_c_as_t --------~~!' i ev~----

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO -----"5~0~-2~5~5 UNIT Palisades DATE 08/05/93 COMPLETED BY _S_M_H-an~d'-'--l~ov=+i~t~s MONTH JULY 1993 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 0 26. 0
11. 0 27. 0
12. 0 28. 0
13. 0 29. 0 14 *. - 30. 0
15. 0
16. 0

_______ INSTRUCT IO~?__;_ _________________________________________________________ _

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

DOCKET NO 50-255 UNIT Pali sades DATE 08/05/93

-'J=U=L-'-+-=1~99=3'-------

COMPLETED BY SMHandlovits REPORT MONTH TELEPHONE (616)764-8913 1 UNIT SHUTDOWNS AND POWER REDUCTIONS I

I I

I No. Date I ,

Type Duration Reaso,n 2 Method of Licensee System Component Cause & Corrective I (Hours) Shutting Event Code 4 Code 6 Action to Down Reactor 3 Report # Prevent Recurrence I

I I

02 930604 s 744.0 c I

I I

1. I 2. 3. 4. 5.

F: Forced I Reason: Method: Exhibit G - Instructions Exhibit I - Same Source s: Scheduled II A-Equipment Failure (Explain)  !-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee I C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

I E-Operator Training & License I Examination I

F-Administrative I G-Operational Error (Explain)

! H-Other (Explain) j

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1993 The unit was shutdown for the entire month.