ML18065B070

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for Palisades Nuclear Plant
ML18065B070
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1996
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9611260196
Download: ML18065B070 (4)


Text

. -

consumers Power l'OWERIN&

M.ICHl&AN"S l'RO&REll Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 4, 1996 US Nuclear Regulatory Commission Document Control.Desk

'N.::shington, DC 20555..

  • LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255-Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades.Nuclear Plant for the month of October 1996.

. If you have any questions or concerns, please to contact me at (616) 764-3176.

Sincerely,

~

R Scott Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Comri1issKm Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P2&,204 Region Ill Administrator, USNRC

. Document Control, 950*22*35*1 O/L Cycle 12 Reports l

. ~;..

~.

i.

~.

(~--9-6L_j 1_1_2_6_0-19_6_9_6_1_0_3_1 ~, --r! ____ \\

i PDR ADOCK 05000255 1 :

\\

~

R '

PDR '-

,¥,

j i.~: -~-:_ -

.. -*... !*~*

"*'.*.. ~:.... *

_ *i A CMS' ENER6YCOMPANY

OPERATING STATUS:

l.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING. (GROSS MWe) 5; DESIGN ELECTRICAL RATING (NET MWe)

, 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 961Q01-961031 2530 811. 7 805

  • ~770
    • 730 DOCKET NO 50-255 DATE 11-01-96 COMPLETED.BY KAKobiata TELEPHONE* (616)76_4-2572 NOTES:
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM.NUMBERS. 3 THROUGH 7AND 7) SINCE ~T REPORT, GI\\,~ RE.A.30!-JS:

9.

POWER ~L*T9 WHICH RESTRICTED, IF._ANY (NET Mwe.):

-10. RJ;!ASONS FOR.RESTRICTIONS, IF ANY:

This Month

11. HOUR,$* IN REPORTING PERIOD
12. NUMBER.OF HOURS REACTOR WAS-CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE*

15.. UNIT RESERVE SHUTDOWN:HOURS

16. GROSS THERMAL ENERGY.GENERATED. (MWH)

.*11. GROSS ELECTRICAL ENERGY GENERATED (MWH)

18. NET ELECTRICAL ENERGY G)lliERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILAB~LITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT q>.PACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE 745.0 745. O*

745.0 1877294.0 602161' 572839 100.0%

100.0%

105.3%'

95.5%

G.O~

24: SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):'

A 51 day.refueling outage* is 'schedule_d to begin o'n November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DA~E OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weig~ted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 7320.0 6961. 0 6935".l 17264510.2 5522536 5251618 94.7%

94. 7%. '
98. 3%,

89.J.,%

S.3~

Fo~ecast cumulative 218007_. 0 127912.3*

123089.8..

271383200.7 85998790 81205037

56. 5%"

56.5%

54.7%*

46.3%

27.7%

Achieved*

e.
  • I

SUMMARY

OF OPERATING EX.PERIENCE FOR OCTOBER 1996 The Unit operated.at 100 'percent power for, the entire month.

.AVERAGE DAILY UNIT POWER LEVEL MONTH

1.
2.
3.
4.

5:

6.
7.

8,

9.
10.
11.
12.
13.
14.
15.
16.

October AVERAGE DAILY POWER LEVE!-

(MWe Net).

763 760 773 772 771 763 765 772 773 772.

774 768 765 770 l~**

766 763 INSTRUCTIONS:

DAY

. 1~.

18.
19.
20.
21.
22.
23.
24.

25:

26.
27.

28..

29.
30.
31.

DOCKET NO 50-255 UNIT Palisades DATE 11/04/96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL (MWe Net) 762 770 772 773 770 768 772 772 771 767 764 771 771 769 774 On this format, iist the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.