ML18065B070

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for Palisades Nuclear Plant.W/961104 Ltr
ML18065B070
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1996
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9611260196
Download: ML18065B070 (4)


Text

.,. -

consumers Power l'OWERIN&

M.ICHl&AN"S l'RO&REll Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 4, 1996 US Nuclear Regulatory Commission Document Control .Desk

'N.::shington, DC 20555 ..

  • LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255-Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades .Nuclear Plant for the month of October 1996.

. If you have any questions or concerns, please to contact me at (616) 764-3176.

Sincerely,

~

R Scott Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Comri1issKm Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P2&,204 Region Ill Administrator, USNRC

. Document Control, 950*22*35*1 O/L Cycle 12 Reports l

~.

. ~; ..i.

~. (~--9-6L_j1_1_2_6_0-19_6_9_6_1_0_3_1~, --r!____\

i

~

PDR R'

ADOCK 05000255 1 :

. _. _- PDR '-

\

,¥,

j i.~: -~-:_ - A CMS' ENER6YCOMPANY

.. -*. ..!*~*

"*'.* .~: .... *

_ *i

OPERATING DATA REPORT DOCKET NO 50-255 DATE 11-01-96 COMPLETED.BY KAKobiata TELEPHONE* (616)76_4-2572 OPERATING STATUS:

NOTES:

l. UNIT NAME Palisades
2. REPORTING PERIOD: 961Q01-961031
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING. (GROSS MWe) 811. 7 5; DESIGN ELECTRICAL RATING (NET MWe) 805

, 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) *~770

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM.NUMBERS. 3 THROUGH 7AND 7) SINCE ~T REPORT, GI\,~ RE.A.30!-JS:
9. POWER ~L*T9 WHICH RESTRICTED, IF._ANY (NET Mwe.):

-10. RJ;!ASONS FOR .RESTRICTIONS, IF ANY:

This Month Yr-to-Date cumulative

11. HOUR,$* IN REPORTING PERIOD 745.0 7320.0 218007_. 0
12. NUMBER.OF HOURS REACTOR WAS-CRITICAL 745. O* 6961. 0 127912.3*
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE* 745.0 6935".l 123089.8..

15 .. UNIT RESERVE SHUTDOWN:HOURS

16. GROSS THERMAL ENERGY.GENERATED. (MWH) 1877294.0 17264510.2 271383200.7

.*11. GROSS ELECTRICAL ENERGY GENERATED (MWH) 602161' 5522536 85998790

18. NET ELECTRICAL ENERGY G)lliERATED (MWH) 572839 5251618 81205037
19. UNIT SERVICE FACTOR 100.0% 94.7% 56. 5%"
20. UNIT AVAILAB~LITY FACTOR 100.0% 94. 7% . ' 56.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) '

105.3%' 98. 3%, 54.7%*

22. UNIT q>.PACITY FACTOR (USING DER NET) 95.5% 89.J.,% 46.3%
23. UNIT FORCED OUTAGE RATE G.O~ S.3~ 27.7%

24: SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):'

A 51 day .refueling outage* is 'schedule_d to begin o'n November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DA~E OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Fo~ecast Achieved*

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weig~ted Average (635 MWe used as MDC Net prior to October 1985)
  • I e.

SUMMARY

OF OPERATING EX.PERIENCE FOR OCTOBER 1996 The Unit operated.at 100 'percent power for, the entire month.

.AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 11/04/96 COMPLETED BY KAKobiata MONTH October TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVE!- DAY AVERAGE DAILY POWER LEVEL (MWe Net). (MWe Net)

1. 763 . 1~. 762
2. 760 18. 770
3. 773 19. 772
4. 772 20. 773 5: 771 21. 770
6. 763 22. 768
7. 765 23. 772 8, 772 24. 772
9. 773 25: 771
10. 772. 26. 767
11. 774 27. 764
12. 768 28 .. 771
13. 765 29. 771 l~**
14. 770 30. 769
15. 766 31. 774
16. 763 INSTRUCTIONS:

On this format, iist the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.