ML18066A231

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1998 for Palisades Nuclear Plant
ML18066A231
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/30/1998
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18066A230 List:
References
NUDOCS 9807150164
Download: ML18066A231 (4)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 5Q-255 UNIT P;;ili:i!o:!Q~li DATE 07L01L98 COMPLETED BY EATreptow MONTH June TELEPHONE 16161764-2057 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

0

17.

763

2.

0

18.

76Q

3.

0

19.

765

4.

0

20.

761

5.

0

21.

761

6.

0

22.

761

7.

2

23.

764

8.

130

24.

757

9.

115

25.

751

10.

26

26.

765

11.

339

27.

764

12.

666

28.

764

13.

746

29.

762

14.

757

30.

766

15.

756

31.
16.

759 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

9807150164 980709 PDR ADOCK 05000255 R

PDR

~- ------ ---- ------ -------

_)

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1998 The Plant began the month shutdown for the 1998 refueling outage. The reactor was taken critical on June 3 at 14:29. The plant was brought on-line at 22:57 on June 7 to end the 1998 refueling outage. The plant was taken off-line at 14:52 on June 9 due to turbine vibrations. The reactor remained critical the entire outage, and the plant was again brought on-line at 16:39 on June 10, and achieved full power on June 14. The plant ended the month at full power.

REPORT MONTH --"'JU"'"N""E~1,.,:9""'98,,___

No.

Date

2.

980424

3.

980609

1.

F: Forced S: Scheduled Type' Duration Reason2 (Hours) s 167.0 c

s 25.8 B

2.

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

Licensee Event Report#

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

5.

Cause & Corrective Action to Prevent Recurrence Continuation of refueling outage; completed on 617198.

DOCKET NO

.UNIT

.DATE COMPLETED BY

.TELEPHONE Balance turbine to reduce vibration; reactor critical entire outage.

Exhibit I - Same Source 50-255 Palisades 07/01/98 EA Treptow 616-764-2057

OPERATING STATUS:

1. UNIT NAME
2. REPORTING PERIOD:
3. LICENSED THERMAL POWER (MWt)
4. NAMEPLATE RATING (GROSS MWe)
5. DESIGN ELECTRICAL RATING (NET MWe)
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

OPERATING DATA REPORT Palisades 980601-980630 2530 811. 7 805 770

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10 REASONS FOR RESTRICTIONS, IF ANY:

11 HOURS IN REPORTING PERIOD 12 NUMBER OF HOURS REACTOR WAS CRITICAL 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 NET ELECTRICAL ENERGY GENERATED (MWH) 19 UNIT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 UNIT CAPACITY FACTOR (USING MDC NET) 22 UNIT CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE This Month 720. 0 657.5 527.3 1210530.6 37 964 9 359082 73.2%

73.2%

68.3%

62.0%

15.4%

24 SHUTDOWNS.SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Yr-to-Date 4343. 0 3347.1 3193.0 7719134. 8 2502298 2377862 73.5%

73.5%

75.0%

68.0%

3.9%

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 50-255 DATE 7-1-98 COMPLETED BY EATreptow TELEPHONE (616)764-2057 NOTES:

Cumulative 232574.0 139316.6 134134.2 298399938.9 94673432 89449078

57. 7%
57. 7%
56. 1%
  • 47.8%

26.5%

Achieved