ML18067A670

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1997 for Palisades Nuclear Plant
ML18067A670
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/31/1997
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9709090011
Download: ML18067A670 (5)


Text

,Y A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 September 3, 1997 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20556 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 I

Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of August 1997.

If you have any questions or concerns, please to contact me at (616) 764-3179.

Sincerely, R.S. Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml t3WJorgE=nsen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, lJSNRC Document Control, 950"22"35"10/L Cycle 1 3 Reports

(~~--,;9~7~0~9~0~9~0~0~1~1~9;7~0~83==1-=--~1u--~~~-)

PDR AQOCK 05000255 I

R PDR I I

~.

~. n*1:\\1. u 1...r:1

\\J 0 "3 '~

1 r

HUI\\\\ U\\111\\\\\\\\ \\\\Ill \\U\\I \\\\\\Ill Ill 1\\\\1 \\

6 7

1 F

I

i*;

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 09/03/97 COMPLETED BY KAKobiata MONTH August TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 1.

758

17.

747

2.

748

18. -

757

3.

744

19.

756

4.

745

20.

756

5.

761

21.

753

6.

762

22.

757

7.

758 2:3.

760

8.

755

24.

753

9.

750

25.

755

10.

746*

26.

751

11.

753

27.

746

12.

750

28.

749

13.

752

29.

755

. 14.

759

30.

752

15.

745

31.

749

16.

738 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR AUGUST 1997 The Unit operated at 100 percent power the entire month.

OPBRATING STATUS:

1.

UNIT NAMB

2.

RBPORTING PBRIOD:

3.

LICBNSBD THBRMAL POWBR (MWt)

4.

NAMBPLATB RATING (GROSS MWe)

5.

DBSIGN BLBCTRICAL RATING (NBT MWe)

6.

MAXIMUM DBPBNDABLB CAPACITY (GROSS MWe)

7.

MAXIMUM DBPBNDABLB CAPACITY (NBT MWe)

OPBRATING DATA RBPORT Palisades 970801-970831 2530 Bll. 7 BOS

    • 770
    • 730 B.

IP CHANGBS OCCUR IN CAPCITY RATINGS (ITBM NUMBSRS 3 THROUGH 7AND 7) SINCB LAST RBPORT, GIVB RBASONS:

9.

POWBR LBVBL TO WHICH RBSTRICTBD, IP ANY (NBT MWe):

10. RBASONS FOR RBSTRICTIONS, IF ANY:
11. HOURS IN RBPORTING PBRIOD
12. NUMBBR OP HOURS RBACTOR WAS CRITICAL
13. RBACTOR RBSBRVB'SHUTDOWN HOURS
14. HOURS GBNBRATOR ON-LINB
15. UNIT RBSBRVB SHUTDOWN HOURS
16. GROSS THBRMAL BNBRGY GBNBRATBD (MWH)
17. GROSS BLBCTRICAL. BNBRGY GBNBRATBD (MWH) lB*. NBT BLB.CTRICAL BNBRGY GBNBRATBD (MWH)
19. UNIT SBRVICB FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NBT)
22. UNIT CAPACITY FACTOR (USING DBR NBT) 23.. UNIT *FORCBD OUTAG.". :".ATE This Month 744.0 744.0 744.0 1875057.6 SBBB50 559711 100.0t 100.0t 103.1' 93.St
i.ot
24. SHUTDOWNS SCHBDULBD.OVBR THB NBXT 6 MONTHS (TY.PB, DATB AND DURATION OP BACH):
25. IF SHUTDOWN AT BND OF RBPORT PBRIOD, BSTIMATBD DATB OP STARTUP:
26. UNITS IN TBST STATUS (PRIOR TO COMMBRCIAL OPBRATION):

INITIAL CRITICALITY INITIAL BLBCTRICITY COMMBRCIAL OPBRATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 5831. 0 5305. 2 5165.2 12750907.1 4058465 3857455 BB.6' BB.6' 90.6t B2.2t ll.4t Pore cast DOCKBT NO 50-255 DATB 7-2-97 COMPLBTBD BY KAKobiata TBLBPHONB (616)764-2572 NOTBS:

Cumulative 225302.0 133402.4 128390.7 284354905.7 90125200 85125215

57. O\\*

57.0t 55.3t*

46. 9' 27.1' Achieved

REPORT MONTH AUGUST 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type1 Duration Reason2 Method of Shutting Down Reactor Licensee System Code4 Component Code5 Cause & Corrective (Hours)

NONE

1.
2.

F: Forced Reason S: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

3.

Method:

1-Manual

4.

Event Report#

Exhibit G - Instructions for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)

(NUREG-0161)

Action to Prevent Recurrence

5.

Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DATE 09/04/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572