,Y A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 September 3, 1997 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20556 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 I
Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of August 1997.
If you have any questions or concerns, please to contact me at (616) 764-3179.
Sincerely, R.S. Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml t3WJorgE=nsen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, lJSNRC Document Control, 950"22"35"10/L Cycle 1 3 Reports
(~~--,;9~7~0~9~0~9~0~0~1~1~9;7~0~83==1-=--~1u--~~~-)
PDR AQOCK 05000255 I
R PDR I I
~.
~. n*1:\\1. u 1...r:1
\\J 0 "3 '~
1 r
HUI\\\\ U\\111\\\\\\\\ \\\\Ill \\U\\I \\\\\\Ill Ill 1\\\\1 \\
6 7
1 F
I
i*;
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 09/03/97 COMPLETED BY KAKobiata MONTH August TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1.
758
- 17.
747
- 2.
748
- 18. -
757
- 3.
744
- 19.
756
- 4.
745
- 20.
756
- 5.
761
- 21.
753
- 6.
762
- 22.
757
- 7.
758 2:3.
760
- 8.
755
- 24.
753
- 9.
750
- 25.
755
- 10.
746*
- 26.
751
- 11.
753
- 27.
746
- 12.
750
- 28.
749
- 13.
752
- 29.
755
. 14.
759
- 30.
752
- 15.
745
- 31.
749
- 16.
738 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR AUGUST 1997 The Unit operated at 100 percent power the entire month.
OPBRATING STATUS:
- 1.
UNIT NAMB
- 2.
RBPORTING PBRIOD:
- 3.
LICBNSBD THBRMAL POWBR (MWt)
- 4.
NAMBPLATB RATING (GROSS MWe)
- 5.
DBSIGN BLBCTRICAL RATING (NBT MWe)
- 6.
MAXIMUM DBPBNDABLB CAPACITY (GROSS MWe)
- 7.
MAXIMUM DBPBNDABLB CAPACITY (NBT MWe)
OPBRATING DATA RBPORT Palisades 970801-970831 2530 Bll. 7 BOS
- 770
- 730 B.
IP CHANGBS OCCUR IN CAPCITY RATINGS (ITBM NUMBSRS 3 THROUGH 7AND 7) SINCB LAST RBPORT, GIVB RBASONS:
- 9.
POWBR LBVBL TO WHICH RBSTRICTBD, IP ANY (NBT MWe):
- 10. RBASONS FOR RBSTRICTIONS, IF ANY:
- 11. HOURS IN RBPORTING PBRIOD
- 12. NUMBBR OP HOURS RBACTOR WAS CRITICAL
- 13. RBACTOR RBSBRVB'SHUTDOWN HOURS
- 14. HOURS GBNBRATOR ON-LINB
- 15. UNIT RBSBRVB SHUTDOWN HOURS
- 16. GROSS THBRMAL BNBRGY GBNBRATBD (MWH)
- 17. GROSS BLBCTRICAL. BNBRGY GBNBRATBD (MWH) lB*. NBT BLB.CTRICAL BNBRGY GBNBRATBD (MWH)
- 19. UNIT SBRVICB FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NBT)
- 22. UNIT CAPACITY FACTOR (USING DBR NBT) 23.. UNIT *FORCBD OUTAG.". :".ATE This Month 744.0 744.0 744.0 1875057.6 SBBB50 559711 100.0t 100.0t 103.1' 93.St
- i.ot
- 24. SHUTDOWNS SCHBDULBD.OVBR THB NBXT 6 MONTHS (TY.PB, DATB AND DURATION OP BACH):
- 25. IF SHUTDOWN AT BND OF RBPORT PBRIOD, BSTIMATBD DATB OP STARTUP:
- 26. UNITS IN TBST STATUS (PRIOR TO COMMBRCIAL OPBRATION):
INITIAL CRITICALITY INITIAL BLBCTRICITY COMMBRCIAL OPBRATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 5831. 0 5305. 2 5165.2 12750907.1 4058465 3857455 BB.6' BB.6' 90.6t B2.2t ll.4t Pore cast DOCKBT NO 50-255 DATB 7-2-97 COMPLBTBD BY KAKobiata TBLBPHONB (616)764-2572 NOTBS:
Cumulative 225302.0 133402.4 128390.7 284354905.7 90125200 85125215
- 57. O\\*
57.0t 55.3t*
- 46. 9' 27.1' Achieved
REPORT MONTH AUGUST 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.
Date Type1 Duration Reason2 Method of Shutting Down Reactor Licensee System Code4 Component Code5 Cause & Corrective (Hours)
NONE
- 1.
- 2.
F: Forced Reason S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- 3.
Method:
1-Manual
- 4.
Event Report#
Exhibit G - Instructions for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)
Action to Prevent Recurrence
- 5.
Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DATE 09/04/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572