Monthly Operating Rept for Jul 1993 for Palisades Nuclear Plant
ML18058B939
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308100222
Download: ML18058B939 (5)


Text

"

consumers Power POWERING

/llllCHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 5, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, PJ Kl uskowski Reactor Engineer CC:

DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC


------Document-Cont~oJ_, __ 950~22!3-5_!LO,lL_ __________ _

SMH93*17 100013 PDR ADOCK 05000255 :*

9308100222 930731

.:.0-_.

R PDR A CMS' ENERGY COMPANY

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 930701-930731 2530.0 811. 7 805.0

    • 770
    • 730 DOCKET NO 50~255---

DATE 07-31-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:

8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY"FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, A refueling outage is currently in progress.

This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0%

0.0%

0.0%

0.0%

0.0%

DATE AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

September 18, 1993

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Yr-to-Date Cumulative 5087.0 189494.0 330?.6 107035.2 3293.0 102499.6 8247903.0 220543875.0 2699400.0 69589583.0 2569273.0 65606353.0 64.7%

54.1%

64. ?"-"

54.1%

69.2%

51.6%*

62.7% -

43.0%

11.4%

29.9%


~------

____ [o.r:e_c_as_t --------~~!' i ev~----

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO -----"5~0~-2~5~5 UNIT Palisades DATE 08/05/93 COMPLETED BY

_S_M_H-an~d'-'--l~ov=+i~t~s MONTH JULY 1993 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

0

17.

0

2.

0

18.

0

3.

0

19.

0

4.

0

20.

0

5.

0

21.

0

6.

0

22.

0

7.

0

23.

0

8.

0

24.

0

9.

0

25.

0

10.

0

26.

0

11.

0

27.

0

12.

0

28.

0

13.

0

29.

0 14 *.

- 30.

0

15.

0

16.

0

_______ INSTRUCT IO~?__;_ _________________________________________________________ _

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH -'J=U=L-'-+-=1~99=3'-------

No.

Date 02

1.

F:

s:

930604 Forced Scheduled 1

I I

I I

I,

Type I

I I

I s I

I I

I 2.

I I

I I

I I I I

Duration Reaso,n2 (Hours) 744.0 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

3.

Method:

!-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Pali sades 08/05/93 SMHandlovits (616)764-8913 j

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1993 The unit was shutdown for the entire month.