ML18066A270

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr
ML18066A270
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1998
From: Hawn R, Treptow E
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9808120076
Download: ML18066A270 (5)


Text

A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 August 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DAT A DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1998.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950

  • 22*35*1 O/L Cycle 14 Reports

,-~-"-1 -~-*~~~1'k~o~76 980731 .

i PDR ADOCK 05000255

, R PDR 1

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO f!Q-255 UNIT ei:!li::rnd~~

DATE QBLQJL9B COMPLETED BY . EATreptow MONTH July TELEPHONE 1616l764-2Q57

'DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

' 1. 772 17. 770

2. 775 18. 771
3. 765 19. 761
4. 766 20. 760
5. 779 21. 474
6. 773 22. 2
7. 764 23. 285
8. 767 24. 493
9. 768 25. 515
10. 770 26. 482
11. 775 27. 641
12. 775 28. 746
13. 772 29. 752
14. 764 30. 754
15. 761 31. 766
16. 762 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole m~gawatt.

  • \~I

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1998 The Plant began the month at full power. The reactor was manually scrammed from full power at 14:53 on July 21 due to a main feedwater pump trip. The reactor was brought critical at 06:59 on July 22, and the generator was brought on-line at 22:22 on July 22. The plant operated at a reduced power level during troubleshooting and maintenance of the main feedwater pump. The plant reached full power on July 27 and ended the month at full power.

REPORTMONTH~~~JU~L~Y~1~99~8'--~ DOCKET NO 50-255

.UNIT Palisades

. ,DATE 08/03198 COMPLETED BY EATreptow

. .TELEPHONE 616-764-2057 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type, Duration Reason2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code4 Code5 Action to Down Reactor Report#

  • Prevent Recurrence
4. 980721 F 16.1 A 2 Main feedwater pump trip and subsequent manual reactor scram from full power.
1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhi~it I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

..... '. ~.)

OPERATING DATA REPORT

  • DOCKET NO 50-255 DATE 8-3-98 COMPLETED BY EATreptow TELEPHONE (616)764-2057 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 980701-980731
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811.7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10 REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative 11 HOURS IN REPORTING PERIOD. 744.0 5087.0 233318.0 12 NUMBER OF HOURS REACTOR WAS CRITICAL 727. 9 4075.0 140044.5 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 712.5 3905.5 134846.7 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 1698732.5 9417867.2 300098671. 4 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 538873 3041171 95212305 18 NET ELECTRICAL ENERGY GENERATED (MWH) 510706 2888568 89959784 19 UNIT SERVICE FACTOR 95.8% 76.8% 57.8%

20 UNIT AVAILABILITY FACTOR 95.8% 76.8% 57.8%

21 UNIT CAPACITY FACTOR (USING MDC NET) 94.0% 77.8% 56. 2%

  • 22 UNIT CAPACITY FACTOR (USING DER NET) 85.3% 70.5% 47.9%

23 UNIT FORCED OUTAGE RATE 4.2% 4.0% 26. 4%

24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL* CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)