Monthly Operating Rept for July 1998 for Palisades Nuclear Plant
ML18066A270
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1998
From: Hawn R, Treptow E
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9808120076
Download: ML18066A270 (5)


Text

A CMS Energy Company August 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DAT A DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1998.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950

  • 22*35*1 O/L Cycle 14 Reports

,-~-"-

1

-~-*~~~1'k~o~76 980731 i

PDR ADOCK 05000255 R

PDR 1

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO f!Q-255 UNIT ei:!li::rnd~~

DATE QBLQJL9B COMPLETED BY. EATreptow MONTH July TELEPHONE 1616l764-2Q57

'DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

' 1.

772

17.

770

2.

775

18.

771

3.

765

19.

761

4.

766

20.

760

5.

779

21.

474

6.

773

22.

2

7.

764

23.

285

8.

767

24.

493

9.

768

25.

515

10.

770

26.

482

11.

775

27.

641

12.

775

28.

746

13.

772

29.

752

14.

764

30.

754

15.

761

31.

766

16.

762 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole m~gawatt.

\\~I

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1998 The Plant began the month at full power. The reactor was manually scrammed from full power at 14:53 on July 21 due to a main feedwater pump trip. The reactor was brought critical at 06:59 on July 22, and the generator was brought on-line at 22:22 on July 22. The plant operated at a reduced power level during troubleshooting and maintenance of the main feedwater pump. The plant reached full power on July 27 and ended the month at full power.

REPORTMONTH~~~JU~L~Y~1~99~8'--~

No.

Date

4.

980721

1.

F: Forced S: Scheduled

Type, Duration Reason2 (Hours)

F 16.1 A

2.

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor 2

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

Licensee Event Report#

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

5.

Cause & Corrective Action to

  • Prevent Recurrence DOCKET NO

.UNIT

,DATE COMPLETED BY

.TELEPHONE Main feedwater pump trip and subsequent manual reactor scram from full power.

Exhi~it I - Same Source 50-255 Palisades 08/03198 EA Treptow 616-764-2057

'. ~.)

OPERATING STATUS:

1. UNIT NAME
2. REPORTING PERIOD:
3. LICENSED THERMAL POWER (MWt)

OPERATING DATA REPORT Palisades 980701-980731 2530

4. NAMEPLATE RATING (GROSS MWe) 811.7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10 REASONS FOR RESTRICTIONS, IF ANY:

11 HOURS IN REPORTING PERIOD.

12 NUMBER OF HOURS REACTOR WAS CRITICAL 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 NET ELECTRICAL ENERGY GENERATED (MWH) 19 UNIT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 UNIT CAPACITY FACTOR (USING MDC NET) 22 UNIT CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE This Month 744.0 727. 9 712.5 1698732.5 538873 510706 95.8%

95.8%

94.0%

85.3%

4.2%

24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Yr-to-Date 5087.0 4075.0 3905.5 9417867.2 3041171 2888568 76.8%

76.8%

77.8%

70.5%

4.0%

Forecast INITIAL* CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 50-255 DATE 8-3-98 COMPLETED BY EATreptow TELEPHONE (616)764-2057 NOTES:

Cumulative 233318.0 140044.5 134846.7 300098671. 4 95212305 89959784 57.8%

57.8%

56. 2%
  • 47.9%
26. 4%

Achieved