ML18066A365

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr
ML18066A365
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1998
From: Handlovits S, Hawn R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901130043
Download: ML18066A365 (5)


Text

A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 January 5, 1999 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of December 1998.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely,

.R~~

R. S. Hawn Reactor Engineering Supervisor CC: AMDavis, Palisades GABaustian, Palisades Senior Resident Inspector, Palisades

  • DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RDWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204 Region Ill Administrator, USNRC Pal. Eng. Records Center, 950*22*35*10/L Cycle 14 Reports (SMH 99*02) *

..-... , r1,()

.. *J \_. v .

'..l ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/05/99 COMPLETED BY SMHandlovits MONTH Pecember TELEPHONE (616)764-3262 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 789 17. 0
2. 786 18. 0
3. 783 19. 0
4. 780 20. 0
5. 784 21. 0
6. 786 22. 0
7. 792 23. 0
8. 792 24. 0
9. 791 25. 0
10. 791 26. 0
11. 791 27. 0
12. 791 28. 0
13. 663 29. 0
14. 0 30. 0
15. 0 31. 0
16. 0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1998 The Plant began the month of December at 99.9% power. On December 13 at approximately 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, the Plant began to reduce power for a forced outage to fix an oil leak on primary coolant pump P-50D.

The Plant was off-line at 2158 hours0.025 days <br />0.599 hours <br />0.00357 weeks <br />8.21119e-4 months <br /> and subcritical at 2204 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.38622e-4 months <br />. The Plant remained shutdown for the rest of the month due to the oil leak, problems with the safeguards transformer, and a leak that developed on one of the control rod drive mechanisms.

REPORTMONTH~~=D=E=C=E=M=B=ER~19=9=8~~ DOCKET NO 50-255 UNIT Palisades DATE 01/05/99 COMPLETED BY SMHandlovits TELEPHONE 616-764-3262 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason2 Method of Licensee System. Compo*nent Cause & Corrective 5

(Hours) Shutting Event Code' Code Action to Down Reactor Report# Prevent Recurrence 6 12113/98 F 434.0 A Primary Coolant Pump P-50D Oil Leak

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATING DATA REPORT

  • DOCKET NO DATE 50-255 1-5-99 COMPLETED BY SMHandlovi ts TELEPHONE (616)764-3262 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 981201-981231
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10 REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative 11 HOURS IN REPORTING PERIOD 744.0 8760.0 236991.0 12 NUMBER OF HOURS REACTOR WAS CRITICAL 310.1 7314.l 143283. 6 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 310.0 7144. 5 138085. 7 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 782884.8 17537999.0 308218803.2 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 254937 5670452 97841586  :\'

18 NET ELECTRICAL ENERGY GENERATED (MWH) 242864 5390584 92461800 19 UNIT SERVICE FACTOR 41. 7% 81. 6% 58.3%

20 UNIT AVAILABILITY FACTOR 41. 7% 81. 6% 58.3%

21 UNIT CAPACITY FACTOR (USING MDC NET) 44. 7% 84.3% 56. 8%

  • 22 UNIT CAPACITY FACTOR (USING DER NET) 40.6% 76. 4% 48.5%

23 UNIT FORCED OUTAGE RATE 58.3% 7. 7% 26.1%

24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: January 6, 1999 26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)