l
'Consumers~
A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star.Memorial Highway Covert, Ml 49043 February 3, 1998 US Nuclear Regulatory Commission Docun1<:ni: Conti'.JI Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of January 1998.
If.you have any questions or concerns, please contact me at (616) 764-3179.
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KA Toner, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950"22"35"10/L Cycle 1 3 Reports 9802110096 980131 PDR ADOCK 05000255 R
/J I*~~~
~*
I
- 111111111111111111111111111111111 Ill llll I
5 1
F 0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades.
DATE 02/03/98 COMPLETED BY KAKobiata MONTH January TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
789
- 17.
790
- 2.
788
- 18.
790
- 3.
786
- 19.
790
- 4.
788
- 20.
790
- 5.
. 784
- 21.
791
- 6.
789
- 22.
790
- 7.
788
- 23.
790
- 8.
789
- 24.
789
- 9.
789
- 25.
791
- 10.
790
- 26.
787
- 11.
790
- 27.
785
- 12.
789
- 28.
785
- 13.
790
- 29.
787
- 14.
791
- 30.
790
- 15.
789
- 31.
790
- 16.
791 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR JANUARY 1998 The Unit maintained at essentially 100 percent power the entire month. Power was reduced by approximately 112 percent January 26 through 28 to support Auxiliary Feedwater pump work and testing.
REPORT MONTH JANUARY 1998 UNIT SHUTDOWNS AND POWER REDUCTIONS No.
Date Type' Duration Reason2 Method of Shutting Licensee System Code*
Component Code5 Cause & Corrective Action to (Hours)
NONE
- 1.
- 2.
F: Forced Reason S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restrictio E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Down Reactor Event Report#
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Prevent Recurrence
- 5.
Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DATE 02103198 COMPLETED BY KAKobiata TELEPHONE 616-764-2572
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 980101-980131 2530 811. 7 805
- 770
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. i.JNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET) 23.' UNI'.!:' FORCED OUT~GE :Lb.TE This Month 744.0 744. 0 744.0 1873928.9 615918 586840 100.0t 100.0t 108.0t 98.0t O.Ot
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Refueling Outage 4/25/98 39 days long
- Maintenance Outage 2/6/98 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />s* l.ong
- 25. IF SHUTDOWN AT END OF REPORT.* PERIOD, ESTIMATED DATE OF STARTU
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- weighted Average (635 MWe used as MDC Net* prior to October 1985)
Yr-to-Date 744.0 744.0 744.0 1873928.9 615918 586840 100.0t 100.0t 108.0t 98.0t o.ot Forecast DOCKET NO 50-255 DATE 2-3-98 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:
Cumulative 228975.0 136713. 6 131685.3 292554733.l 92787052 87658056 57.5\\
57.5\\
55.9\\*
47.6\\
26.8\\
Achieved