consumers Power POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 2, 1996 US Nuclear Regulatory Commission Docum:mt Control Dask
- Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 '
Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1996.
If you have any questions or concerns, please to contact me at (616) 764-2013.
Sincerely, AL Williams Reactor Engineering Supervisor CC: RA Vincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, t;~,,sing, M!
JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 O/L Cycle 12 Reports __.
9607090232 960630 PDR * *ADOCK 05000255 ',
R *.*
OPERATING STATUS:
- l.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 960601-960630 2530 811. 7 805
- 770
- 730 DOCKET NO -
50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:
- 7.
- 8.
IF cHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE 1<£ASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month ll. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL,ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CJl.PAC!TY FACTOR (USING DE."!. NET) 720.0 720.0 720.0 1750199.5 555739 527628 100.0l 100.0l 100.4' 91.0t -
23'. UNIT FORCED OUTAGE RATE
- 0. Ol
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
A 51 day refueling outage is scheduled to begin on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 4367.0 4046.3 4037.6 10005002.2 3226704 3069758 92.5\\
92.5\\
96.3\\
97.3\\..
7.5\\
Forecast
. CUmulative 215054.0 124997.6 120192.3 264123692.7 83702958 79023177 55.9\\
55.9\\
54.0l*
45.6\\
28.1' Achieved
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07102196 COMPLETED BY KAKobiata MONTH June TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
770
- 17.
758
- 2.
770
- 18.
757
- 3.
773
- 19.
760
- 4.
774
- 20.
760
- 5.
771
- 21.
711
- 6.
765
- 22.
296
/ 7.
767
- 23.
362
- 8.
770
- 24.
730
- 9.
765
- 25.
772
- 10.
764
- 26.
770
- 11.
765
- 27.
765
- 12.
768
- 28.
761
- 13.
760
- 29.
753
- 14.
762
- 30.
755
- 15.
764
- 31.
- 16.
766
)
- INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR JUNE 1996 The Unit decreased power to 40% at 0530 on June 22 to identify and plug condenser tube leaks. Full power was resumed at 2100 on June 24..
REPORT MONTH JUNE 1996 No.
Date 3
6121/96
- 1.
F: Forced S: Scheduled UNIT SHUTDOWNS AND POWER REDUCTIONS
- Type, Duration Reason2
{Hours) 81 B
- 2.
- 3.
Method of*
Licensee Shutting Event Down Reactor3 Report #
4 {Powr derate To40%)
- 4.
- 5.
System Code' Component Code5 Reason Method:
Exhibit G - Instructions Exhibit I - Same Source A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-0ther {Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error {Explain)
H-Other (Explain) for Preparation of Data Entry Sheets for Licensee Event Report {LER) File
{NURE~161)
Cause & Corrective Action to Prevent Recurrence Derate due to condenser Tube leak identification and plugging.
. I i
DOCKET NO 50-255 UNIT Palisades DATE 07/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572