Monthly Operating Rept for June 1996 for Palisades Nuclear Plant
ML18065A812
Person / Time
Site: Palisades 
Issue date: 06/30/1996
From: Kobiata K, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607090232
Download: ML18065A812 (5)


Text

consumers Power POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 2, 1996 US Nuclear Regulatory Commission Docum:mt Control Dask

Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1996.

If you have any questions or concerns, please to contact me at (616) 764-2013.

Sincerely, AL Williams Reactor Engineering Supervisor CC: RA Vincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, t;~,,sing, M!

JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 O/L Cycle 12 Reports __.

9607090232 960630 PDR * *ADOCK 05000255 ',

R *.*

PDR A CMS' ENERGY COMPANY

OPERATING STATUS:

l.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 960601-960630 2530 811. 7 805

    • 770
    • 730 DOCKET NO -

50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

7.
8.

IF cHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE 1<£ASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :

10. REASONS FOR RESTRICTIONS, IF ANY:

This Month ll. HOURS IN REPORTING PERIOD

12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL,ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CJl.PAC!TY FACTOR (USING DE."!. NET) 720.0 720.0 720.0 1750199.5 555739 527628 100.0l 100.0l 100.4' 91.0t -

23'. UNIT FORCED OUTAGE RATE

0. Ol
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

A 51 day refueling outage is scheduled to begin on November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 4367.0 4046.3 4037.6 10005002.2 3226704 3069758 92.5\\

92.5\\

96.3\\

97.3\\..

7.5\\

Forecast

. CUmulative 215054.0 124997.6 120192.3 264123692.7 83702958 79023177 55.9\\

55.9\\

54.0l*

45.6\\

28.1' Achieved

AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07102196 COMPLETED BY KAKobiata MONTH June TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

770

17.

758

2.

770

18.

757

3.

773

19.

760

4.

774

20.

760

5.

771

21.

711

6.

765

22.

296

/ 7.

767

23.

362

8.

770

24.

730

9.

765

25.

772

10.

764

26.

770

11.

765

27.

765

12.

768

28.

761

13.

760

29.

753

14.

762

30.

755

15.

764

31.
16.

766

)

- INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1996 The Unit decreased power to 40% at 0530 on June 22 to identify and plug condenser tube leaks. Full power was resumed at 2100 on June 24..

REPORT MONTH JUNE 1996 No.

Date 3

6121/96

1.

F: Forced S: Scheduled UNIT SHUTDOWNS AND POWER REDUCTIONS

Type, Duration Reason2

{Hours) 81 B

2.
3.

Method of*

Licensee Shutting Event Down Reactor3 Report #

4 {Powr derate To40%)

4.
5.

System Code' Component Code5 Reason Method:

Exhibit G - Instructions Exhibit I - Same Source A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-0ther {Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error {Explain)

H-Other (Explain) for Preparation of Data Entry Sheets for Licensee Event Report {LER) File

{NURE~161)

Cause & Corrective Action to Prevent Recurrence Derate due to condenser Tube leak identification and plugging.

. I i

DOCKET NO 50-255 UNIT Palisades DATE 07/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572