Monthly Operating Rept for Sept 1997 for PNPP.W/971002 Ltr
ML18067A702
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/30/1997
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710080115
Download: ML18067A702 (5)


Text

A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 October 2, 1997 US Nuclear Regulatory Commission Documer.i: Cv:::t;~: Da:.:~

Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 1997.

If you have any questions or concerns, please to contact me at (616) 764-3179.

Sincerely,

~~

R.S.Hawn Reactor Engineering Supervisor CC: RA Vincent, Palisades 1/ (

GABaustian, Palisades ALWilliams, Palisades Sehior Resident Inspector, Palisades ORHahn, Liiv of Had Heaith Servicei>, Lansir1g, ~vii BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USN RC Document Control, 950*22*35*10/L Cycle 13 Reports 9710080115 970930 . f PDR ADOCK 05000255 R

.\,..., /') 0,g4

__ PD~._) l (

\

Illllll lllll lllll lllll llllll lllll Ill llll :

Ut*j *1868FB*

OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS:

NOTES:

l. UNIT NAME Palisades
2. REPORTING PERIOD: 970901-970930
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811.7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT,

('".VE. REJ>.*C:Of.'-?:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date CUmulative ll. HOURS IN REPORTING PERIOD 720.0 6551.0 226022.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 707.2 6012.4 134109.6
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 701.2 5866.4 129091. 9
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS.THERMAL ENERGY GENERATED (MWH) 1745397.8 14496305.0 286100303.5
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 554019 4612484 90679219
18. NET ELECTRICAL ENERGY GENERATED (MWH) 526742 4384197 85651957
19. UNIT SERVICE FACTOR 97.4% 89.5, 57.1'
20. UNIT AVAILABILITY FACTOR 97.4' 89.5, 57.1'
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2, 91.7, 55.4'*
22. UNIT CAPACITY FACTOR (USING DER NET) 90.9, 83.1' 47.1'

~~- *u**K~T FOi<;:o;:J c;.:;*:,::;.GE RATE  :'?. "*~ 10.f;' 17.ll'

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS - (TYPE, DATE AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUOctober 9, 1997

.. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10L02/97 COMPLETED BY KAKobiata MONTH September TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

(MWe Net) (MWe Net)

1. 751 17. 760
2. 746 18. 765
3. 763 19. 713
4. 769 20. 653
5. 761 21. 760
6. 749 22. 758
7. 752 23. 758
8. 753 24. 778
9. 752 25. 766
10. 750 26. 775.
11. 756 27. 773
12. 756 28. 771
13. 758 29. 761
14. 761 30. 56
15. 765 31.
16. 757 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

~-

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1997 The Unit began the month operating at' 100 percent power. On September 10, 1997 an Ultrasonic Flow Measurement (UFM) system was placed in service to more accurately measure feedwater flow. This should allow the plant to increase power output by approximately two percent.

On September 19, 1997 at 2121 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.070405e-4 months <br /> a plant back down to 84 percent was achieved for turbine valve testing and repacking of a heater drain pump. The plant was returned to full power on September 21, 1997 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />.

On September 29, 1997 at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />, a plant shutdown was initiated to facilitate repairs on a small leak on a primary coolant pump seal leakoff line. The turbine was taken offline at 0514 hours0.00595 days <br />0.143 hours <br />8.498677e-4 weeks <br />1.95577e-4 months <br /> on September 30, 1997 with the reactor subcritical at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br />. The Unit remained shutdown for the rest of the month.

1 REPORT MONTH SEPTEMBER 1997 DOCKET NO 50-255 UNIT Palisades DATE 10/02/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective 5

(Hours) Shutting Event Code' Code Action to Down Reactor Report# Prevent Recurrence

5. 9/29/97 F 18.8 A Primary Coolant Pump seal leakoff line Leak
1. 2. 3. 4. 5.

F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain). (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)