A CMS Energy Company October 2, 1997 US Nuclear Regulatory Commission Documer.i: Cv:::t;~: Da:.:~

Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 1997.

If you have any questions or concerns, please to contact me at (616) 764-3179.

Sincerely,

~~

R.S.Hawn Reactor Engineering Supervisor CC: RA Vincent, Palisades GABaustian, Palisades ALWilliams, Palisades Sehior Resident Inspector, Palisades ORHahn, Liiv of Had Heaith Servicei>, Lansir1g, ~vii BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USN RC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9710080115 970930. f PDR ADOCK 05000255 R

__ PD~._)

.\\,..., /') 0 Ut*j,g4 l

(

\\

I llllll lllll lllll lllll llllll lllll Ill llll :

  • 1868FB*

1 / (

OPERATING STATUS:

l.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 970901-970930 2530 811.7 805

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT,

('".VE. REJ>.* C:Of.'-?:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:

ll. HOURS IN REPORTING PERIOD

12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS.THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)

~~-

  • u**K~T FOi<;:o;:J c;.:;*:,::;.GE RATE This Month 720.0 707.2 701.2 1745397.8 554019 526742 97.4%

97.4' 100.2, 90.9,

'?. "*~
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS - (TYPE, DATE AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUOctober 9, 1997

.. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 6551.0 6012.4 5866.4 14496305.0 4612484 4384197 89.5, 89.5, 91.7, 83.1' 10.f;'

Forecast DOCKET NO 50-255 DATE 10-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

CUmulative 226022.0 134109.6 129091. 9 286100303.5 90679219 85651957 57.1' 57.1' 55.4'*

47.1' 17.ll' Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10L02/97 COMPLETED BY KAKobiata MONTH September TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

(MWe Net)

(MWe Net)

1.

751

17.

760

2.

746

18.

765

3.

763

19.

713

4.

769

20.

653

5.

761

21.

760

6.

749

22.

758

7.

752

23.

758

8.

753

24.

778

9.

752

25.

766

10.

750

26.

775.

11.

756

27.

773

12.

756

28.

771

13.

758

29.

761

14.

761

30.

56

15.

765

31.
16.

757 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

~-..

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1997 The Unit began the month operating at' 100 percent power. On September 10, 1997 an Ultrasonic Flow Measurement (UFM) system was placed in service to more accurately measure feedwater flow. This should allow the plant to increase power output by approximately two percent.

On September 19, 1997 at 2121 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.070405e-4 months <br /> a plant back down to 84 percent was achieved for turbine valve testing and repacking of a heater drain pump. The plant was returned to full power on September 21, 1997 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />.

On September 29, 1997 at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />, a plant shutdown was initiated to facilitate repairs on a small leak on a primary coolant pump seal leakoff line. The turbine was taken offline at 0514 hours0.00595 days <br />0.143 hours <br />8.498677e-4 weeks <br />1.95577e-4 months <br /> on September 30, 1997 with the reactor subcritical at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br />. The Unit remained shutdown for the rest of the month.

REPORT MONTH SEPTEMBER 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type1 Duration Reason2 Method of Shutting Licensee System Code' (Hours)

5.

9/29/97 F

18.8 A

1.
2.

F: Forced Reason S: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Event Down Reactor Report#

3.
4.

Method:

Exhibit G - Instructions 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain).

(NUREG-0161)

Component Code5

5.