Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18066A6901 November 1999Rev 5 to Palisades Nuclear Plant Colr.Shutdown Margin
ML18066A67630 September 1999Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant
ML18066A6272 September 1999LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr
ML18066A63531 August 1999Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant
ML18066A67731 August 1999Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant
ML18066A62220 August 1999LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr
ML18066A60631 July 1999Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr
ML18066A52030 June 1999Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr
ML18066A48431 May 1999Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr
ML18066A63730 April 1999Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant
ML18068A59430 April 1999Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr
ML18066A4161 April 1999Rev 4 to COLR, for Palisades Nuclear PlantShutdown Margin
ML18066A45031 March 1999Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr
ML18066A46731 March 1999Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant.Safe Shutdown Earthquake
Finite Element Analysis
ML18068A53528 February 1999Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr
ML18066A39331 January 1999Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr
ML18066A37820 January 1999LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr
ML20206F61331 December 19981998 Consumers Energy Co Annual Rept. with
ML18066A36531 December 1998Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr
ML18066A34230 November 1998Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr
ML18066A33011 November 1998Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used
ML18068A49231 October 1998Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr
ML18068A48529 October 1998LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced
ML18066A31830 September 1998Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant
ML18066A29031 August 1998Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr
ML18066A31931 August 1998Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant
ML18066A28318 August 1998LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML20237E03031 July 1998ISI Rept 3-3Boric Acid
Hydrostatic
Nondestructive Examination
Liquid penetrant
ML18066A27031 July 1998Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr
ML18066A23130 June 1998Monthly Operating Rept for June 1998 for Palisades Nuclear Plant
ML18066A22630 June 1998LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds RepairedThrough-Wall Leak
ML18066A30618 June 1998SG Tube Inservice Insp.
ML20249C49517 June 1998Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events ReviewShutdown Margin
Fire Protection Program
Weak link
ML18066A1789 June 1998LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures
ML18066A1711 June 1998Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46
ML18066A17431 May 1998Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr
ML18066A23231 May 1998Revised MOR for May 1998 for Palisades Nuclear Plant
ML18068A47031 May 1998Annual Rept of Changes in ECCS Models Per 10CFR50.46.
ML18065B24513 May 1998LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge
ML18066A23330 April 1998Revised MOR for Apr 1998 for Palisades Nuclear Plant
ML18068A34630 April 1998Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr
ML18066A34122 April 1998Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events.Shutdown Margin
Anticipated operational occurrence
Rod Drop Event
Coast down
ML18065B20731 March 1998Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr
ML20217C27431 March 1998Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts
ML18066A23431 March 1998Revised MOR for Mar 1998 for Palisades Nuclear Plant
ML18068A30428 February 1998Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr
ML18066A23528 February 1998Revised MOR for Feb 1998 for Palisades Nuclear Plant
ML18065B1645 February 1998Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance.
ML18067A82131 January 1998Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr