Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With
ML18068A535
Person / Time
Site: Palisades 
Issue date: 02/28/1999
From: Handlovits S, Hawn R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9903110195
Download: ML18068A535 (5)


Text

>-::l:o..su.r.e.s ~

~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

A CMS Energy Company March 2, 1999 US Nuclear Regulatory Commission Document Control-Desk Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of February 1999.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R. S. Hawn Reactor Engineering Supervisor CC: JMMilan, Palisades GABaustian, Palisades

(

Senior Resident. Inspector, Palisades DRHahn, Div of Rad Health Ser1ices, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RDWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204

- 9 O Region Ill Administrator, USNRC

(', 9 () (). J Pal. Eng. Records Center, 950*22*35*1'0/L Cycle 14 Reports (SMH 99*06) 9903110195 990228 PDR ADOCK 05000255,

l

AVERAGE DAILY UNIT POWER LEVEL MONTH _* __

F,_,e=b'"'"'ru=a:..:...ry,__ __

DAY

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

AVERAGE DAILY POWER LEVEL (MWe Net) 788 790 790 792 793 793 794*

790 778 778 774 791 788 791 791 792 INSTRUCTIONS:

DAY 17.'...

18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.

31_. ---

DOCKET NO 50-255 UNIT Palisades DA TE 03/02/99 COMPLETED BY SMHandlovits TELEPHONE (616)764-3262 AVERAGE DAILY POWER LEVEL (MWe Net) 793 794 795 793 793 795 794 794 792 792 791 793

.* l On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1999 The Plant began the month of February at nominal full power and remained there for the entire month.

REPORT MONTH __

.:...F""EB::.:R_,_,U""A-"-R""'Y_1""9""99"---

No.

Date NONE

1.

F: Forced S: Scheduled Type1 Duration Reason2 (Hours) 2..

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor'

  • 3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

Licensee Event Report#

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

5.

Cause & Corrective Action to Prevent Recurrence

  • f I

. i Exhibit I - Same Source DOCKET NO

.~255 UNIT Palisades DA TE 03/02/99 COMPLETED BY SMHandlovits TELEPHONE 616-764-3262

OPERATING STATUS:

1. UNIT NAME
2. REPORTING PERIOD:
3. LICENSED THERMAL POWER (MWt)
4. NAMEPLATE RATING (GROSS MWe)

OPERATING DATA REPORT Palisades 990201-990228 2530 811.7

5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS:
9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10 REASONS FOR RESTRICTIONS, IF ANY:

11 HOURS IN. REPORTING PERIOD 12 NUMBER OF HOURS REACTOR WAS CRITICAL 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 NET ELECTRICAL ENERGY GENERATED (MWH) 19 UNIT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 UNIT CAPACITY FACTOR (USING MDC NET) 22 UNIT CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE This Month 672. 0 672. 0 672. 0 1697623.1 556993 530995 100.0%

100.0%

108.2%

98.2%

0.0%

24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Yr-to-Date 1416.0 1258.5 1242.4 3104171.6 1013254 965367

87. 7%
87. 7%

93.4%

84. 7%

12.3%

Forecast _

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 50-255 DATE 3-2-99 COMPLETED BY SMHandlovits TELEPHONE (616)764-3262 NOTES:

Cumulative 238407.0 144542.1 139328.1 311322974. 7 98854840 93427167 58.4%

58.4%

r 5 7. 0% *

48. 7%

26.0%

Achieved