ML18067A655

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1997 for Palisades Nuclear Plant
ML18067A655
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1997
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9708130428
Download: ML18067A655 (5)


Text

',.

A CMS Energy Company August 4, 1997 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DAT A DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1997.

If you have any questions or concerns, please to contact me at (616) 764-3179.

Sincerely, R.S.Hawn Re~ctor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgenseri, Michigan Dept of Labor, Lansing, Ml Jr'adgG!t, ~.~::h:;;£:; !='d~!1-:-

S~7'.-~~ Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports

(~~~977io~a~1~3~0~42~a~9~7~0~7~3~1 ~~___,

1

-~~

1 ~~

. I PDR ADOCK.05000255

'1 1

R PDR I

  • ----------i 11111111111111111 Jilli !lllll llllllll llll i I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO

!,20-25!,2 UNIT esili:rni;!i;rn DATE Q6LQ1L9Z COMPLETED BY IS81SQbi£il5l MONTH July TELEPHONE 1616lZ64-2!2Z2 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

Z!.22

17.

Z12

2.

74!2

18.

Z11

3.

Z!.24

19.

Z!2Q

4.

Z!.28

20.

Z!.24

5.

Z6Q

21.

Z12

6. -

Z!.2!2

22.

Z!.2!2

7.

Z60

23.

Z!.26

8.

Z!.26

24.

Z!.26

9.

Z63

25.

Z!.23

10.

Z64

26.

Z40 11.

Z62

27.

71J

12.

Z!.29

28.

Z44

13.

746

29.

Z63

14.

739

30.

Z64

15.

Z4Z

31.

763

16.

Z40 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

I*

j:

SUMMARY

OF OPERATING EXPERIENCE FOB JULY 1997 The Unit operated at 1 00 percent power the 'entire month.

REPORT MONTH JULY 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type1 Duration Reason2 Method of Shutting Licensee System Code4 Component Code5 Cause & Corrective Action to (Hours)

NONE

1.
2.

F: Forced Reason S: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Event DoWn Reactor Report #

3.

Method:

1-Manual 4.'

Exhibit G - Instructions for Preparation of Data

  • 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)

(NUREG-0161)

Prevent Recurrence

5.

Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DA TE 08/04/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

PCENSED THERMAL POWER (MWt).

4.

NAMEPLATE RATING* (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE. CAPACITY (GROSS MWe).

OPERATING DATA REPORT Palisades 970701-970731 2530 811.7 805

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED. (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)

. 19.. UNIT SERVICE FACTOR

20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1875400.1 589085 559975 100.0t 100.0t 103.lt 93.St
  • o.ot

"!~.

..,.,.,.,.,....,,.~:*' "**:;**-:"';::'*RD 0V"'~ THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH) :

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
  • 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL. OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 5087.0 4561.2 4421.2 10875849.S 34696is 3297744 86.9t 86.9t

  • 88. St BO.St 13.lt Forecast DOCKET NO 50-255 DATE.

7-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

cumulative 224558.0 132658.4 127646.7 282479848.1 89536350 84565504 56.Bt 56.Bt 55.1'*

46.Bt 27.2t Achieved