A CMS Energy Company July 2, 1999 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1999.
If you have any questions or concerns, please contact me at (616) 764-3179.
Sincerely, R. S. Hawn Reactor Engineering Supervisor CC: JMMilan, Palisades GABaustian, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RDWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204 Region Ill Administrator, USNRC Pal. Eng. Records Center, 950*22*35*10/L Cycle 14 Reports (SMH 99*16) 9907090164 990630 PDR', t ;* ADOCK'. 05000255\\
R
"~
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07/02/99 COMPLETED BY SMHandlovits MONTH JUNE TELEPHONE (616)764-3262 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
775
- 17.
788
- 2.
781
- 18.
787
- 3.
787
- 19.
786
- 4.
784
- 20.
783
- 5.
774
- 21.
781
- 6.
765
- 22.
780
- 7.
767
- 23.
773
- 8.
773
- 24.
773
- 9.
773
- 25.
774
- 10.
769
- 26.
776
- 11.
769
- 27.
772
- 12.
771
- 28.
768
- 13.
772
- 29.
779
- 14.
780
- 30.
784
- 15.
789
- 31.
- 16.
788 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR JUNE 1999 The Plant began the month of June at nominal full power and remained there for the entire month.
REPORTMONTH~~~J~U~N~E~19~9~9'--~
No.
Date NONE
- 1.
F: Forced S: Scheduled Type1
- 2.
Reason:
Duration (Hours)
Reason2 A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
Licensee Event Report#
- 4.
System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
- 5.
Cause & Corrective Action to Prevent Recurrence Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DATE 07 /02199 COMPLETED BY SMHandlovits TELEPHONE 616-764-3262
OPERATING STATUS:
- 1. UNIT NAME
- 2. REPORTING PERIOD:
- 3. LICENSED THERMAL POWER (MWt)
- 4. NAMEPLATE RATING (GROSS MWe)
- 5. DESIGN ELECTRICAL RATING (NET MWe)
OPERATING DATA REPORT Palisades 990601-990630 2530 811.7 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10 REASONS FOR RESTRICTIONS, IF ANY:
11 HOURS IN REPORTING PERIOD 12 NUMBER OF HOURS REACTOR WAS CRITICAL 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 NET ELECTRICAL ENERGY GENERATED (MWH)
- 19 UNIT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 UNIT CAPACITY FACTOR (USING MDC NET) 22 UNIT CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE This Month 720.0 720. 0 720. 0 1819740.8 588027 559638 100.0%
100.0%
106.5%
96.6%
0.0%
24* SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH) :
Refueling Outage.
10/16/99.
37 days.
25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 4343.0 3946.2 3918.4 9790499.5 3178632 3026502 90.2%
90.2%
95.5%
86.6%
9.8%
Forecast DOCKET NO 50-255 DATE 7-2-99 COMPLETED BY SMHandlovits TELEPHONE (616)764-3262 NOTES:
Cumulative 241334.0 147229.8 142004.l 318009302.6 101020218 95488302 58.8%
58.8%
- 57. 5%
- 4 9. 2%
- 25. 7%
Achieved