consumers Power *
- POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 2, 1996
. US Nuclear Regulatory Commission Document Control Desk LICENSEE REPORT OF MONTHLY OPERATING DATA' DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for ttie month of September.199_6.
- If you have any questions or concerns, please to contact me at (616) 764-2013.
Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades.
Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO,~Atlanta, GA C\\NMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 12 Reports 9610070.360 960930
- PDRI. AOOCK 05000255*.
- 1.R
.J PDR
_.:.:i:.!:...~..ll...."'~*..__-:!.!-=... ~-*"--*--
A CMS' ENER6YCOMPANY
- 1.
- 2.
- 3.
- 4.
OPERATING STATUS:
UNIT NJ\\MB REPORTING PERIOD:
LICENSED THERMAL POWER.(MWt)
NJ\\MBPLATE RATING (GROSS MWe)
DESIGN ELECTRICAL RATING. (NET MWe)
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
'**770
.... COMPLETED *BY KAKobiata
.. ~~ I
. :4.t, TELEPHONE.
(616) 764-2572
- f.
. NOTES:'.....
- -'*f.
~-
- .t;
- 1'1 *t-
.i
.* t...
5..
- 6.
- 7.
- 8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
.**730 IF' CHANGES OCCUR* IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH' 7AND 7)* SINCE. LAST REPORT,
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): *
- 10. REASONS FOR RESTRICTIONS,- IF ANY:
- 11. HOURS IN REPORT!~ PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS 1'4. HOURS GENERATOR ON-LINE
- 15, UNIT RESERVE SHt11'DOWN*HOURS
- 16. GROSS* THERMAL ENERGY GENERATED (MWH) 17.. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY.GENERATED (MWH) l9. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
This Month 720.0'*
- 720.0.
~:
720.0*
1813700.9 576328 548064-100.0t*
100.0t 104. 3t.
94.6t*
- 23. QNIT ~ORCED OUTAGE RATE o:o~
. ~' '*~
- 24. *SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF'~) :
.A 51 c:!B.y refueling outage is scheduled to begin on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL-OPERATION):
INITIAL CRITICALITY.
INITIAL ELE~ICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- -*weighted Average (635 MWe used as MDC Net prior to October 1985)
.... e *Yr-to-Date*
.. 15387216. 3
-. 4920375
'4'678779 94.1' 94.1' 97.5t 88.4' 5.~;,*
Forecast CUmulative *
- 217262. 0
... 127167. 3
).*
122344.8 269505906.8 85396629 80632198 56.3t 56.3t 54.5t*
46.1'*
~i.S~
Achieved
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/02/96 COMPLETED BY KAKobiata MONTH September TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
763
- 17.
761 2..
760
- 18.
757
- 3.
758 19.
764
. 4.
757
- 20.
764
- 5.
755
- 21.
761
- 6.
756
- 22..
762
- 7.
754
- 23.
763
- 8.
754
- 24.
762
- 9.
754
- 25.
767
- 10.
762
- 26.
765
- 11.
754
- 27.
760
- 12.
758
- 28.
767
- 13.
766
- 29.
. 766 14; 768
- 30.
768
- 15.
766
- 31.
- 16.
766
.. -~ -.
INSTRUCTIONS:
On this fQrmat, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH SEPTEMBER 1996 No.
Date NONE
- 1.
F: Forced S: Scheduled UNIT SHUTDOWNS' AND POWER REDUCTIONS Type1 Duration Reason2 (Hours) 2 a
Reason Method:
A-Equipment Failure (Explain) 1 ~anual Method of Shutting Down Reactor
- 4.
Licensee Event Report#
System Code4 Exhibit G - Instructions B-Maintenance or Test 2-Manual Scram for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG~161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction
+Other (Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
.Component
- Code5
. 5.
Cause & Corrective Action to
COMPLETED BY KAKobiata TELEPHONE 616-764-25n
SUMMARY
OF OPERATING EXPERIENCE FOR SEPTEMBER 1996 The Unit operated at 100 percent power for the entire month.