Monthly Operating Rept for Sept 1996 for Palisades Nuclear Plant
ML18065A947
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/30/1996
From: Kobiata K, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9610070360
Download: ML18065A947 (5)


Text

  • ,,

consumers Power *

  • POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 2, 1996

. US Nuclear Regulatory Commission Document Control Desk LICENSEE REPORT OF MONTHLY OPERATING DATA' DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for ttie month of September.199_6.

  • If you have any questions or concerns, please to contact me at (616) 764-2013.

Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades.

Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO,~Atlanta, GA C\\NMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 12 Reports 9610070.360 960930

  • PDRI. AOOCK 05000255*.
  • 1.R

.J PDR

_.:.:i:.!:...~..ll...."'~*..__-:!.!-=... ~-*"--*--

A CMS' ENER6YCOMPANY

1.
2.
3.
4.

OPERATING STATUS:

UNIT NJ\\MB REPORTING PERIOD:

LICENSED THERMAL POWER.(MWt)

NJ\\MBPLATE RATING (GROSS MWe)

DESIGN ELECTRICAL RATING. (NET MWe)

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

'**770

.... COMPLETED *BY KAKobiata

.. ~~ I

. :4.t, TELEPHONE.

(616) 764-2572

f.

. NOTES:'.....

  • -'*f.

~-

  • .t;
      • 1'1 *t-

.i

.* t...

5..

6.
7.
8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

.**730 IF' CHANGES OCCUR* IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH' 7AND 7)* SINCE. LAST REPORT,

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): *

10. REASONS FOR RESTRICTIONS,- IF ANY:
11. HOURS IN REPORT!~ PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS 1'4. HOURS GENERATOR ON-LINE
  • 15, UNIT RESERVE SHt11'DOWN*HOURS
16. GROSS* THERMAL ENERGY GENERATED (MWH) 17.. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY.GENERATED (MWH) l9. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)

This Month 720.0'*

  • 720.0.

~:

720.0*

1813700.9 576328 548064-100.0t*

100.0t 104. 3t.

94.6t*

23. QNIT ~ORCED OUTAGE RATE o:o~

. ~' '*~

24. *SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF'~) :

.A 51 c:!B.y refueling outage is scheduled to begin on November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL-OPERATION):

INITIAL CRITICALITY.

INITIAL ELE~ICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • -*weighted Average (635 MWe used as MDC Net prior to October 1985)

.... e *Yr-to-Date*

.. 15387216. 3

-. 4920375

'4'678779 94.1' 94.1' 97.5t 88.4' 5.~;,*

Forecast CUmulative *

  • 217262. 0

... 127167. 3

).*

122344.8 269505906.8 85396629 80632198 56.3t 56.3t 54.5t*

46.1'*

~i.S~

Achieved

AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/02/96 COMPLETED BY KAKobiata MONTH September TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

763

17.

761 2..

760

18.

757

3.

758 19.

764

. 4.

757

20.

764

5.

755

21.

761

6.

756

  • 22..

762

7.

754

23.

763

8.

754

24.

762

9.

754

25.

767

10.

762

26.

765

11.

754

27.

760

12.

758

28.

767

13.

766

29.

. 766 14; 768

30.

768

15.

766

31.
16.

766

.. -~ -.

INSTRUCTIONS:

On this fQrmat, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH SEPTEMBER 1996 No.

Date NONE

1.

F: Forced S: Scheduled UNIT SHUTDOWNS' AND POWER REDUCTIONS Type1 Duration Reason2 (Hours) 2 a

Reason Method:

A-Equipment Failure (Explain) 1 ~anual Method of Shutting Down Reactor

4.

Licensee Event Report#

System Code4 Exhibit G - Instructions B-Maintenance or Test 2-Manual Scram for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG~161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction

+Other (Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

.Component

  • Code5

. 5.

Cause & Corrective Action to

  • Prevent Recurrence Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DA TE 10/02196.

COMPLETED BY KAKobiata TELEPHONE 616-764-25n

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1996 The Unit operated at 100 percent power for the entire month.