Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant ML18065B1341997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Palisades Nuclear Plant ML18065B1041997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Palisades Nuclear Plant ML18067A7661997-10-31031 October 1997 Revised MOR for Oct 1997 for Palisades Nuclear Plant ML18067A7021997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for PNPP ML18067A6701997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Palisades Nuclear Plant ML18067A6551997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Palisades Nuclear Plant ML18067A6231997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Palisades Nuclear Plant ML18067A5621997-05-31031 May 1997 Revised Monthly Operating Rept & Summary of Operating Experience for May 1997 for PNPP ML18067A5251997-04-30030 April 1997 Revised MOR for April 1997 for Pnp ML18067A4741997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Palisades Nuclear Plant ML18067A4851997-03-31031 March 1997 Revised Monthly Operating Rept for Mar 1997 for Palisades Nuclear Plant ML18066A8981997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant ML18066A9011997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant ML18066A8761997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Palisades Nuclear Plant ML18066A8281996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Palisades Nuclear Plant ML18065B1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Palisades Nuclear Plant ML18065B0701996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Palisades Nuclear Plant ML18065A9471996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Palisades Nuclear Plant ML20117K1511996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Palisades Nuclear Plant ML18065A8691996-07-31031 July 1996 Operating Data Rept for July 1996 for Palisades ML18065A8561996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Palisades Nuclear Plant ML18065A8121996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Palisades Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr ML18066A6681999-10-0505 October 1999 Safety Evaluation Concluding That Licensee Performing Tendon Surveillance in Accordance with Requirements of Plant Ts. Recommends That Licensee Take Appropriate Actions to Avoid Problems as Described in in 99-10 ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML20211N8211999-09-0303 September 1999 Safety Evaluation Supporting Amend 187 to License DPR-20 05000255/LER-1998-011, :on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With1999-09-0202 September 1999
- on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With
ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6251999-08-26026 August 1999 Safety Evaluation Supporting Relief Request of Quality & Safety to License DPR-20 05000255/LER-1999-002, :on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With1999-08-20020 August 1999
- on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With
ML18066A6051999-08-0909 August 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With ML18066A5841999-07-26026 July 1999 Safety Evaluation Re Relief Requests 2 & Portion of 1 Are Authorized Per 10CFR50.55(a)(3)(i) on Basis That Alternative Provides Acceptable Level Od Quality & Safety.Requests 3,5 & 7 Results in Hardship.Staff Denies Requests 1,4 & 6 ML18066A5601999-07-13013 July 1999 Draft Safety Evaluation Supporting Licensee Proposed Conversion of Current TS for Palisades Plant to Its. Concludes That Public Health & Safety Will Not Be Endangered & That Activities Conducted in Compliance with Regulations ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With ML20206J9511999-05-0606 May 1999 Safety Evaluation Supporting Amend 186 to License DPR-20 ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML20205Q5511999-04-13013 April 1999 Safety Evaluation Supporting Amend 185 to License DPR-20 05000255/LER-1999-001, :on 990310,noted Failure to Perform TS Surveillance Channel Check of Auxiliary Feedwater Flow Indication.Caused by Misinterpretation of Definition of Channel Check.Implementing Procedure Has Been Revised1999-04-0909 April 1999
- on 990310,noted Failure to Perform TS Surveillance Channel Check of Auxiliary Feedwater Flow Indication.Caused by Misinterpretation of Definition of Channel Check.Implementing Procedure Has Been Revised
ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With ML20207F2611999-02-22022 February 1999 Safety Evaluation Supporting Amend 184 to License DPR-20 ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With ML18066A3871999-01-28028 January 1999 Safety Evaluation Accepting License Request for Staff to Authorize Consumers Energy Proposed Alternative to Requirements of ASME Section XI Article IWA-5250 for Degraded Primary Coolant Pump Casing Bolts at Plant 05000255/LER-1998-014, :on 981227,control Rod Drive Seal Housing Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking. Faulted Control Rod drive-2 Seal Housing Was Replaced1999-01-26026 January 1999
- on 981227,control Rod Drive Seal Housing Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking. Faulted Control Rod drive-2 Seal Housing Was Replaced
05000255/LER-1998-013, :on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With1999-01-20020 January 1999
- on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With
05000255/LER-1998-012, :on 981215,discovered That MSIVs Were Slightly Open Based on Local Stem Position.Caused by High Packing Friction Introduced by Packing Replacement During 1998 Rfo. Completed Actions to Assure MSIVs Will Fully Close1999-01-14014 January 1999
- on 981215,discovered That MSIVs Were Slightly Open Based on Local Stem Position.Caused by High Packing Friction Introduced by Packing Replacement During 1998 Rfo. Completed Actions to Assure MSIVs Will Fully Close
ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With ML18066A3591998-12-28028 December 1998 Safety Evaluation Authorizing Licensee Request to Use ASME OMa-1996,Subsection Istd, Preservice & Inservice Exam & Testing of Dynamic Restraints, as Alternative to Requirements of ASME OMa-1988,Part 4 for Plant ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 05000255/LER-1997-011, :on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced1998-10-29029 October 1998
- on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced
ML18068A4571998-10-14014 October 1998 Correction to Safety Evaluation of Third 120-month Interval Inservice Insp Program & Associated Requests for Relief. Error Was Made in Preparation of Evaluation ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18068A4391998-09-25025 September 1998 Safety Evaluation Re Licensee 950523 Submittal of Rept Which Summarizes Results of USI A-46 Implementation Program, Established in Response to Suppl 1 to NRC GL 87-02 Through 10CFR50.54(f) Ltr ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant 05000255/LER-1998-010, :on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested1998-08-18018 August 1998
- on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested
LD-98-024, Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency1998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant 05000255/LER-1998-009, :on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of PCS Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired1998-06-30030 June 1998
- on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of PCS Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired
ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review 1999-09-30
[Table view] |
Text
consumers Power *
- POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 2, 1996
. US Nuclear Regulatory Commission Document Control Desk LICENSEE REPORT OF MONTHLY OPERATING DATA' DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for ttie month of September.199_6.
- If you have any questions or concerns, please to contact me at (616) 764-2013.
Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades.
Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO,~Atlanta, GA C\\NMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 12 Reports 9610070.360 960930
.J PDR
_.:.:i:.!:...~..ll...."'~*..__-:!.!-=... ~-*"--*--
A CMS' ENER6YCOMPANY
- 1.
- 2.
- 3.
- 4.
OPERATING STATUS:
UNIT NJ\\MB REPORTING PERIOD:
LICENSED THERMAL POWER.(MWt)
NJ\\MBPLATE RATING (GROSS MWe)
DESIGN ELECTRICAL RATING. (NET MWe)
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
'**770
.... COMPLETED *BY KAKobiata
.. ~~ I
. :4.t, TELEPHONE.
(616) 764-2572
- f.
. NOTES:'.....
~-
.i
.* t...
5..
- 6.
- 7.
- 8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
.**730 IF' CHANGES OCCUR* IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH' 7AND 7)* SINCE. LAST REPORT,
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): *
- 10. REASONS FOR RESTRICTIONS,- IF ANY:
- 11. HOURS IN REPORT!~ PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS 1'4. HOURS GENERATOR ON-LINE
- 15, UNIT RESERVE SHt11'DOWN*HOURS
- 16. GROSS* THERMAL ENERGY GENERATED (MWH) 17.. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY.GENERATED (MWH) l9. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
This Month 720.0'*
~:
720.0*
1813700.9 576328 548064-100.0t*
100.0t 104. 3t.
94.6t*
- 23. QNIT ~ORCED OUTAGE RATE o:o~
. ~' '*~
- 24. *SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF'~) :
.A 51 c:!B.y refueling outage is scheduled to begin on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL-OPERATION):
INITIAL CRITICALITY.
INITIAL ELE~ICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- -*weighted Average (635 MWe used as MDC Net prior to October 1985)
.... e *Yr-to-Date*
.. 15387216. 3
-. 4920375
'4'678779 94.1' 94.1' 97.5t 88.4' 5.~;,*
Forecast CUmulative *
... 127167. 3
).*
122344.8 269505906.8 85396629 80632198 56.3t 56.3t 54.5t*
46.1'*
~i.S~
Achieved
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/02/96 COMPLETED BY KAKobiata MONTH September TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
763
- 17.
761 2..
760
- 18.
757
- 3.
758 19.
764
. 4.
757
- 20.
764
- 5.
755
- 21.
761
- 6.
756
762
- 7.
754
- 23.
763
- 8.
754
- 24.
762
- 9.
754
- 25.
767
- 10.
762
- 26.
765
- 11.
754
- 27.
760
- 12.
758
- 28.
767
- 13.
766
- 29.
. 766 14; 768
- 30.
768
- 15.
766
- 31.
- 16.
766
.. -~ -.
INSTRUCTIONS:
On this fQrmat, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH SEPTEMBER 1996 No.
Date NONE
- 1.
F: Forced S: Scheduled UNIT SHUTDOWNS' AND POWER REDUCTIONS Type1 Duration Reason2 (Hours) 2 a
Reason Method:
A-Equipment Failure (Explain) 1 ~anual Method of Shutting Down Reactor
- 4.
Licensee Event Report#
System Code4 Exhibit G - Instructions B-Maintenance or Test 2-Manual Scram for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG~161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction
+Other (Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
.Component
. 5.
Cause & Corrective Action to
- Prevent Recurrence Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DA TE 10/02196.
COMPLETED BY KAKobiata TELEPHONE 616-764-25n
SUMMARY
OF OPERATING EXPERIENCE FOR SEPTEMBER 1996 The Unit operated at 100 percent power for the entire month.