Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO gQ-255 UNIT Psilil!S!Qes DATE Qf!lQJl97 COMPLETED BY
~A~Qbisitsi MONTH May TELEPHONE!f!16l764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1.
771
- 17.
771
- 2.
772
- 18.
lf!f!
- 3.
711
- 19.
lfi9
- 4.
772
- 20.
77J
- 5.
768
- 21.
772
- 6.
111
- 22.
772
- 7.
771
- 23.
171 8..
768
- 24.
766
- 9.
771
- 25.
767
- 10.
712
- 26.
771
- 11.
769.
- 27.
171
- 12.
712
- 28.
7f!8
- 13.
713
- 29.
7§§
- 14.
77Q
- 30.
1§6
- 15.
772
- 31.
1§8
- 16.
771 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
9706090229 970603 -
.~*1 PDR ADOCK 05000255i.
PDR; R.
---~
,-... ¥*.
. /
SUMMARY
OF OPERATING EXPERIENCE FOR MAY 1997 The Unit operated at 100 percent power the entire month.
REPORT MONTH MAY 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.
Date Type1 Duration Reason2 Method of Shutting Licensee System Code4 Component Code5 Cause & Corrective Action to (Hours)
NONE
- 1.
- 2.
F: Forced Reason S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Event Down Reactor Report #
- 3.
- 4.
Method:
Exhibit G - Instructions for Preparation of Data 1-Manual 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)
Prevent Recurrence
- 5.
Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DA TE 06103191.
COMPLETED BY KAKobiata TELEPHONE 616-764-2572
OPERATING STATUS:
- l.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 970501-970531 2530 811. 7 805
- 110
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REAS::lNS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
ll. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GRO~S-THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
This Month 744.0 744.0 744.0 1874999.8 602085 572972 100.0t 100.0t 105.5\\
95.7\\
- 23. UNIT FORCED OUTAGJ:: RATE O.Ot 24.. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 3623.0 3097.2 2957.2 7185951.3 2305768 2191040
- 81. 6\\
- 81. 6\\
82.8\\
75.lt 18.4\\
Forecast DOCKET NO 50-255 DATE 6-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:
Cumulative 223094.0 131194.4 126182.7 278789949.8 88372503 83458800 56.6\\
56.6\\
54.8\\*
46.5\\
27.5\\
Achieved