AVERAGE DAILY UNIT POWER LEVEL DOCKET NO

!2Q-2!;2Q UNIT eali~ag~~

DATE Q!2LQ2L~7 COMPLETED BY KAKobiata MONTH Aoril TELEPHONE 16161764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 1.

774'

17.

113

2.

772 18..

715

3.

110

19.

175

4.

761

20.

11!2

5.

165

21.

114

6.

769

22.

17'J.

7.

115

23.

112

8.

114

24.

11'J.

9.

176

25.

774

10.

116

26.

173 11.

115

27.

112

12.

114

28.

11'J.

13.

114

29.

769

14.

114

30.

167

15.

712

31.
16.

11'J.

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

9705120320 970502 ll PDR, ~DOCK 05000255 R

PD R _.

-1

SUMMARY

OF OPERATING EXPERIENCE FOR APRIL 1997 The Unit operated at 100 percent power the entire month. ---

REPORT MONTH APRIL 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type1 Duration

.Reason2 (Hours)

NONE Method of Shutting Licensee Event Down Reactor3 Report #

System Code4

1.
2.
3.
4.

F: Forced Reason Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other {Explain) 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)

(NUREG-0161)

Component Code5

5.

Cause & Corrective Action to Prevent Recurrence Exhibit I - Same Source DOCKET NO 50-255 UNIT Palisades DA TE 05102197 COMPLETED BY KAKobiata TELEPHONE 616-764-2572

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 970401-970430 2530 811. 7 805

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT,

. GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT.RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. *GROSS ELECTRICAL' ENERGY GENERATED (MWH) 18'. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR.
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET) 23.. UNIT PORCED OUTAGE RATE This Month 719.0 719.0 719.0 1809639.8 583542 555458 100.0t 100.0t 105.8t 96.0t o.ot
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION-,:;;? EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Yr-to-Date 2879.0 2353.2 2213.2 5310951.5 1703683 1618068 76.9t 76.9t
77. Ot 69.8t 23.lt Forecast DOCKET NO 50-255 DATE 5-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

Cumulative 222350.0 130450.4 125438.7 276914950.1 87770418 82885828 56.4t 56.4t 54.6\\*

46.3t 27.6t Achieved