ML18065B104

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Palisades Nuclear Plant.W/971202 Ltr
ML18065B104
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/30/1997
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712100064
Download: ML18065B104 (5)


Text

'**

A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 December 2, 1997 US Nuclear Regulatory Commission Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1997.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R. S. Hawn Reactor Engineering Supervisor CC: RA Vincent, Palisades GABaustian, Palisades r.t~t ALWilliams, Palisades KAToner, Palisades

$13n!(1r RAsident lnspectoL Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades )\

SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950

  • 22*35*1 O/L Cycle 13 Reports 9712100064 971130 PDR . ADOCK 05000255[ *1 R . . .. PDR I I

1 090118 Illllll

  • eea21 1111111111111111111111111111111111 6 .i

.* AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE l 2l02l91 COMPLETED BY KAKabiata MONTH November TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 183 17. 188
2. 186 18. 181
3. 186 19. 188
4. 186 20. 181
5. 186 21. 188
6. 183 22. 188
7. 185 23. 189
8. 186 24. 188
9. 181 25. 186
10. 182 26. 182
11. 188 27. 181
12. 181 28. 185
13. 189 29. 185
14. 188 30. 186
15. 188 31.
16. 181 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

t/ ~*

SUMMARY

OE. OPERATING EXPERIENCE FOR NOVEMBER 1997 The Unit maintained 100 percent power the entire month.

REPORT MONTH NOVEMBER 1997 DOCKET NO SQ..255 UNIT Pali$ades DATE 12102197 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective 4 5 (Hours) Shutting Event Code Code Action to Down Reactor Report# Prevent Recurrence NONE

1. 2. 3. 4. 5.

F: Forced Reason Method: Exhibit G - Instructions .Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restrictio 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative

  • G-Operational Error (Explain)

H-Other (Explain)

I ,

OPERATING DATA REPORT DOCKET NO 50'-255, DATE 12-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 971101-971130
3. LICENSED THEP..MAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date cumulative

11. HOURS IN REPORTING PERIOD 720.0 8016.0' 227487.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7128.4 135225.6
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 720. 0 6971. 8 130197.3
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1813952.6 17202019. 6 288806018.l
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 594546 5488652 91555387
18. NET ELECTRICAL ENERGY GENERATED (MWH) 566128 5217002 86484762 0

. 19. UNIT SERVICE FACTOR 100.0\ 87.0\ 57.2\

20. UNIT AVAILABILITY FACTOR 100.0\ 87.0\ 57.2\
21. UNIT CAPACITY FACTOR (USING MDC NET) 107.7\ 89.2\ 55.6\*
22. UNIT CAPACITY FACTOR (USING DER NET) 97.7\ 80.8\ 47.2\
23. UNIT FORCED Otr.'AGB RATF- 0. 0\ 13.0\ 27.0\
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACHi:

Refueling Outage 4/25/98 39 days long

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 Mwe used as MDC Net prior to October 1985)