ML18065B104

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Palisades Nuclear Plant
ML18065B104
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/30/1997
From: Hawn R, Kobiata K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712100064
Download: ML18065B104 (5)


Text

'**

A CMS Energy Company December 2, 1997 US Nuclear Regulatory Commission Washington, DC 20555 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1997.

If you have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R. S. Hawn Reactor Engineering Supervisor CC: RA Vincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades

$13n!(1r RAsident lnspectoL Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950

  • 22*35*1 O/L Cycle 13 Reports 9712100064 971130 RPDR. ADOCK 05000255[ *1 PDR I

090118 I

1 I llllll 1111111111111111111111111111111111

  • eea21 6.i r.t~t

) \\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT ealisades DATE l 2l02l91 COMPLETED BY KAKabiata MONTH November TELEPHONE (616)164-2512 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

183

17.

188

2.

186

18.

181

3.

186

19.

188

4.

186

20.

181

5.

186

21.

188

6.

183

22.

188

7.

185

23.

189

8.

186

24.

188

9.

181

25.

186

10.

182

26.

182

11.

188

27.

181

12.

181

28.

185

13.

189

29.

185

14.

188

30.

186

15.

188

31.
16.

181 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

t/ ~*

SUMMARY

OE. OPERATING EXPERIENCE FOR NOVEMBER 1997 The Unit maintained 100 percent power the entire month.

REPORT MONTH NOVEMBER 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type1 Duration Reason2 Method of Shutting Licensee System Code4 Component Code5 Cause & Corrective Action to (Hours)

NONE

1.
2.

F: Forced Reason S: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restrictio E-Operator Training & License Examination F-Administrative

  • G-Operational Error (Explain)

H-Other (Explain)

Event Down Reactor Report#

Prevent Recurrence

3.
4.
5.

Method:

Exhibit G - Instructions

. Exhibit I - Same Source 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)

(NUREG-0161)

DOCKET NO SQ..255 UNIT Pali$ades DATE 12102197 COMPLETED BY KAKobiata TELEPHONE 616-764-2572

I OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

LICENSED THEP..MAL POWER (MWt)

NAMEPLATE RATING (GROSS MWe)

DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 971101-971130 2530 811. 7 805

    • 770
    • 730
3.
4.
5.
6.
7.
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)

. 19.

0UNIT SERVICE FACTOR

20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)

This Month 720.0 720.0 720. 0 1813952.6 594546 566128 100.0\\

100.0\\

107.7\\

97.7\\

23. UNIT FORCED Otr.'AGB RATF-
0. 0\\
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACHi:

Refueling Outage 4/25/98 39 days long

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTU
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 Mwe used as MDC Net prior to October 1985)

Yr-to-Date 8016.0' 7128.4 6971. 8 17202019. 6 5488652 5217002 87.0\\

87.0\\

89.2\\

80.8\\

13.0\\

Forecast DOCKET NO 50'-255, DATE 12-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

cumulative 227487.0 135225.6 130197.3 288806018.l 91555387 86484762 57.2\\

57.2\\

55.6\\*

47.2\\

27.0\\

Achieved