ML18067A623

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1997 for Palisades Nuclear Plant
ML18067A623
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/30/1997
From: Hawn R, Kobiata K
CMS ENERGY CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9707100106
Download: ML18067A623 (5)


Text

  • "..'*

(

I

    • Consumers Energy"))

A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 July 2, 1997 US Nuclear Regulatory Commission Document Control f>P.s~

Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a revised Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1997.

If you have any questions or concerns, please to contact me at (616) 764-3179.

Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades Senior Resident Inspector, Palisades DF:Hal"i;*;, Div of Rad nt3i:iii:i I Services, i.ansing, ivii BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9707100106 97_~ fi PDR ADOCK 05000255 R

PDR

~--

{'1 !'.') () 1 1 6*

<;} \\,) v.L r

)

I


'\\

(

\\ \\\\\\\\\\\\ \\\\\\\\\\ \\\\\\\\\\ \\\\\\\\\\ \\\\\\\\\\\\\\\\\\\\ \\\\\\\\ \\\\\\\\ \\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 5Q-255 UNIT ealjsagel2 DATE Q7LQ2L9.7 COMPLETED BY KAKQbi9l9 MONTH June TELEPHONE 16161764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

767

17.

7§1

2.

765

18.

7§1

3.

765

19.

7f!Q

4.

768

20.

747

5.

767

21.

151

6.

164

22.

155

7.

165

23.

743

8.

128

24.

lJ9.

9.

16§

25.

745

10.

166

26.

155

11.

165

27.

151

12.

1§1

28.

l5J

13.

121

29.

151

14.

1§9.

30.

119.

15.

1§8

31.
16.

1§0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 199T The Unit operated at 100 percent power the entire month.

REPORT MONTH JUNE 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS No.

Date Type' Duration Reason2 Method of Shutting Licensee System Code*

Component Code5 Cause & Corrective Action to

{Hours)

NONE

1.
2.

F: Forced Reason S: Scheduled A-Equipment Failure {Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other {Explain)

Event Down Reactor" Report #

3.

Method:

1-Manual

4.

Exhibit G - Instructions for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report {LER) File 4-0ther (Explain)

{NUREG-0161)

Prevent Recurrence

5.

Exhibit I - Same Source DOCKET NO

.50-255 UNIT Palisades DATE 07/02/97 COMPLETED BY KAKobiata TELEPHONE 616-764-2572

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY. (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 970601-970630 2530 811. 7 805

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10.. REASONS FOR RESTRICTIONS, IF ANY:

11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.. NET ELECTRICAL ENERGY GENERATED (MWH) 19~ UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 720.0 720.0 720.0 i814498.2 574762 546729 100.0\\-

100.0\\-

104. 0\\-

94.3\\-

0. 0\\-

24.. SHUTDOWNS SCHEDULEI: OVER THr: NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 4343.0 3817.2 3677.2 9000449.5 2880530 2737769 84.7\\-

84.7\\-

86.4\\-

78.3\\-

15.3\\-

Forecast DOCKET NO 50-255 DATE 7-2-97 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES:

Cumulative 223814.0 131914.4 126902.7 280604448.0 88947265 84005529

56. 7\\-

56.7\\-

55.0\\-*

46.6\\-

27.4\\-

Achieved